Electric Power Generation OVERVIEW EE 4501 Electric Power Generation OVERVIEW
BOSWELL ENERGY CTR Minnesota Power’s Primay Generation Ceneter (an Allete Company!) Unit 1, 70 megawatts, operational in 1958. Unit 2, 70 megawatts, operational in 1960. Unit 3, 350 megawatts, operational in 1973. Unit 4, 535 megawatts, operational in 1980.
Boswell from the Air
Power Station
Boiler www.babcock.com
Steam Turbine/Generator
High Voltage Transmission preservationnation.org
Turbine
Synchronous Generator Howstuffworks.com
Stator – Liquid Cooled Windings
Step-Up Transformer ABBpowerservices.com
Transmission Lines www.brics-info.org
Substation www.osha.gov
Distribution Lines www.dom.com