METRO RAIL IN CHENNAI Prepared by S.PRABHAVARAJAN LECTURER.

Slides:



Advertisements
Similar presentations
CE 320 Innovative Education-- snaptutorial.com
Advertisements

CIS 307 Innovative Education-- snaptutorial.com
CIS 328 Innovative Education-- snaptutorial.com
CIS 401 Innovative Education-- snaptutorial.com
CIS 407 Innovative Education-- snaptutorial.com
CIS 413 Innovative Education-- snaptutorial.com
CIS 436 Innovative Education-- snaptutorial.com
CIS 443 Innovative Education-- snaptutorial.com
CIS 462 Innovative Education-- snaptutorial.com
CIS 474 Innovative Education-- snaptutorial.com
CIS 3303 Innovative Education- -snaptutorial.com
CIS 555 Innovative Education-- snaptutorial.com
CJ 211 Innovative Education-- snaptutorial.com
CJ 227 Innovative Education-- snaptutorial.com
CJ 216 Innovative Education-- snaptutorial.com
CJ 140 Innovative Education-- snaptutorial.com
CJ 120 Innovative Education-- snaptutorial.com
CJ 325 Innovative Education-- snaptutorial.com
CJ 328 Innovative Education-- snaptutorial.com
CJ 290 Innovative Education-- snaptutorial.com
CJ 350 Innovative Education-- snaptutorial.com
CJ 345 Innovative Education-- snaptutorial.com
CJ 355 Innovative Education-- snaptutorial.com
CJ 490 Innovative Education-- snaptutorial.com
CJ 503 Innovative Education-- snaptutorial.com
CJ 598 Innovative Education-- snaptutorial.com
CJ 512 Innovative Education-- snaptutorial.com
CJ 516 Innovative Education-- snaptutorial.com
CJA 498 Innovative Education-- snaptutorial.com
CM 250 Innovative Education-- snaptutorial.com
CJE 2580 Innovative Education--snaptutorial.com
CM 310 Innovative Education-- snaptutorial.com
Norton Antivirus Tech Support in UK
Avira Antivirus Customer Support in USA
WELCOME TO NORTON TECHNICAL SUPPORT
Avast Technical Support Phone Number In USA
Mozilla Firefox Technical Support Toll Free Number
McAfee Help Number McAfee Help Number offers the best of antivirus support by the dialling of the toll-free number that is mentioned.
facebook Support Number
Quickbooks outlook is not responding
How to Change your Start Page on Mozilla Firefox?
Current Affairs Quiz.
Roadrunner Technical Support
Fix Canon Scanner Software Issues
Binance Customer Support Number

Multiple Choice Quiz.
Sage 100 Contractor support
Gmail Password Recovery
FRACTIONS MULTIPLICATION
Exam pattern for SSC CGL
Yahoo Product Data Entry Services
Data Analytics Course Shaping Global Managers through Practical Learning
Six Sigma Yellow Belt Certification
Leading Manufacturers and Exporters of Power Transformers
Leading Manufacturers and Exporters of Electrical Transformers

Electrical Maintenance Training
India Mattress Market.
Real Estate Marketing Strategies
Insolvency and Bankruptcy Code 2016
Orchid Mixes From Green Barn Orchid Supplies
UNIT-II PARTS OF COMPUTER
BENEFITS AND CHALLENGES OF BLOCKCHAIN IN IOT DEVELOPMENT
LOGISTICS INDUSTRY IN INDIA.
The Best SEO Service Provider Company in India

Uses of steroids.
Hydroponics - An Effective Way To Grow Vegetables And Fruits
Presentation transcript:

METRO RAIL IN CHENNAI Prepared by S.PRABHAVARAJAN LECTURER

INTRODUCTION Chennai Metropolis has been growing rapidly and the traffic volumes on the roads have also been increasing enormously. Hence the need for a new rail based rapid transport system has been felt and towards this objective the Government of Tamil Nadu have decided to implement the Chennai Metro Rail Project. This project aims at providing the people of Chennai with a fast, reliable, convenient, efficient, modern and economical mode of public transport, which is properly integrated with other forms of public and private transport including buses, sub-urban trains and MRTS.

INTRODUCTION The Government of Tamil Nadu created a Special Purpose Vehicle (SPV) for implementing the Chennai Metro Rail Project. This SPV named as "Chennai Metro Rail Limited" was incorporated on 03.12.2007 under the Companies Act. It has now been converted into a Joint Venture of Government of India and Government of Tamil Nadu with equal equity holding.

PLANNING A total of 7 lines have been planned by the DMRC for the Chennai Metro network. Two routes are currently under construction as part of the first phase, with several planned for future phases of the metro network. Line 1 Tiruvottiyur Line 2 Chennai Central Line 3 Mogappair Line 4 Porur Line 5 Ring Road Line 6 Radhakrishnan Salai Line 7 Along NH5 Road

CONSTRUCTION HISTORY Construction started on 10 June 2009 with the piling work for the elevated viaduct between Koyambedu and Ashok Nagar stretch. The construction work on the project was suspended on 9 August 2012, following an accident that killed a worker and injured six others, a day earlier. The project is estimated to cost around  146 billion (US$2.3 billion) for the two corridors totaling 45 km. The estimated construction cost of Underground and Elevated Station will be Rs1 billion and Rs3 billion respectively.

DESIGN OF METRO CORRIDORS The lines of Chennai Metro are double-tracked ones. The average height of the tracks will be 12 m, which increases at two points, namely, above the Vadapalani flyover where it reaches about 18 m and over the Kathipara grade separator where the height reaches a maximum of about 25 m. The underground stretch will run at a depth of 17 m below the street level. The Metro corridor accommodates a complex structure over the Kathipara grade separator. Technically called the balanced cantilever, it is a bridge-like structure at a height of about 25 m above the street, connecting the Metro corridor on both sides of the grade separator.

PHASES AND TERMINALS Line 1 Washermanpet Line 1 Extension Wimco Nagar Chennai central

Interesting, right? This is just a sneak preview of the full presentation. We hope you like it! To see the rest of it, just click here to view it in full on PowerShow.com. Then, if you’d like, you can also log in to PowerShow.com to download the entire presentation for free.