TTC 2019 – WG1 summary Feb TRIUMF, Vancouver

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
J. Branlard ALCPG11 – March 2011 – Eugene OR, USA Results from 9mA studies on achieving flat gradients with beam loading P K |Q L studies at FLASH.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
RF control and beam acceleration under XFEL conditions Studies of XFEL-type Beam Acceleration at FLASH Julien Branlard, Valeri Ayvazyan, Wojciech Cichalewski,
Plasma Cleaning of SRF Cavities Program Status J. Mammosser, S. Ahmed, L. Phillips Jlab S. Popovic, J. Upadhyay, L. Vuskovic, M. Nikolic ODU.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Recent Result for the STF-2 Cryomodule Operation
Cost Optimization Models for SRF Linacs
LCLS-II Technical Requirements
Field Emission Minimization for LCLS-II
Test of the dressed spoke cavity
WP5 Elliptical cavities
Requirements for Efficient CW SRF Cryomodules
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
WG3 Summary High current and CW accelerators
Studies Leader Report: 9mA webex meeting, 15th March 2011
WG-1 Session Cavity Performance Cryomodule Performance
Tuner system Zhenghui MI 2017/01/17
TTC - JLab - Bob Laxdal - TRIUMF
Update on HW commissioning
SNS Operational History
TTF module thermal modeling
R&D Activity for Field Emission and Vertical EP
SRF Section Cuvée 2014.
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
WG3: Main Linac SCRF(cavity,cryomodule)
High Q Cavity Operation in the Cornell Horizontal Test Cryomodule
CW Operation of XFEL Modules
TTC meeting, Feb. 6-9, 2018, Milan Trouble Shorting of CW Operation of Superconducting Linac for Chinese ADS Yuan He, Yongming Li, Xinmeng Liu, Zheng Gao,
CW accelerating module test progress at DESY
SCRF for cw operating XFEL
ERL2015 WG4: RF & superconducting RF for ERL
Nick Walker (DESY) EU GDE Meeting Oxford
C75 Commissioning Michael Drury SRF Operations Support
EU-XFEL summary of performance degradation
ILC Cryogenics -- Technical Design Report Planning
FRIB summary of performance degradation - VTA to cryomodule
Performance Recovery at CEBAF
Report of TTC-TB meeting at INFN-Milano
Welcome & Introduction
Workshop Aim Rongli Geng February 29, 2016
8-T Solenoid Package and Local Magnetic Shielding in FRIB Cryomodules
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
Strategic Communications at TRIUMF
Magnetic Field Sensors and Measurements in Cryomodules
Report of TTC-TB meeting at TRIUMF, UBC
Exceptional Events During the Operation of the European XFEL
Tom Peterson TESLA Technology Collaboration Meeting Feb 2019
Cool Down Studies of LCLS-II Cryomodules
Cryomodule Design for CW Operation 3.9 GHz considerations
Experience with the 112 MHz 4K SRF Gun for CeC PoP at RHIC
Summary of the maximum SCRF voltage in XFEL
Introduction WG2 Martina Martinello, Oliver Kugeler TTC Meeting 2019.
Tom Peterson TESLA Technology Collaboration Meeting Feb 2019
Residual Gases in CEBAF Warm Beam Line Sources and Evacuation
Presentation transcript:

TTC 2019 – WG1 summary 05-08 Feb. 2019 TRIUMF, Vancouver Julien Branlard, Rongli Geng

WG1 Performance limitation in operational facilities WG mission: Performance limitation in operational facilities including both elliptical and non-elliptical variants longer term operation of test facilities cavity performance experience Safe limits Multipacting limitations and mitigations Field emission Voltage and phase stability microphonics, Lorentz force detuning Vector sum (pulsed and cw) 4K vs 2K operation, trapped flux (local magnetic sources) cooldown dynamics 08.02.2019 TTC 2019 - WG1 summary

WG1.1 Cavity performance experience-safe limit Title Speaker Affiliation Long Term Operation of a Large Ensemble of SRF Cavities in CEBAF Arne Freyberger JLAB Long term experience with SRF cavities at ELBE  Peter Michel ELBE Summary of the maximum SCRF voltage in XFEL  Nick Walker DESY Operation and performance limits of the LHC cryomodule Katarzyna Turaj CERN Long term experience at INFN Legnaro  Giovanni Bisoffi INFN Overview of 12-year operation of the SCL at SNS  Sang-Ho Kim / John Mammosser ORNL 08.02.2019 TTC 2019 - WG1 summary

WG1.1 Cavity performance experience-safe limit Long term experience with SRF CEBAF running with original cryomodules (1990’s) and added new cryomodules since 2014 ELBE, LHC 17 years of operation ALPI running since 25 years and needs to go for another 20 years Eacc: general trend is down when you’re operating at the top, the only way is down Across the labs, mostly due to field emission 08.02.2019 TTC 2019 - WG1 summary

CEBAF 08.02.2019 TTC 2019 - WG1 summary

ELBE 08.02.2019 TTC 2019 - WG1 summary

WG1.1 Cavity performance experience-safe limit BUT SRF is a “survivor” (A. Freyberger) Mitigation approaches LHC: building spares CEBAF: refurbishment, maintenance, helium proc., avoid field emission by lowering gradient SNS: in situ plasma processing, spare cryomodules ELBE: partial gradient recovery through HPP ALPI : generation transition 08.02.2019 TTC 2019 - WG1 summary

CEBAF 08.02.2019 TTC 2019 - WG1 summary

SNS 08.02.2019 TTC 2019 - WG1 summary

WG1.1 Cavity performance experience-safe limit XFEL new but high statistics Particular case of VS (one cavity limiting 31) No degradation from HTS to tunnel (within error bars) On-going effort to assess and maintain max gradients 08.02.2019 TTC 2019 - WG1 summary

XFEL 08.02.2019 TTC 2019 - WG1 summary

WG1.2 Field emission and multipacting: experience and mitigation Title Speaker Affiliation Field Emission and Mitigation in the CEBAF Linacs  Bob Legg / Rongli Geng JLAB Exceptional events during operation of the European XFEL Mathieu Omet DESY Operational Experience of Cavity/CMs in ISAC-II QWR linac Zhongyuan Yao TRIUMF 08.02.2019 TTC 2019 - WG1 summary

Field emission and multipacting CEBAF Increased field emission over time He processing successful but not always Current approach is mitigation via cryomodule re-work and particulate control Plasma processing being considered EuXFEL Couple of examples of successful processing of field emitters Some cavities routinely operated in quench regime (cryo acceptable “soft” quench) Observed plasma discharges (e- quench) ISAC-II Maintenance and refurbishment program essential to increase available gradient Common issues: Q disease, magnetic pollution from solenoids, multipacting happens < 100 kV for QWR, field emission (residual gas after thermal cycle), Yearly warm up cool down (cost saving reasons but increase nb of issues) Multipacting processing in SEL  speed up process 08.02.2019 TTC 2019 - WG1 summary

CEBAF 08.02.2019 TTC 2019 - WG1 summary

XFEL 08.02.2019 TTC 2019 - WG1 summary

ISAC-II 08.02.2019 TTC 2019 - WG1 summary

WG1.3 Voltage and phase stability Title Speaker Affiliation LLRF system performance limiting factors during CW operation of high Ql cavities cryomodule Wojciech Cichalewski TUL LLRF compensation and mitigation of two cavity instability Ramona Leewe TRIUMF CEBAF C100 Fault Classification Based on Time Domain RF Signals Tom Powers JLAB Experience with LCLS-II cavity and cryomodule tests at Fermilab Elvin Harms FNAL 08.02.2019 TTC 2019 - WG1 summary

Field stability LCSL-II CMTB TRIUMF Cryomodule tests at FNAL (14/20), procedure Microphonics issues now under control Mass flow as preferred technique for Q0 measurement Coupler heating not an issue CMTB R&D program towards a CW EuXFEL Main challenge is CW in VS Static drops (manageable in SEL, but can be a real challenge in VS) Coupler heating leads to QL drop  more power for same gradient Cross coupling between neighboring cavities IOT as power source: non linear behavior TRIUMF E- linac (2 cavities operated in VS) Ponderomotive oscillations Analytical derivation to identify conditions leading to unstable behavior Unclear if piezo can offer a possible mitigation : to be tested 08.02.2019 TTC 2019 - WG1 summary

CW in VS 08.02.2019 TTC 2019 - WG1 summary

CW tests at CMTB 08.02.2019 TTC 2019 - WG1 summary

Field stability CEBAF Fault analysis using fault logger Time consuming task to identify and categorize faults Use data to perform machine learning and help identify common fault signatures Help operators take the right action ( smaller impact on gradient) Fault classification 08.02.2019 TTC 2019 - WG1 summary

WG1.4 2K versus 4K operations, He induced microphonics Title Speaker Affiliation The 8T solenoid and the local magnetic shielding in the FRIB cryomodules Kenji Saito MSU Comparision of 4K/2K operation performance CEBAF injector cryomodules Grigory Eremeev JLAB Experience with the CeC PoP 4K 1/4 Wave Photocathode Gun and 2K 5-Cell Cavity at RHIC Kevin Smith BNL Experience with cryogenics-induced microphonics on LCLS-II cryomodules Tom Peterson SLAC Commissioning of 704 MHz SRF Booster Cavity for LEReC Wencan Xu 08.02.2019 TTC 2019 - WG1 summary

WG1.4 – Microphonics, 2K versus 4K FRIB Local magnetic shielding developed and applied Demonstrated comparable Q0 with mu-metal for magnetic shield JLAB 4K vs 2K comparative test of two cryomodule designs Original cryomodule design permits large gradients at 4K close to 2K 4K test with beam : not significant difference in terms of beam quality BNL Multipacting issues  hard to condition away Developed a procedure for overcoming multipacting FNAL Valve leak at the origin of He gas bubbles Once problem understood, detuning +/- 40 Hz  +/- 20 Hz BNL (LEReC) Conversion of SRF gun cryomodule to and SRF booster cryomodule Issue with microphonics Conditioning of field emitter during operation 08.02.2019 TTC 2019 - WG1 summary

From TTC chairman’s report 08.02.2019 TTC 2019 - WG1 summary

Foster synergies and collaborations Microphonics oscillations mitigation in vector sum control TRIUMF DESY Efforts on-going for root cause studies – more needed Instrumentation needed for FE studies and perhaps operation control. More effective techniques for rapid performance recovery from FE needed. JLAB SLAC … 08.02.2019 TTC 2019 - WG1 summary

Lessons learnt Fortunate to have speakers who are “not conventional TTC participants”, valuable point of view for TTC Not enough time for discussion during session Schedule less talks More time for discussion We proposed a structure for WG1 talks: Problem statement, known solutions, future tests, proposed collaboration Several talks followed More needed - Focus on issues, (not a PR talk) 08.02.2019 TTC 2019 - WG1 summary

Thank you to all WG1 speakers and thank you for your attention! 08.02.2019 TTC 2019 - WG1 summary