Mississippi River Bridge Report of the Expert Panel Key Observations, Findings & Options January 31, 2007 Aldaron, Inc.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

Metrolinx is an agency of the Government of Ontario Planning, Design and Engineering (PDE) Workplan February 20, 2009.
April 2, $1 Billion - $1.2 Billion The Pawlenty-Molnau Transportation Financing Package will improve Minnesotas transportation system by greatly.
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
I-4 Ultimate with Lanes Project Central Florida 1 May 21, 2013.
I-66 Corridor Improvements Outside the Beltway CTB Briefing
Overview and Principles for Implementing State PPP (P3) Legislation Presented at the NCPPP P3 Connect Denver, Colorado Conference By Jim Reed, Group Director.
Legislative Committee on Education Capital Funding Needs July 15, 2014.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
THE PRACTICE OF TOLLING Theory in Motion May 7, 2013 Michael Copeland Yagnesh Jarmarwala Justin Winn.
Northwest Rail Update Nadine Lee, Northwest Rail Project Manager Regional Transportation District March 21, 2012.
American Trucking Associations National Association of Steel Pipe Distributors March 2007 Ray Kuntz Chairman and Chief Executive Officer of Watkins and.
1 GOODS MOVEMENT IN CALIFORNIA. 2 California is facing a significant transportation infrastructure shortfall. California is using innovative approaches.
Gilbert Road Light Rail Extension Transportation Project Advancement Agreement City Council Study Session December 4, 2014.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
I-95 Corridor Coalition December 14, 2001 I-95 Corridor Coalition Mid-Atlantic Rail Operations Study — An Integrated Strategy to Eliminate Choke Points.
Longmeadow Parkway Fox River Bridge Corridor
Considering Tax-Supported Debt May 10, 2004 Presentation to City Council Roger Rosychuk Corporate Services Department.
Federal Transit Administration New Starts Project Development Process
Public-Private Partnerships: State of Practice and Research Needs The 14 th Annual Public Private Partnership Conference World Bank, Washington, DC September.
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Greg Cenac Steve Haik Ross ChapmanRonnie Harris Perry DufreneMarc Mergen Ivan EchegarruaKen Robinson Mike GrayDan Sleker Harold Yeldell TRANSPORT NETWORKS.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
FY 2012 President’s Budget Released February 14, 2011.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Mississippi River Bridge An Analysis of Alternatives DRAFT Final Report Presentation January 31, 2007.
Freight Issues in the Report of the National Surface Transportation Policy and Revenue Study Commission Transportation for Tomorrow.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Privatizing for the Public Good “Role of Professional Advisors to State DOTs” April 27, 2007 Thomas W. Bradshaw, Jr. Managing Director Co-Head of Transportation.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Finance: The Critical Link The Transportation – Land Use – Environment Connection Brian D. Taylor October 2003 Institute of Transportation Studies.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
1 Transportation Infrastructure Programs Past, Present & Future Transportation Association of Canada Fall Conference September 2011 Edmonton, Alberta.
1 Mississippi River Bridge An Analysis of Alternatives Expert Panel Review Sharon Greene & Associates.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
Debt Strategy Presentation to City Council May 10, 2004 Click to edit Master title style.
Module Funding Sources, Requirements, and Opportunities Identify, access, and share funding to support road safety initiatives.
Southern Bridge Project Brown County Executive
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Public-Private Education Facilities and Infrastructure Act.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
Projects of National and Regional Significance Program.
Freight Project Financing Challenges, Questions and Options presented by Michael P. Huerta Cambridge Systematics, Inc. April 30, 2001.
SESSION 5: TRANSPORTATION ISSUES Rob Henken President, Public Policy Forum August 5, 2014.
1 Voluntary and Community Sector Review Voluntary & Community Sector Review Grants Strategy Working Party Participative Session 28 September 2006 Appendix.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
The Truth About the Costs of ITS: Implications for Improving Planning and Operations in Traffic Management U.S. Department of Transportation Local Funding.
Office of Major Project Development (OMPD) Overview November 2015.
KING COUNTY BRIDGES AND ROADS TASK FORCE Roads Services Division Financial Review September 16, 2015.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
House Transportation Policy and Finance April 13, 2016 Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer.
FY 2016 Budget Workshop June 11, 2015 Brian Maxwell, City Manager Dan Buckley, Deputy City Manager Mike Loftin, Finance Director 1.
Presentation to the Joint Committee On Transportation Oversight 1 Jack Basso Chief Operating Officer and Business Development Director American Association.
Counties Transit Improvement Board: Program of Projects & Transit Investment Framework Workshop 3 Board Workshop October 16, 2013.
Rebuilding Rhode Island’s Aging Bridges with Truck Tolling
Finding the Revenue Stream to Make P3s Work
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
Regional Roads Committee
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Indigenous and Northern Affairs Canada Leveraging Infrastructure Funds
Draft Transportation Element September 6, 2017
The Air Traffic Organization: Building Today to Ensure Our Future
Southern Bridge Project Brown County Executive
MODULE 11: Creating a TSMO Program Plan
Chicago to Council Bluffs-Omaha
Presentation transcript:

Mississippi River Bridge Report of the Expert Panel Key Observations, Findings & Options January 31, 2007 Aldaron, Inc.

Presentation Outline Meet the Expert Panel Introductory Thoughts Report of the Panel - Panels mission and scope. - Background observations. - Key findings. - Options for moving forward.

Meet the Expert Panel

Composition of the Panel 10 nationally recognized experts. Diversity of expertise and experience: Transportation funding & finance, with emphasis on innovative finance (e.g. tolls) and public-private partnerships. Transportation planning & traffic engineering. Transportation policy, resource allocation & institutional strategy.

Meet the Expert Panel Cynthia J. Burbank [Reporter] 35 years with USDOT (FHWA since 1991). Recently retired from the position of Associate Administrator for Planning, Environment, and Realty for the Federal Highway Administration. At USDOT, received over 20 awards, including the SES Meritorious Executive Award (twice), the DOT Silver Medal (twice), and the Eisenhower Medal.

Meet the Expert Panel John Barna Executive Director, California Transportation Commission (CTC). Responsible for programming all State and Federal transportation funds in California. Approximately $2.5 - $3.0 billion annually. Oversees recently approved $19.9 billion transportation bond program. Former Deputy Secretary, California Business, Transportation & Housing Agency

Meet the Expert Panel Karen Hedlund Partner, Nossaman, Guthner, Knox & Elliott Specializes in the structuring of public-private partnerships and the creative financing of infrastructure projects. Over 30 years of experience advising state and local governments, financial institutions and private investors in the development of highways and toll roads, transit systems, airports, etc. Nationally-recognized for role in the development of federal and state legislation related to procurements and financing of public-private partnerships.

Meet the Expert Panel Dr. Ronald F. Kirby Director of Transportation Planning for the National Capital Region Transportation Planning Board (TPB). Over 30 years experience in transportation and related fields. Responsible for: Long-range planning for highway and public transportation systems in the Washington, D.C. metropolitan region. Assessment of the air quality implications of transportation plans and programs.

Meet the Expert Panel Wally Kreutzen Currently CEO of the Orange County Great Park Conservancy, charged with turning the former El Toro Marine Corps Air Station into one of Americas largest metropolitan parks. Formerly, served as CEO for the Transportation Corridor Agencies charged with building new urban toll roads in Orange County. Was responsible for all planning, construction, financing, and operations associated with three toll roads, now used by 290,000 drivers daily. The finance plan resulted in the issuance of over $2.7 billion in toll revenue bonds.

Meet the Expert Panel Steve Lockwood Principal Consultant with the firm PB Consult. Over 30 years experience in the transportation field. Internationally recognized expert on transport policy, finance and institutions, with extensive experience in policy and program development and technical applications. Formerly, Associate Administrator for Policy, FHWA.

Meet the Expert Panel David B. Miller President of Metro Transportation Group, Inc. Specializes in traffic engineering, transportation planning and signal system design. Over 36 years experience in traffic engineering and transportation planning. Has directed and managed over 2000 traffic impact studies for commercial, office, industrial, residential and recreational facilities throughout the U.S. and overseas.

Meet the Expert Panel Charles J. Nemmers, P.E. Since 1999, Director of the Transportation Infrastructure Center at the University of Missouri- Columbia. Moved to the University following a 32-year career with the Federal Highway Administration. At FHWA he served as Division Administrator in the states of Delaware, Georgia and New Jersey. In 1993 was named Director, FHWA Office of Engineering R&D.

Meet the Expert Panel Linda Wheeler Currently a transportation consultant, providing analysis of transportation issues, particularly funding. Retired from the Illinois Department of Transportation in 2003 after a 28 year career at the agency. Since 1991, responsible for IDOT's capital planning and programming, including five-year and annual capital programs for highways, transit, air and rail. Prior to 1991, held a variety of IDOT positions, including heading the Congressional affairs bureau and the public transit division.

Introductory Thoughts

Time is the enemy: Without a decision to move forward, the probability of success diminishes and will at some juncture pass the point of no return. Project costs escalate over time, making the funding challenge ever and ever greater. The large and highly visible Federal earmarks for the project are at risk the longer the region waits and as the atmosphere in Congress evolves.

Introductory Thoughts The perfect should not drive out the good: The best project in the world that is not financially feasible equates to no project at all. The goal should be to find the affordable option that goes the furthest in resolving congestion and safety challenges in the corridor.

Introductory Thoughts There is no simple or right answer: Different interests have expressed strong preferences for different project options and different funding plans. There is no option that will satisfy everyone.

Report of the Expert Panel

The Panels Mission & Scope Consider the status of the project and provide advice on financing and design issues.

Background Observations

Bridges across the Mississippi River near downtown St. Louis are a significant and persistent traffic bottleneck and safety problem. More river crossing capacity is critical when there is disruption for construction or traffic incidents.

Background Observations [contd.] This is a challenge of national and regional significance. Four Interstate highways converge in St. Louis. National security and other interests are threatened by the lack of redundancy.

Key Findings

Key Finding #1 The Martin Luther King (MLK) Bridge Coupler proposal appears to have merit. Less costly yet yields significant congestion relief and safety benefits. May meet river crossing needs, especially if connections to the Poplar Street Bridge are optimized. There are complications: Costs and benefits need refinement. A new EIS is required (more time, more money). A smaller but non-zero funding gap remains.

Key Finding #2 The panel is highly skeptical about the viability of the toll bridge option as a strategy to close the project funding gap. Tolls are a useful strategy to pay for very large projects, but….in this case the panel is very skeptical: -Multiple adjacent free bridge options. -Diversion to free bridges would limit revenue of a toll bridge, and undermine congestion relief on the Poplar Street Bridge. -Socioeconomic conditions are not favorable. -No comparable situations where a new toll bridge is being developed in close proximity of multiple parallel free bridges. -Current level of congestion (and expected future traffic growth) in St. Louis is not severe enough. Tolls cannot be completely ruled out, but approximately 2 years would be needed to develop and evaluate, with no guarantee of success. It would be unwise to Aput all eggs in the tolling i.e., to spend 2 years pursuing this option while ignoring other, more viable, possibilities.

Key Finding #3 There are congestion and safety problems because of geometric deficiencies on the ramps to and from the Poplar Street Bridge and the connections of major routes to other bridges. Optimizing existing facilities should be a top priority, and should not be forgotten in the quest for a new bridge. I-44/55 ramps on the Poplar Street Bridge. Access to Eads Bridge. I-64/55/70 tri-level interchange.

Key Finding #4 Committed revenue sources are not yet adequate to finance a new bridge and related improvements, although the funding gap varies considerably among the options. Other revenue sources that could be considered: -Bridge naming rights; -A benefit-based contribution from the regional business community; and, -A regional transportation tax. While the panel is skeptical that a new bridge could be financed on tolls alone, tolls might yield meaningful revenues. Tolling of multiple bridges would be most productive, but would likely encounter strong public opposition in the near term.

Key Finding #5 Time is the enemy. Moving forward with either a new toll bridge or the MLK Coupler option will require at least two more years C even using accelerated methods. -For the MLK Coupler, an EIS will take a least two years. -For a toll bridge options, a number of steps would be required: Commissioning refined traffic forecasting; Achieving agreement among Illinois, Missouri, and the East-West Gateway Council (EWGC) on tolling parameters and common data sets; Developing concession documents, including final technical requirements and long-term operation and maintenance standards; Issuing a Request for Proposals to potential concessionaires; Retaining independent professional legal and financial advisors to the states on contract terms and concessionaire proposals; and, Careful negotiations with interested concessionaires (if any). -Improvements to the approaches to Poplar Street Bridge and other connecting roads in Illinois might be done faster.

Key Finding #6 Numbers do matter: all parties need to agree upon common data and assumptions, and to be clearer about the scope of the related improvements. IDOT, MoDOTand EWGC should agree on traffic volumes and trends, reasonable growth forecasts, common analysis years, and comparable toll diversion rates. There needs to be consistency and clarity in the definition of the project, making it easier to compare project alternatives.

Key Finding #7 The bridges work as a system Solving the financial problem must also solve the transportation problem: Considering the bridges as a system is essential to evaluating tolling options, as well as other revenue enhancing options. Beyond the analytical need, there is also a need to manage the bridges as a system of crossings.

Options for Moving Forward

Option #1: Dual-Track Pursue a phased, dual track, Arisk approach. Simultaneously, Missouri and Illinois could refine and advance the analysis for both the toll bridge and MLK Coupler, to the point of a decision in about 2 years. Advantage: if the toll option proves infeasible, there would not be a loss of two (or more) years in schedule and cost escalation, since the Coupler project would have completed its environmental process. Disadvantage: the two analyses would be expensive, with the investment grade toll studies alone costing an additional $500K or more and the EIS likely to cost several million dollars. The tolling analysis should consider a significant discount for local commuters. This addresses equity concerns, although it could significantly reduce the potential revenues from a toll bridge.

Option #2: Focus on the MLK Coupler Given the risks and limitations of the toll bridge option, the region could concentrate efforts on completing an EIS for the MLK Coupler and identifying additional revenues needed to build it. Advantages: Funding gap is small, relieves Poplar Street Bridge as much as a toll bridge. Disadvantage: Feasibility is not fully known, cost estimates are preliminary.

Option #3: Adopt a phased approach This option would initially focus on moving forward with the improvements to the existing facilities while undertaking a longer- term effort to develop a wider array of bridge financing resources. Phase 1: Improvements to existing facilities: Tri-level interchange, IL-3 relocation, fixing Poplar Bridge ramps on the Missouri side, etc. The region could seek legislative authority to use the $239 in Federal earmarks for these improvements while the region takes the time needed to decide on a new bridge. Phase 2: Seek consensus on bridge and funding for it. Would entail a longer-term effort to develop a wider array of bridge financing resources --- beyond existing state resources and toll revenues. These resources might include additional Federal aid as well as a broader array of state and local revenue sources such as those discussed above.

Conclusion Under Federal law, both EWGC and the states have authority and responsibility for resolving this issue. While the challenges are significant, the panel believes there are viable alternatives to address the related local, regional, and national issues. There is sufficient information available for the region=s decision- makers to come to closure relatively quickly on a plan of action.