Radiation fields During 1st stage beam commissioning

Slides:



Advertisements
Similar presentations
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Advertisements

CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
CW neutron source Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus Alonso, Lali Tchelidze 6/30/11 Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
C. Theis, D. Forkel-Wirth, S. Roesler, H. Vincke.
BROOKHAVEN SCIENCE ASSOCIATES Radiological Design Considerations of Synchrotron Radiation Facilities P.K. Job Radiation Physicist National Synchrotron.
RF background, analysis of MTA data & implications for MICE Rikard Sandström, Geneva University MICE Collaboration Meeting – Analysis session, October.
Lali Tchelidze Safety work package leader
ESS DTL beam commissioning
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Shielding calculation for ESS accelerator Lali Tchelidze TAC meeting April 2, 2014.
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
The Status of ESS Accelerator Shielding and Accident Scenarios Lali Tchelidze May 26, 2014.
Anders Sunesson RF Group ESS Accelerator Division
Alpha and Beta Interactions
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Alexander Aleksandrov Oak Ridge National Laboratory
R. Miyamoto, Beam Loss and Collimation in the ESS Linac, HB Beam Loss and Collimation in the ESS Linac Ryoichi Miyamoto (ESS) B. Cheymol, H. Danared,
Managed by UT-Battelle for the Department of Energy Residual Does Rate Analyses for the SNS Accelerator Facility I. Popova, J. Galambos HB2008 August 25-29,
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Shielding Measurements For A Proton Therapy Facility S. Avery, K. P. Risolo, M. Bartels, C. Ainsley, J McDonough, R. L. Maughan University of Pennsylvania.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
0 Plenty Energy Clean Environment Healthy Life Commissioning and Initial Operation of the KOMAC 100-MeV Proton Linac KOMAC / KAERI Kyung-Tae Seol
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Overview of HINS Operations and Radiation Shielding Considerations in the Meson Detector Building Bob Webber August 16, 2006.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Summary of radiation shielding studies for MTA Muon production at the MiniBooNE target Igor Rakhno August 24, 2006.
ESS wire scanner Benjamin Cheymol
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
EURISOL DS Task meeting Orsay, 07 Janvier Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Prompt dose upstream the 12-ft concrete shielding blocks Igor Rakhno May 4, 2007.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
ESS Front End diagnostic
Radiation protection studies for the ESS Activation issues AD seminar Michał Jarosz , Lund.
Dark Current and Radiation Shielding Studies for the ILC Main Linac
UK Neutrino Factory Conceptual Design
MARS15 Simulation of Radiation Environment at the ESS Linac
Radiation protection of Linac4 M. Silari Radiation Protection Group
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
1- Short pulse neutron source
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
ERL accelerator review. Parameters for a Compton source
Andreas Jansson, Lali Tchelidze
ESHAC meeting October 1-2, 2018
HiPoSpaNS High Power Spallation Neutron Source
Beam Commissioning at ESS
RF systems introduction
Ciprian Plostinar Workshop on Testing and Commissioning
Operations Section Leader
Maximum Credible Beam Event Paul Emma et al
(Beam) Commissioning Plan
High Level Readiness Reviews
Beam Commissioning Planning
Lessons from the 1st Safety Readiness Review
RF introduction Anders Sunesson RF group leader
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Accelerator Installation Schedule
Radiation Detectors for the PSS1 at ESS
CEPC Radiation and Shielding
ACCSYS Collaboration Board Triestre, 3rd october 2017
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Radiation fields During 1st stage beam commissioning Lali Tchelidze AD Safety Group for the ACCSYS Project Critical Design Review of Radiation Monitors for the PSS1 March1, 2017

1st stage beam commissioning layout

ESS war linac Warm linac: Ion source LEBT RFQ (3.6 MeV) MEBT DTL (90 MeV) - commissioning planned up to DTL tank 4 (75 MeV)

Sources of radiation Sources of ionizing radiation: Proton beam losses (assumption 1 W/m during normal operation, full beam loss during worst accident) Proton beam on commissioning beam dump X-rays from RF conditioning

Proton beam losses

Calculation geometry model N. Mokhov et al.

Radiation fields in the tunnel Normal operation: 1 W/m from five DTL tanks N. Mokhov et al.

Radiation fields in the klystron gallery Normal operation: 1 W/m from five DTL tanks Total prompt dose rate < 1.2 μSv/h Accidental full beam loss Total prompt dose rate < 120 mSv/h N. Mokhov et al.

Radiation fields in the front end building Normal operation: 1 W/m from five DTL tanks and RFQ Total prompt dose rate < 0.1 μSv/h R. Bevilacqua

Proton beam on beam dump

Radiation fields outside shielding chicane Beam parameters will be chosen such that the total dose rate outside of the shielding chicane is < 3 μSv/h. K. Batkov

Radiation fields at various steps of 1st stage beam commissioning K. Batkov

Radiation fields at various steps of 1st stage beam commissioning K. Batkov

Radiation fields at various steps of 1st stage beam commissioning Commissioning beam parameters will be chosen to respect 3 μSv/h at accessible areas during beam on. K. Batkov

X-rays during RF conditioning

Radiation fields during RF conditioning X-rays are expected as RF power is applied to accelerator components No estimates/measurements exist at this stage Assumption is that X-ray field is fully attenuated with the shielding designed for neutrons

Q&A Do you need/want to monitor both sources of radiation ? With the same or different detectors? It is mandatory to monitor neutron field. I think it could be valuable to monitor X-rays as well, to gain confidence that they are truly fully attenuated by the shielding. 2 GeV - This is only for the full PSS so not part of the scope of this document? Correct. Thus only radiation fields relevant for PSS1 is presented and discussed here. It would be meaningful add the max. expected dose per pulse (including the pulse length and repetition rate). Depending on commissioning mode (fast beam, slow tuning beam, etc.) we can always make quick scaling. Are these the maximum expected levels for the ‘Condition’ ? What would be the associated alarm thresholds in these areas? Maximum expected levels are reported during beam commissioning, not RF conditioning. What is the reason for the changing g/n ratio for Zone 1 and 2 ? First of all, the ratios are very approximate. The reason for changing the ratio is because the neutron production starts at the end of RFQ, at energy 2.6-2.7 MeV. Is this referring only to the photon component accompanying the neutron field or is there another gamma/X-ray source? Usually we call gammas, the photons associated with the proton beam and X-rays, the photons associated with RF power. Although your proton beam goes up to 75 MeV, your moderated and scattered neutron spectra may not be that highly energetic. Do you have radiation spectra at the monitoring locations ? If the neutron energies are below 20 MeV this might relax the requirements for the detector. We don’t have particle spectra. The continuous/quasi continuous is X ray only and coming from RF ? Is it limited only to the klystron gallery above the accelerator tunnel ? Yes, usually we call X-rays, the photons associated with the RF.

Thank you!