European RPAS Steering Group First Meeting 6 July 2012.

Slides:



Advertisements
Similar presentations
Why does ERA Need to Flourish
Advertisements

A 2030 framework for climate and energy policies Marten Westrup
ASTM International Officers Training Workshop September 2012 Pat Picariello, Director, Developmental Operations 1 Strategic Planning & New Activity Development.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Strategic Planning & New Activity Development September 2013.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
1 Agenda item 4: Work modalities of the revised ISDR system to support the implementation of Hyogo Framework- Elements to be reviewed in groups- & prepare.
Delivering as One UN Albania October 2009 – Kigali.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
1 Welcome Safety Regulatory Function Handbook April 2006.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
How does ETSI work? ETSI Seminar © ETSI All rights reserved.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
Research and Innovation Why does ERA Need to Flourish ERA – State of Play ERA Monitoring and ERA progress report Fabienne Gautier Dublin, 14th June 2013.
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
UAS: Regulatory developments in EASA Michael Smethers Chairman of EASA Management Board 13 September 2011.
1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September , 2011.
REALIZING BOSNIA AND HERZEGOVINAS EUROPEAN POTENTIAL: FROM POST-CONFLICT TO PRE-ACCESSION FROM DAYTON TO BRUSSELS - PROGRESS ON EU INTEGRATION - Mr. Adnan.
European Innovation Partnerships State of Play Presentation to Council's Research Working Party 4 February 2013.
EASA and the EU Regulatory Framework
The Implementation Structure DG AGRI, October 2005
The European Qualifications Framework (EQF)
THE CERTIFYING AUTHORITY
The Managing Authority –Keystone of the Control System
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
ENEF WG Risks / Bernard Fourest 12 September 2012 PRAGUEBRATISLAVA ENEF WG RISKS Current activities of the SWG Nuclear Installation Safety Bernard Fourest.
ENERGY FOR MAYORS - Genova International Workshop for Supporting Structures of the Covenant of Mayors: Focus on tools Thursday 19th May 2011, Genova, Italy.
UNFCCC secretariat, programme Fleur Newman, Programme Officer Breakout session 4.2 Procedure on significant deficiencies CMP & EB Mandates and 2012 Process.
The Single European Sky ATM Research (SESAR) initiative
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
1 Performance indicators, targets, steering Technical Interchange meeting Toulouse, May 2002 Xavier FRON Head Performance Review Unit.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
BUILDING THE CAPACITY TO ACHIEVE HEALTH & LEARNING OUTCOMES
New EU Forest Strategy and Update on Forest Information and Monitoring
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
1 September 27 and October 1, Introduction Jenny Hartfelder– Speaker, Rocky Mountain WEA Janet Hurley Cann– Speaker-Elect, WEA of South Carolina.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
Management Plans: A Roadmap to Successful Implementation
Presentation of the proposed Annex 19 – Safety Management
European Innovation Partnership on Water Durk Krol Director WssTP.
Effectively applying ISO9001:2000 clauses 6 and 7.
1 The interconnection of business registers Judit Fischer – DG Internal Market and Services Budapest, 14 June 2010.
/1 Transparency Challenge Panel March / Welcome & Introductions Suzanne Wise Strategy Consultation Overview of responses and next steps.
CBP BMP Verification Program Development: Requests for Decisions on Panel Membership and Revised Schedule CBP Partnership Management Board September 13,
1 INAC First Nation Education Policy Framework Regional Dialogues Coordinated by AFN and INAC Education Policy Framework - Joint Steering Committee (EPF-JSC)
VOORBLAD.
SAI Performance Measurement Framework
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Strategic Financial Management 9 February 2012
© 2012 National Heart Foundation of Australia. Slide 2.
Digital Agenda Unleashing the Potential of Cloud Computing in Europe Ken Ducatel Head of Unit Software and Services, Cloud European Commission (Directorate.
Contents of the Presentation
1 The Data Protection Officer at work Experience, good practices and lessons learnt Pierre Vernhes – former DPO at the Council of the EU Workshop on Data.
25 seconds left…...
Department of Nuclear Safety and Security
African Aviation Training Organization
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
NMP-NCP meeting - Brussels, 27 Jan 2005 Towards FP 7: Preliminary principles and orientations… Nicholas Hartley European Commission DG Research DG Research.
Opening the European market for civil drones in an appropriate way: the role of the EU Jean-Pierre LENTZ European Commission DG Growth.
Cultural Heritage and Global Change: a new challenge for Europe Working for strengthening the European Research Area Towards Joint Programming in Research.
6 April Research for a secure Europe Christiane BERNARD European Commission - DG Enterprise and Industry Athens.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
Safety Management in Europe European Organisation for the Safety of Air Navigation Dr. Erik Merckx EUROCONTROL Directorate ATM Programmes Head of Business.
Workshop on “EU Enlargement: Regulatory Convergence in Non-acceding Countries” Athens 7 – 8 November 2003 Regulatory Convergence and Technical Standards.
Session 2 European Regulatory Environment (just a part!)
Presentation transcript:

European RPAS Steering Group First Meeting 6 July 2012

Agenda Welcome and opening 1. Outcome of the UAS Panel Process 2. Objectives and description of the ERSG 3. Structure and main content of the Roadmap 4. Roadmap definition working arrangements. 5. Adoption of the Terms of Reference 6. Preliminary discussion on the Roadmap and contribution from the ERSG members AOB 2

2 2 Objectives and description of the ERSG Outcome of the UAS Panel Process 3 3 Structure and main content of the Roadmap 4 4 Roadmap definition working arrangements. 3

The UAS Panel Process Consultation process made of 5 workshops Industry and Market (UVSI) Air space Insertion and Radio Frequencies (ECTL) Safety (EASA) Societal Dimension (Prof. Roma) R&D (EDA) Discussion Papers and Conclusions available at 4

Commission Staff Working Paper EC will issue a SWP Summarizing the conclusions of the UAS Panel Process Providing a common understanding on the issues at stake and the actions needed To be issued in July 5

Conclusions of the UAS Panel Great potential justifying EC support Active contribution from industry Important civil applications & market potential (jobs & growth) Barriers identified Air Traffic Insertion is urgent and complex Others like insurance, privacy, public acceptance 6

Conclusions of the UAS Panel (2) Call for an initiative led by the European Commission to reinforce coordination between all European actors, to identify a common roadmap toward a progressive insertion, to "institutionalise" the process. 7

Commission follow-up to UAS Panel Setting-up a European RPAS Steering Group ERSG to provide a framework to enhance the coordination of the activities necessary to achieve the initial safe insertion of all type of RPAS into the European air traffic progressively from 2016 to contribute to the development of harmonized rules for all RPAS in Europe, including for those with a take-off mass below 150kg currently falling under national competency. 8

2 2 Objectives and description of the ERSG Outcome of the UAS Panel Process 3 3 Structure and main content of the Roadmap 4 4 Roadmap definition working arrangements. 9

Objective of the ERSG "Foster the development of civil RPAS by planning and coordinating all the activities necessary to achieve the initial safe insertion of RPAS into the European air traffic by 2016" (ToR p2) Objective to be achieved by Identifying all the activities to be performed to reach the objective Coordinating the activities and contributions of all stakeholders in the most efficient way Monitoring the progress towards the objective 10

ERSG working method (1) "The ERSG will be responsible for developing and monitoring the implementation of a comprehensive Roadmap setting the milestones, the distribution of tasks among the stakeholders and the timing for the insertion of RPAS in the European airspace" (ToR p2) The Roadmap will be the main tool of the ERSG: The ERSG will adopt the Roadmap and its periodical updates. Doing so, each organisation will commit his organisation to the tasks agreed in the Roadmap. The ERSG will also be the place where to solve any potential issue concerning the definition and implementation of the Roadmap. 11

ERSG working method (2) "The ERSG will be responsible for developing and monitoring the implementation of a comprehensive Roadmap setting the milestones, the distribution of tasks among the stakeholders and the timing for the insertion of RPAS in the European airspace" (ToR p2) The ERSG will set-up appropriate working arrangements to establish and update periodically the Roadmap; ensure a proper monitoring of the work linked to its implementation. 12

Condition for success "The success of this initiative will heavily depend on the commitment of all organisations and industries involved, to cooperate in achieving the objectives set by the ERSG and their willingness to contribute with own resources and technical expertise to the work necessary to reach RPAS ATI" within the agreed timeline (ToR p2) Commitment of each member to contribute to the work with own resources and expertise coordinate its activities with the others comply with the agreed decisions adopted in the roadmap 13

Membership of the ERSG "The European RPAS Steering Group is composed of organisations/groups representing the main European stakeholders involved in RPAS, experts in the area and the relevant Commission services. (ToR p3) Coordination process based on the good-will and trust of participants (cfr "Open Method of Coordination") Need to involve representatives of the main organisations involved in the work (regulatory, research, etc) to be performed to achieve RPAS ATI Open to additional participation if deemed necessary (research centres?) 14

Additional objectives The ERSG could have additional objectives if found useful, like maintaining an overall coordination with international bodies like FAA ???? 15

2 2 Objectives and description of the ERSG Outcome of the UAS Panel Process 3 3 Structure and main content of the Roadmap 4 4 Roadmap definition working arrangements. 16

Structure of the Roadmap (1) One Roadmap with 3 areas of activities well- coordinated Regulatory Research and development Complementary measures Liability / insurance Privacy/ data protection Public perception 17

Structure of the Roadmap (2) … and 2 level of details an overall vision Providing a complete high level planning tool, towards full insertion of all type of RPAS Setting priorities and intermediate milestones Identifying quick wins Missing in Europe until now A detailed rolling work plan for each of the 3 areas Allowing close coordination of all activities Over the next 2/3 years To be updated on a yearly basis 18

Content of the Roadmap (1) The Regulatory work plan should include A detailed planning of all the regulatory deliverables to be developed with the contribution of the relevant stakeholders (Eurocontrol, EUROCAE, JARUS) under EASA's leadership Including all activities needed to put in place common rules for RPAS > 150 kg and Make available harmonized rules for RPAS < 150 kg 19

Content of the Roadmap (2) The R&D work plan should include A detailed technology development plan coordinated with the regulatory work Proposals on the required instruments to implement the R&D effort In order to assess the possibility to support some of this work through the Horizon 2020, EC needs by September ? : a clear indication concerning the preferred R&D instrument (stand-alone JTI, SESAR extension, open calls, etc) by October ? a first priority list of technology developments? 20

Content of the Roadmap (3) The work plan on complementary measures Should analyse and provide recommendations on issues linked to Liability / insurance Privacy : data protection Should propose measures to increase public acceptance of RPAS 21

Deadlines The following deadlines are proposed: A first issue of the Roadmap should be available by end of the year A more detailed version developed in the course of 2013 Then the roadmap should be updated on a yearly basis. 22

2 2 Objectives and description of the ERSG Outcome of the UAS Panel Process 3 3 Structure and main content of the Roadmap 4 4 Roadmap preparation 23

Basic principles The following rules drive the preparation of the Roadmap Every ERSG member is free to contribute to each of the 3 areas of the Roadmap Each ERSG member is expected to contribute in areas where he has prominent competency Inputs from other sources may also be included when relevant (research centres, ULTRA project) 24

Working arangements Proposed working arrangements The ERSG will appoint 3 rapporteurs (1 per area) The ERSG members are invited to nominate experts from their organisation in any of the 3 area to work with the rapporteur Rapporteurs will deliver the draft roadmap to an Integration Team (EC + Rapporteurs) The Integration Team will ensure completeness and coordination of the roadmap deliver it to the ERSG for adoption 25

ERSG Experts (R&D) Raporteur Experts (Regulation & RF) Raporteur Experts (Complementary measures) Raporteur Director MOVE Deputy – Director General ENTR Roadmap Integration Team ROADMAPROADMAP ENTR D4MOVE E2 MOVE E3 RTD H3 Board Working Level RTDEASAECTLEDAESAASDUVSI ad-hoc expert EUROCAE SESARJARUS ECAC Other services 26

Nominations (1) Proposed Rapporteurs Regulatory EASA: Filippo Tomasello R&D SESAR JU: Michael Standar Complementary measures Professor Alfredo Roma 27

Nominations (2) Members of the Working Groups Each members of the ERSG are invited to nominate experts to at least one WG. The coordinates of the nominated experts should be sent at before 18 28

Use of the Roadmap The Roadmap is first of all the monitoring tool of the ERSG It should also be used as a mean to communicate to All stakeholders The wider audience 29