Southwood/Fargo Country Club Flood Risk Management Project

Slides:



Advertisements
Similar presentations
Status Report on Administrative Response to December 11, 2006 Alleghany Co. School Board Resolution on Alleghany High School Presented by Dr. Robert P.
Advertisements

City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Fargo Flood Control Southside Flood Protection Prairie View Estates Fargo, ND October 2, 2008.
University of Kentucky Campus Physical Development Plan Update.
FY12 and FY13 Budget Development Special Board Meeting Alachua County Office of Management and Budget August 4, 2011.
Southside Flood Protection Red River Channel Extension September 15, 2008.
Southside Flood Protection
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
PROGRESS REPORT JULY 2012 Published August 20, 2012.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Fire Station #39 Rehabilitation Update City Council Open Session February 6, 2012.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
FAMILY LIFE CENTER Building Committee Update November 23, 2014.
Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Jeff Graves Senior Project Manager/Geological Engineer.
WEATHER BY: JENNIFER FAUTH KINDERGARTEN.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
December 3, 2015 TOWN OF MILLBURY DPW, MA Robert McNeil, P.E., Director PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer This project.
Oakcreek, Copperfield Court, and Coulee’s Crossing Area Flood Risk Management Project City of Fargo Oakcreek, Copperfield Court, and Coulee’s Crossing.
Transportation infrastructure: Are bridges an area of concern? Ryan Church and Jason Mumbach September 17, 2008.
© T Madas.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
City Meter Reader Operations October 22, Agenda Review Current Meter Operations Review Current Meter Operations Annual Number of Meter Reads Annual.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
Coastal Development Permit for Geotechnical & Archaeological Investigation Application No Agenda item W14e Feb. 9, 2011 Shea Homes/Parkside Estates.
DAVIS SR. HIGH SCHOOL ALL-STUDENT CENTER (MULTIPURPOSE BUILDING) PROGRAMMING OPTIONS August 6, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
August 6, 2013 LAKE FORREST DRIVE UPDATE. sandyspringsga.gov Lake Forrest Drive Update  Actions To-Date Work Orders – 13 since 2009 for clean-up, 8 of.
Wyoming Association of Rural Water Systems Harry LaBonde Jr, P.E. Director Wyoming Water Development Office April 19, 2016.
City of Johnston NW55th Avenue Improvements Public Open House June 24, 2014.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
ND Downstream Watersheds Comprehensive Detention Planning
Data Center Stabilization
Facilities Master Plan
San Mateo – Foster City School District
Project Status & Right-of-Way Acquisition
Time Series: Domain  Global Analysis “Monthly Precipitation”
Green Line Train Protection System
DICKINSON AVENUE RECONSTRUCTION
Main Street Improvements
Pre-Construction Services
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Albeni Falls Dam Operations
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Board of Regents Las Cruces: Chihuahuan Desert Rangeland Research Center –tOWER Acquisition Heather Watenpaugh University Architect Robert Herrera.
Part-Time MBA Class of 2010 Kick-Off Meeting October 2, 2009.
FEMA FLOOD INSURANCE STUDY UPDATES
Calendar.
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Walker Street Reconstruction Project 25% Design Public Hearing
DSC ChMC CSS update 09th January 2019
I-25 Widening - Land Donation at SH 402
Cut and Paste Phases from PDF Datasheets EXAMPLE And insert here Visit
Wales’ New Qualifications BACH National Annual Conference – March 2019
Ward Park Restroom Timeline
I Street Bridge Replacement Project
Sacramento Environmental Commission January 2019.
Pre-Proposal Meeting Request for Qualifications
Larimer County: engineering
Presentation transcript:

Southwood/Fargo Country Club Flood Risk Management Project Neighborhood Meetings July 20, 2011

Southwood/Fargo Country Club HOW WE GOT HERE PETITION RECEIVED THIS PAST WINTER FROM NEIGHBORHOOD REQUESTING A LEVEE PROJECT IN REAR YARDS EMERGENCY LEVEE CONSTRUCTED PRIOR TO THIS PAST SPRING’S FLOOD

Southwood/Fargo Country Club Emergency Levee – As Built BUILT TO AN ELEVATION OF 44-FEET

Southwood/Fargo Country Club – Across Course Levee ALIGNMENT DESIGNED BY FARGO COUNTRY CLUB’S ARCHITECT ONLY POSSIBLE ALIGNMENT ACROSS THE COURSE THAT WILL NOT RESULT IN SAFETY ISSUES FOR THE COURSE PORTION OF SOUTHERN END WITHIN THE FLOODWAY

Southwood/Fargo Country Club – Across the Course Levee GEOTECHNICAL STUDY COMPLETED STUDY SHOWED THAT THE FACTOR OF SAFETY FOR THE LONG TERM STABILITY WOULD NOT BE MET ANALYSIS DID NOT FACTOR IRRIGATION OF DRIVING RANGE INTO IT

Southwood/Fargo Country Club – Permanent Levee Option CLOSELY FOLLOWS EMERGENCY LEVEE ALIGNMENT ACTUAL ALIGNMENT WILL BE REVIEWED FURTHER CENTERED ON PROPERTY LINES FROM 521 TO APPROXIMATELY 909 SOUTHWOOD DRIVE BUILT TO AN ELEVATION OF 42.5-FEET PLUS 1-FOOT

Southwood/Fargo Country Club – Schedule JULY 20, 2011 – PUBLIC MEETING JULY 27, 2011 – BACKYARD WALKTHROUGH AUGUST 22, 2011 – CALL FOR BIDS SEPTEMBER 14, 2011 – OPEN BIDS SEPTEMBER 19, 2011 – AWARD BIDS OCTOBER 3, 2011 – CONTRACT AWARD, CONSTRUCTION BEGINS SHORTLY AFTER SPRING 2012 – FINAL COMPLETION FALL 2012 – PHASE 2 CONSTRUCTION FUTURE NEIGHBORHOOD MEETINGS WILL BE HELD

Questions?