Undulators Subgroup Summary April FAC Review K. Robinson, J

Slides:



Advertisements
Similar presentations
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Advertisements

Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Undulator System Review Closeout Erik Johnson, Kem Robinson, Dieter Walz 4 March 2004.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
Cost Estimate Marion White (Argonne) SCU 3-Lab Review Meeting December 16, 2014.
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
ELENA installation progress F. Butin / ELENA collaboration.
News and Introduction from CERN June 15th, 2005
Updated with comments 22 may 2017 Updated again 29 June 2017
Francois and Lau EATM 17 July 2012
LIU Wire Scanner Milestones June 2017
Communication and Documentation Needs exemplified on WP 71
LCLS Linac Technical Design Review Charge
SCU Next Phase Meeting July 8, 2014.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LTU/Undulator Installation Status
LCLS Undulator System Detailed Report
Undulator Scope, Management, and Organization
e-Beams Systems Update
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
LCLS Undulator System Status and Schedule
Endstation Systems, Installation Costs and Schedule J. Hastings
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
Undulator Cavity BPM System Status
Charge for the LCLS Undulator Magnet Review Committee: Nov. 14th, 2003
LCLS Undulator System Production Management
Undulator Tuning Status
Conventional Facilities Status
Undulator Scope, Management, Organization
E-Beams Systems Manager
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
Undulator Long-Lead Procurement Preparation
Undulator System Overview
Undulator Integration Test Status
X-Ray Endstation Design & Management/Commissioning
Electron Beam Systems ETC and Methodology
LCLS Undulator System Detailed Report
Undulator Assembly and Installation Planning
LCLS e- Beams System Overview
Physics Requirements for Conventional Facilities
Undulator Alignment Plan
CF Scope, Management & Organization
e-Beams Systems Update
LCLS Control System Personnel Linac & BC2 Controls progress
DOE Status Meeting of the LCLS Project
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Presentation transcript:

Undulators Subgroup Summary April 20-21 FAC Review K. Robinson, J Undulators Subgroup Summary April 20-21 FAC Review K. Robinson, J. Pflueger Serial production Well in progress and in schedule 7.3M$ under budget deserves being mentioned Gives very good overall impression 1st Article in test at Argonne.

Magnetic measurements at SLAC MMF is ready for occupation and on schedule. All problems are properly addressed. Transition from “hand-crafted and -tuned” methods from single items to serial production is very important. Well defined software tools are under development at SLAC They are to be used by technicians and help to preserve quality and measurement rate. This is strongly recommended. Time between delivery of the new bench and start of measurements is very short! Release time pressure and greate time for commissioning by: Rearranging the whole measurement logistics. Rework time schedule for installation of undulator segments in LCLS by using present time buffers.

Beam Protection System Dosimetry in Undulator section Undulator Alignment Convincing alignment strategy was presented Plans indicate that specification will be comfortably met Beam Protection System Dosimetry in Undulator section Need is generally recognized. Dosimetry of undulator essential Especially needed during commissioning phase to limit dose deposition in undulator as demonstrated by recent FLASH experience. Activities need to be started soon in order to have a system available for commissioning.

Undulator Vacuum Chamber Time’s getting short! First beam will be in spring 08 Status similar to Oct05 review Al-coating problem is not yet convincingly solved. Vacuum chamber design critically depends on a timely solution of the coating problem. First prototype results will be available in July 06 In the bends RMS roughness of coated surfaces are worse than Al extrusions Exact time schedule for decision making is recommended to reduce risks. Alternatives should be considered.