LHC Status Fro Morning 9-Sep

Slides:



Advertisements
Similar presentations
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
Advertisements

LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
LHC Status Fri Morning 3-June
LHC Status Tue Morning 22-Aug
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Machine Coordinators: G. Arduini, J. Wenninger
Wednesday September 14th
Monday fill with 1092 bunches (6 h stable beams)
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Monday 11/07: Recovery Plenty of accesses.
Summary week 36 Coordination by B. Holzer & J. Wenninger
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Monday 6th August & night
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Bernhard Holzer, Joerg Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Coordination by E. B. Holzer & J. Wenninger Production
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Week 36 plan Todo’s: And also: 12+b injection.
LHC Status Sun Morning 20-Mai
Week 35 – Technical Stop and Restart
Monday Morning – recovery from cryo.
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
Finally.... We had to wait a long time.... We had many problems....
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 03/11 – The Plan Finish electron-cloud program:
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Sunday/Monday & :30 Stable beams. Fill #1851.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 14:00 beam dump Access:
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
LHC Morning Meeting - G. Arduini
Friday 25 bunch fill dumped just before (BLM in 5)
Tuesday morning 08:30-09:00 Squeeze with probe.
Summary week 18 Intensity ramp up & production
Thursday – Morning Energy matching at injection with H CODs
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Saturday :42 stable beams fill 3541
Friday morning 08:00 Stable beams with 840b.
LHC Morning Meeting - G. Arduini
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Monday 27th August & night
Wednesday morning / afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Presentation transcript:

LHC Status Fro Morning 9-Sep Bernhard Holzer, Joerg Wenninger Week 36: Todo’s: Ramp up for stable beams: 264 – ≈ 5h 480 – short fill 912 – long fill 1380 – finally !!

Thu Morning Injection: a bit of a problem at the pre- Accelerators (49641.7) 912 912 Squeeze & Adjust: “butter weich” 8/1/2019 LMC - beta* 1 m

Thu Morning Atlas Lumi-Scan: done A real nice 912b * 1m*10h = 50 pb -1 fill (49641.7) Atlas Lumi-Scan: done LHCb so sorry: was above 300. We separated it with lumi scans in V to get < 100. We incorporate this additional separation for the next fill. 8/1/2019 LMC - beta* 1 m

Thu Late: Injection: minor problem: RQT12.R1B1 tripped during combo at -284 A. External interlock from QPS. injection losses ok ... at 144 bunch transfer !! some problems with last transfers of beam 2.

Thu Late: 21:04h Ramp & Flat Top: Losses on TCTV.4R2 at flat top. High interaction rates in ALICE. 21:04h Vacuum According to the vacuum display, there is no communication with the valves in sector 23.PLC disconnected @ 21:04 (PLC ... SEU ?)

Thu Night: 22:05h Squeeze & Dump 02:09h Injection: ... ok Dump Classification: Collimator position not correct “The measured gap exceeded the beta* limits for several collimators in IP1 and IP5.” position limits as a function of time were tightened with respect to the values used for beta* = 1.5 m. 2) Limit functions for the collimator gaps as a function of beta*were extended to cover the range < 1.5m. 02:09h Injection: ... ok

Thu Night: 02:57h Dump ... Cryo 04:03h Injection high heat loads in sector 45 (with 60 buches circulating !) 04:03h Injection 05:10h Ramp, Squeeze, Lumi and again Alice background ...

Thu Night: 05:10h Lumi 06:51h Dump 50 pb -1 Beams dumped, sector 45 lost Initiating event: the quench loop of Q8.L5 was opened

Resume: Todo: Alice ?? stable conditions