PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Advertisements

– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Saturday 14:10 Cryogenics back [26 hours 40 minutes] Pre-cycle 15:30 Beam 2 in  Interlock on TCLIB.6R2.B1. Alessandro Masi found a broken sensor, it would.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Friday 15th June 01:11 Injection.
Wednesday 21 March 2012.
Monday fill with 1092 bunches (6 h stable beams)
Saturday 30th June - Sunday: Rocky !
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Thursday morning – optics correction
Monday – recovery from MKI flashover
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 13 G. Arduini, B. Holzer
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Saturday 2/4/ :00-09:00 Problems with SPS:
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Sunday morning Recovering from 400 kV disturbance.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Wednesday 10/5 Cryo recovery until 18:30
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Summary week 18 Intensity ramp up & production
Saturday 3rd November - morning
Saturday Nov Stop proton operation. Switch back to ions
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 10th December - morning
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday morning / afternoon
Saturday Luminosity production 1380 bunches
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Presentation transcript:

Thursday 3.5.2012

Thursday Morning and Afternoon 06:00 Beam dumped – RQX.L8 (triplet) tripped. Lost cryo. Access: QPS reset on RQX.L8 SPS WIC (Warm Magnet Interlock Controller) crate exchange in TI2 Added attenuator on one interlock BPM IP6 MPE piquet RF check: The phasing of all 8 cavities B1 has been re-checked (series of checks following the loose connector 380 MHz cable problem). As expected all phases correct within 0.5 degree, no access needed. 12:21 cryo recovered 14:30 beam back: measurement for IP6 interlock BPMs and re-calibration of the interlock thresholds till ~18:00 BLM card exchanged (2 false dumps) 20’ LINAC problems during filling

Summary of Interlock BPM checks (Eva, Jan & Rhodri) BPMSA.B4R6.B2: found to be too sensitive last night. Seeing 2 bunches with just one pilot circulating, probably re-triggering on a cable reflection. 6dB attenuation added to this BPM only during this morning's intervention. This seems to have solved the problem. Interlock BPM calibration: After calibration and re-calculation of interlock thresholds the Interlock BPM positions verified for all excursions, both beams with single nominal bunch (+pilot) circulating. Excellent correlation between set threshold and dump trigger found, with less than 200um difference in all cases. After this check the BPMs were calibrated for 50ns beam and the new threshold values generated and set in the front-end. This is not done systematically after each calibration, but only done on a reboot of the crate or if the threshold values are changed (for machine protection reasons). Interlock BPMs - A : very similar centered values to single nominal Interlock BPMs - B : more differences - up to 0.6mm on one channel

Thursday Evening - 852 bunches 20:33 – 3:44 Fill 2587 stable beams 1.3 – 1.4 E11 / bunch (12 b trains with higher intensities Losses during squeeze up to 37%, during collision BP up to 50% Lumi: ~3E33 cm-2s-1 Integrated lumi 53/55 pb-1 Atlas/CMS

Friday morning 3:44 Cryo operator received an alarm: cryo compressor lost, sector 81 will go down in a few minutes. Dumped with OP switch and sent the whole sector to standby, and then off, as soon as possible - should make the restart easier. RQX.R8 and L1 tripped while going off. Reset the faults. 4:17 ‘cryo safe’ lost Latest estimate: conditions foreseen to be back around 14:00. Access for cryo, experiments, etc.

Plan Fill with low intensity to do the loss map B1V at collision, high gain orbit feedback in squeeze, and dump with FMCM check RD34 IP7 (set to OFF). Next physics fill with 1380 bunches