Flood Mapping Workshop

Slides:



Advertisements
Similar presentations
FIAR International Insurance- Reinsurance Forum 2013 Nat Cat mitigation programs in Bulgaria Roumen Galabinov.
Advertisements

PHYSICALLY BASED MODELING OF EXTREME FLOOD GENERATION AND ASSESSMENT OF FLOOD RISK L. S. Kuchment, A. N. Gelfan and V. N. Demidov Water Problems Institute.
3 rd IMPACT WORKSHOP Brembo-Adda test case Fabrizio Savi, University of Rome “La Sapienza”
RS/GIS TECHNIQUES FOR RESCUE/RELIEF. Rapid analysis of information coming from the impact areas Quick field validations based on satellite imagery and.
Importance of Land use management on the Flood Management in the Chi River Basin, Thailand Kittiwet Kuntiyawichai Bart Schultz Stefan Uhlenbrook F.X. Suryadi.
4 th International Symposium on Flood Defence Generation of Severe Flood Scenarios by Stochastic Rainfall in Combination with a Rainfall Runoff Model U.
Konkuk University Climate Research Institute Typhoon Damage Impact Assessment Of Young-dong Region, Korea Park, Chang yong, Graduate Student, Department.
Information Management and Analytical Center of Committee of Emergency Situations and Civil Defense Tentative forecast for spring flooding and mudflow.
Prof. Dr. Robert Jüpner 4th ISFD, Toronto 2008 The new European Flood Management Directive and the municipal flood management system as one realization.
URBAN FLOODS IN GREECE Current situation and major research and development needs in Urban Flood Management Cost meeting, Warsaw, 29-31/5/2008 Vassilopoulos.
Introduction to the ADAPT project - context Context and new elements General overview of the methodology Work plan and timing.
Preliminary Flood Risk Assessment in Relation to The Project of Flood Directive Marcin Jacewicz Regional Board for Water Management in Gdańsk.
Kansas City Industrial Council Hydrology and Hydraulics
Water management and Flood risk assessment in Bulgaria Petya Balieva – junior expert - Water use department, Water management directorate Seminar: “Interagency.
Institute for Environmental Studies Flood Maps in Europe a comparative evaluation of methods, availability and application Hans de Moel and Jeroen Aerts.
Flood Risk Review Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Hazard Assessment in Upstream Region of Chao Phraya River CHAM TAU CHIA Doctoral Student Graduate School of Engineering, Kyushu University Civil.
Expected Change of the Key Agrometeorological Parameters in Central Europe by 2050 Trnka M. 1,3, Štěpánek P. 2, Dubrovský M. 3, Semerádová D. 1,3, Eitzinger.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
DRR workshop WMO Commission for Hydrology Geneva June 2013 Ann Calver 1.
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT TITLE : Report of Rapporteur on Extreme Potential Floods AUTHOR:
Application of the CUAHSI Hydrologic Information System in the Czech Republic Jiří Kadlec, Daniel P. Ames, Michal Jeníček Department of Physical Geography,
James River in Richmond, Virginia looking upriver from the Robert E. Lee bridge. Belle Isle is on the right, November What is happening in this.
Evaluation of climate change impact on soil and snow processes in small watersheds of European part of Russia using various scenarios of climate Lebedeva.
The hydrological cycle of the western United States is expected to be significantly affected by climate change (IPCC-AR4 report). Rising temperature and.
Flood risk, flood prevention and flood insurance in The Netherlands
Flash Floods in a changing context: Importance of the impacts induced by a changing environment.
ADB TA 7599-TAJ Climate Resiliency for Natural Resources Investments Climate Risk Management in River Basins River basin approach to climate resiliency.
1 HORA - The basis of insurability of natural risks in Austria Dr. Anita SCHÖNEGGER Manager Property Austrian Insurance Association.
Page 1 Advanced Hydrologic Prediction Services NWS Inundation Mapping Eastern Region Flash Flood Workshop June 4, 2010 Presentation by Laurie Hogan NOAA/NWS.
California Project Seismicity in the oil and gas fields Tayeb A. Tafti University of Southern California July 2, 2013.
1 Integrating Water Resources Engineering and Geographic Information Systems (GIS) National Weather Service NWSRFS International Workshop October 21-23,
FLOOD MAPPING Menaxhimi i rezikut te permbytjeve Objektivat Gjenerale.
Logistical Verification Forecast Services in IHFS Mary Mullusky RFC Verification Workshop, August
Pan-European assessment of weather driven natural risks Carlo Lavalle, José I. Barredo, Ad De Roo, Luc Feyen, Stefan Niemeyer, Andrea Camia, Roland Hiederer,
Research & Systematic Observations (IX) Vulnerability Assessment, Impacts and Adaptation Measures (VII) Research & Systematic Observations (IX) Vulnerability.
Assessment of Vulnerability on the Aral See Basin NATALYA AGALTSEVA Research Hydrometeorological institute (NIGMI) Uzhydromet Uzbekistan.
Modelling of the 2005 flood event in Carlisle and probabilistic flood risk estimation at confluences Jeff Neal 1, Paul Bates 1, Caroline Keef 2, Keith.
Water.europa.eu Floods Reporting Drafting Group Progress report WG D Maria Brättemark WFD Team, DG ENV.D.1, European Commission.
Risk Frontiers Flood Hazard Data Flood Hazard Data Flood Forum Victoria Nov 2014.
The EU Floods directive -Implementation in Sweden.
Flood damage models – Scope and limitations
1. Presentation Plan 1) Statement of problem (Background). 2) Study objective. 3) Study area. 4) Methodology. 5) Results. 6) Conclusion and Recommendation.
Logan River Floodplain Mapping Kedric Curtis, Josh Hogge, Jordan Jarrett, Jared Justensen 4/25/2015 CEE 6190 Photo credit:
EMMA - Hydrology EUMETNET representatives visit, 21 st – 22 nd October 2013, CHMI, Praha Tomáš Vlasák.
The Flood Directive 2007/60/EC (and its coordination with WFD) The European Union Twinning Project for Turkey “Capacity building to implement the Flood.
Flood in Austin - Economic losses assesment
SPATIAL AND TEMPORAL ANALYSIS OF THE DEGRADATION OF NATURAL RESOURCES
Parvathy Sankara Raman
North Carolina Lumber River Basin Plan
Katrien Debeuckelaere Legal Advisor, Land Use Planning, Flemish Region
5th Follow up Committee Meeting HIVA-KUL, 6th October 2009
Prof. Dr. Amin Ismayilov¹ & Amil Aghayev²
Flood Monitoring Tools 2011 OFMA Annual Conference
Hydrology.
GIS In Water Resources C E 394K Impact of Floods to the Bridge Deterioration Process – The case of Onion Creek Oscar Galvis Nov 22th 2016.
What forecast users might expect: an issue of forecast performance
Gender mainstreaming in environmental
River Kokemäenjoki – Flood risk management & WFD
River Kokemäenjoki – Flood risk management & WFD
Flood hazard maps and Flood risk maps (Guidance and Schema)
Hydrotechnical Design Guidelines for Stream Crossings
Assessment of damage due to Hurricane Florence in Wilmington, NC
Garrett Kilroy EPA Research Fellow Shannon PRB
Preliminary Flood Risk Assessment
Directive on the assessment and management of flood risks - towards implementation SCG, By Maria Brättemark, European Commission, DG Environment,
Progress report WG F Maria Brättemark, WFD Team, DG ENV.D.1, European Commission.
Workshop WFD and Hydromorphology Brussels, June 2012
Altai flood’s 2014 and model precipitationg forecasts
Presentation transcript:

Flood Mapping Workshop Dublin, 17th to 19th September 2008 Where and how to do Preliminary flood risk assessment? Flood mapping must help to answer: the Czech Republic situation. Jan Daňhelka Czech Hydrometeorological Institute Na Sabatce 17, 143 06 Praha-Komorany, CZ e-mail: danhelka@chmi.cz Michaela Brejchova, Karel Drbal, Josef Reidinger

What has been done already in the CZ Historical floods OUTLINE What has been done already in the CZ Historical floods What is a significant risk? What is extreme flood? Some other issues of risk evaluation Reporting

Introduction Floods - the most important natural risk in the CZ heavy precipitation snow melting flash floods CZ area of 78 864 km2 76 000 km of streams 9 252 km of remarkable streams Water Act of the Czech Republic 254/2001Sb

Introduction FRD demands? PFRA outputs = maps and other information

Existing data and information Inundation areas Q5 Q20 Q100 active inundation River basin management plan of the Czech Republic (May 2007) preventive measures to reduce damage by flooding Chapter D of River Basin District Plans

Existing data and information Flood hazard and flood risk assessment methodology (Drbal et al., 2005) Project on further improvement of methods of flood risk and flood damages estimation including implementation of FRD. Information System Flood Resident (ISFR) number of residents aggrieved by Q100, Q20 PFRA - flood with high probability = Q20 - flood with medium probability = Q100 - flood with low probability = ?

Historical Floods Pre-instrumental period (before 1800) chronicles dates (August 1118, June 1432 etc.) magnitude? (since the time of Noah) inundation? (churches and streets that were flooded) flood marks (very few)

Historical Floods Instrumental period (1800 – 1980) historical measurements pictures, photographs flood marks reports

Historical Floods

Historical Floods Is inundation the same? - Mapping of flood protection and terrain changes.

What is a significant risk? No pan European criteria How to set some threshold? Potential damage (direct) Affected residents – first approximation other types of risks

What is a significant risk? Czech Republic Q100 90 381 buildings (88 000 used for living) 157 000 households 368 000 people (3,5 %) 1 499 municipalities 50 municipalities > 1 000 inhabitants 395 municipalities > 100 inhabitants. Olomouc - 35 624 Brno - 17 199 Prague - 14 935 Uherske Hradiste - 14 578

What is a significant risk?

What is a significant risk?

What is a significant risk?

What is a significant risk?

What is an extreme flood? FRD 2nd phase Q500 ? Probable maximum flood ? Historical flood extent ? Flood plain delimitation based on terrain or soil mapping ? Hydraulic modeling steady x unsteady flow design hydrograph confluences Verification over historical floods…

Other applications based on flood risk? Reinsurance brokers Flood damage models Flood extent flood depth in selected profiles (above the bankfull) interpolation along the stream precision? - important are large cities (damages) only! Intersect with insurance portfolio Apply damage functions (curves) Base for decision of billions of Euro business!

Reporting PFRA outputs Make available to GP Make available to the Commission CZ view Use existing databases and information systems in the CZ Reporting the work, not the full outputs

Common water management information portal Reporting Common water management information portal http://www.voda.gov.cz

Flood information system POVIS Reporting Flood information system POVIS http://www.povis.cz

Conclusion So, how flood mapping should support PFRA? use existing maps (Q100, Q20) help to define „significant risk“ threshold mapping (localization) of flood protection measures GIS procedures of flood plain delimitation? verification of historical flood inundation data Preparing the outputs of PFRA which in a fact are flood maps

THANK YOU FOR YOUR ATTENTION Flood Mapping Workshop Dublin, 17th to 19th September 2008 THANK YOU FOR YOUR ATTENTION Jan Daňhelka Research activities of CHMI in the field of CC impact on hydrology Czech Hydrometeorological Institute Na Šabatce 17, 143 06 Praha-Komořany, CZ e-mail: danhelka@chmi.cz