WG A Ecological Status Progress report April-October 2010

Slides:



Advertisements
Similar presentations
Intercalibration Guidance: update Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
Advertisements

WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
Framework for the intercalibration process  Must be simple  Aiming to identify and resolve big inconsistencies with the normative definitions and big.
River Intercalibration Phase 2: Milestone 4 reports Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
River Intercalibration Phase 2: Milestone 3 reports Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Updating the intercalibration process guidance Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
NE ATLANTIC GEOGRAPHICAL INTERCALIBRATION GROUP (NEA GIG)
Task on Harmonisation of Freshwater Biological Methods
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
IC network selection process
Results of the metadata analysis Meeting of the Working Group 2A on Ecological Status (ECOSTAT) March 4-5 , 2004, Ispra, Italy Peeter Nõges Anna-Stiina.
Working Group A ECOSTAT October 2006 Summary/Conclusions
Synthesis of the intercalibration process Working group 2.5.
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Draft Commission Decision on Intercalibration
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Working Group 2A ECOSTAT Intercalibration process - state of play Wouter van de Bund & Anna-Stiina Heiskanen Joint Research Centre Institute for Environment.
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, October 2005 Progress in the intercalibration exercise.
Task on harmonization WFD Annex V 1.3.6
Water Directors’ Meeting Common Implementation Strategy
Harmonisation Activity Progress report
WG 2.5 Intercalibration.
Intercalibration Timetable
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Common Implementation Strategy for the
Activity on environmental objectives and exemptions
Update on progress since last WG meeting (13-14 June 2002)
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Working Group A Ecological Status - ECOSTAT State of play in the intercalibration exercise Water Directors Meeting, November 2005.
on a protocol for Intercalibration of Surface Water
New mandates for Working Groups A, C and D including GIS
Project 2.7 Guidance on Monitoring
Progress Report Working Group A Ecological Status Intercalibration (1) & Harmonisation (3) Activities Presented by Anna-Stiina Heiskanen EC Joint Research.
WFD – CIS Working group A ECOSTAT
Activities of WG A Ecological Status
Main blocks of discussion
WG A Ecological Status Progress report April-October 2009
Water Directors meeting Mondorf-les-bains, June 2005
EU Water Framework Directive
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT 2013 – 2015 Tasks and Deliverables
Water Directors meeting Warsaw, 8-9 December 2011
Water Directors meeting Spa, 2-3 December 2010
Working Group 2A ECOSTAT Guidance for the intercalibration process Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
River groups with extension
WG A ECOSTAT Intercalibration guidance : Annexes III, V, VI
WFD CIS 4th Intercalibration Workshop
Lake Intercalibration – IC Decision Annexes + what to do in future
Standardisation/Harmonisation
Activity on Eutrophication
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
Common Implementation Strategy for the
Reporting template for milestone reports
Common Implementation Strategy for the
Planning to develop the CIS Work Programme
EU Water Framework Directive
WFD CIS WG ECOSTAT meeting on 8-9 October 2007 Objectives What do we need to achieve during this meeting?
WG A ECOSTAT Draft Mandate
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Intercalibration round 2: finalisation and open technical issues – RIVERS ECOSTAT October 2012.
EU Water Framework Directive
WG A Ecological Status Progress report October 2010 – May 2011
Environmental Objectives and Exemptions State of Play
Why are we reviewing reference conditions in intercalibration?
Presentation transcript:

WG A Ecological Status Progress report April-October 2010

Issues ECOSTAT meeting 6-7 October, Ispra: focus on intercalibration Guidance on comparability criteria (IC process guidance Annex V) Progress of ongoing intercalibration work Problems with deadlines - requests for extension

Guidance on the IC process 2008-2011 Guidance endorsed by Water Directors in Malmö, December 2009 (except Annexes III, V, VI) Annex III (Reference conditions/Benchmarking) and VI (Reporting) endorsed by WD spring 2010 Remaining open issue: Annex V - comparability criteria ECOSTAT was requested to complete this Annex autumn 2010 for WD endorsement in Spa

Intercalibration Guidance Annex V common procedure to compare and harmonize the national class boundaries of good ecological status for the second phase of intercalibration First proposal was discussed at the WGA ECOSTAT meeting of 8-9 April 2010 No agreement was reached on this version due to its complexity and need for testing on several existing situation Testing took place spring/summer 2010 by several IC groups Improved version discussed and agreed at WGA ECOSTAT meeting of 5-6 October 2010

ANNEX V - General principles Comparability is always checked with analysis of 2 components: boundary bias and class agreement, using EQRs Boundary harmonization = upper boundaries do not differ more than 0.5 class between MSs (= the maximum boundary deviation above or below each national boundary is a quarter of a class). Class agreement is calculated after boundary harmonization to show the performance of the methods after required adjustments are made to the boundaries

Boundary bias Class agreement Class agreement over all MSs Boundary bias _ compare each MS boundary with common view Class agreement over all MSs Mean average absolute class difference All options ≤ 0.25 classes < 1.0 > 0.25 classes ≥ 1.0

ANNEX V - Application Annex V procedure assumes that the requirements specified in the IC guidance are met WFD compliant assessment methods Feasibility checks (typology, assessment concept, etc) IC guidance gives IC groups that do not meet those criteria the flexibility to apply alternative approaches (e.g. expert judgment based)  key principle 9 Not possible to give general guidance for this

ANNEX V - Application JRC / IC steering group has developed Excel templates to carry out the calculations Training workshops have been organised to ensure harmonised application Lakes: 4 November Coastal/Transitional: 10-11 November Rivers: early 2011 if needed Results will be checked and validated centrally (early 2011) Calculation templates will allow concistent application of the procedures in the future, if needed

Request to Strategic Coordination Group: Version 5.1 of the IC Guidance Annex V is agreed by WGA ECOSTAT on 5 October 2010. The SCG is invited to: send any remaining comments in writing to the 3 contacts mentioned below, by 05.11.2010 (none received) discuss any outstanding issues agree to forward the final draft to the Water Directors for their endorsement during their meeting in Belgium on 2-3 December 2010.

Intercalibration: Progress of ongoing work General timetable 2008-2012

Intercalibration: Progress of ongoing work “Milestone 3” reports delivered by the intercalibration groups and discussed at the October EOSTAT meeting In total there are 68 BQE/GIG combinations 43% of the groups is on track 37% of the groups have problems/delays 20% of the groups will not finish

Extra efforts needed 37% ‘yellow’ – still possible to complete! Extra effort is needed and expected – it is still possible to complete these BQEs! Especially for Coastal/Transitional – WITHOUT EXTRA EFFORT 2/3 OF THE BQEs WILL FAIL! Some GIGs need more time 

Requests for extension ECOSTAT discussed the possibilities/benefits of a (limited) extension of the deadlines DGENV emphasized that wherever possible the agreed deadlines (draft results in April 2011, final results in June 2011) should be met Only in exceptional circumstances, and with sufficient justification, will a maximum 6 month extension (to the end of 2011) be considered (i.e. not automatically granted).  IC steering group has contacted group leads and prepared an overview of the requests

Rivers green – on track; orange – problems; red – will no finish X – 6-month extension requested

Lakes green – on track; orange – problems; red – will no finish X – 6-month extension requested

Coastal green – on track; orange – problems; red – will no finish X – 6-month extension requested

Transitional green – on track; orange – problems; red – will no finish X – 6-month extension requested

Requests for extension - summary