P802.11aq Report to EC on approval to forward draft to RevCom

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Advertisements

Doc.: IEEE /0287r6 Submission March 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to Sponsor.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
xxxx doc.: IEEE /xxxxr0 March 2017
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2010
November 2008 doc.: IEEE /1437r1 November 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
Motion #1: TGaq EC Report
September 2009 Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 Closing Report
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Waiver Request Introduction
January 2012 doc.: IEEE /0179r1 Jan 2012
TGaq Closing Report Date: Authors: March 2015 March 2015
Presentation transcript:

P802.11aq Report to EC on approval to forward draft to RevCom March 2018 P802.11aq Report to EC on approval to forward draft to RevCom Date: 2018-03-06 Authors: Stephen McCann (BlackBerry)

March 2018 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for approval to send the IEEE P802.11aq Draft to RevCom. This document was approved during the plenary session of the IEEE 802.11 working group on 2018-xx-xx. Stephen McCann (BlackBerry)

Sponsor Ballot Results March 2018 doc.: IEEE 802.11-17/1045r8 March 2018 Sponsor Ballot Results Ballot Close Date Title Pool Return %Return Abstain %Abstain Approve Disapprove %Approve Nov 4, 2016 Initial Sponsor Ballot for P802.11aq draft 7.0 125 105 84 1 91 13 88 March 18, 2017 First Recirculation Sponsor Ballot for P802.11aq draft 8.0 110 2 98 10 90 June 23, 2017 Second Recirculation Sponsor Ballot for P802.11aq draft 9.0 111 102 7 93 July 29, 2017 Third Recirculation Sponsor Ballot for P802.11aq draft 10.0 106 3 97 Sept 9, 2017 Fourth Recirculation Sponsor Ballot for P802.11aq draft 11.0 4 96 Oct 1, 2017 Fifth Recirculation Sponsor Ballot for P802.11aq draft 12.0 113 108 Oct 30, 2017 Sixth Recirculation Sponsor Ballot for P802.11aq draft 13.0 114 109 Jan 4, 2018 Seventh Recirculation Sponsor Ballot for P802.11aq draft 14.0 115 92 Jan 31, 2018 Eighth Recirculation Sponsor Ballot for P802.11aq draft 14.0 99 Stephen McCann (BlackBerry) Dorothy Stanley (HP Enterprise)

Sponsor Ballot Comments – P802.11aq March 2018 Sponsor Ballot Comments – P802.11aq Ballot Close Date Title Total Number of Comments received (Yes and No votes) Nov 4, 2016 Initial Sponsor Ballot for P802.11aq draft 7.0 235 (120 T, 25 G, 90 E) March 18, 2017 First Recirculation Sponsor Ballot for P802.11aq draft 8.0 152 (131 T, 44 E) June 23, 2017 Second Recirculation Sponsor Ballot for P802.11aq draft 9.0 75 (43 T, 32 E) July 29, 2017 Third Recirculation Sponsor Ballot for P802.11aq draft 10.0 47 (21 T, 26 E) September 9, 2017 Fourth Recirculation Sponsor Ballot for P802.11aq draft 11.0 16 (10 T, 6 E) October 1, 2017 Fifth Recirculation Sponsor Ballot for P802.11aq draft 12.0 16 (15 T, 1 E) October 30, 2017 Sixth Recirculation Sponsor Ballot for P802.11aq draft 13.0 15 (12 T, 3 E) January 4, 2018 Seventh Recirculation Sponsor Ballot for P802.11aq draft 14.0 14 (12 T, 2 E) January 31, 2018 Eight Recirculation Sponsor Ballot for P802.11aq draft 14.0 1 (0 T, 1 E) Stephen McCann (BlackBerry)

Unsatisfied comments by commenter March 2018 doc.: IEEE 802.11-17/1045r8 March 2018 Unsatisfied comments by commenter Voter Initial Sponsor Ballot 1st Re-circulation 2nd Re-circulation 3rd Re-circulation 4th Re-circulation 5th Re-circulation 6th Re-circulation 7th Re-circulation 8th Re-circulation Total Roger Marks 5 4 6 9 28 Coordinating Committees IEEE RAC 1 3 13 Stephen McCann (BlackBerry) Stephen McCann (BlackBerry)

Unsatisfied comments by topics March 2018 doc.: IEEE 802.11-17/1045r8 March 2018 Unsatisfied comments by topics MAC privacy Roger Marks 28 IEEE RAC 13 Stephen McCann (BlackBerry) Stephen McCann (BlackBerry)

Unsatisfied comments March 2018 doc.: IEEE 802.11-17/1045r8 March 2018 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during sponsor ballot may be found in either of the embedded document on the right: Double click on the icon to the right to open this. The file is also available at: https://mentor.ieee.org/802.11/dcn/18/11-18-0347-00-00aq-unsatisfied-sponsor-ballot-comments-on-p802-11aq-draft-to-be-attached-to-the-report-to-the-ec-to-forward-draft-to-revcom.xlsx Stephen McCann (BlackBerry) Stephen McCann (BlackBerry)

Mandatory Coordination March 2018 Mandatory Coordination Coordination Entity Draft Date Status IEEE-SA Editorial (MEC) D13.0 (*) D14.0 (*) October 2017 (*) January 2018 (*) “Meets all editorial requirements.” (*) Quantities, Units and Letter Symbols (SCC14) Not required Terms and Definitions (SCC10) Registration Authority Committee (RAC) D10.0, D11.0, D12.0, D13.0, D14.0 July 2017, September 2017, October 2017, January 2018 All comments were processed. Outstanding unsatisfied comments remain. Waiver requested (*) Note: IEEE Editor provided comments as part of the 6th Recirculation Ballot (Oct 2017) and the 8th Recirculation Ballot (Jan 2018) indicating the “The draft meets all editorial requirements” Stephen McCann (BlackBerry)

P802.11aq Timeline March 2018 Initial Sponsor Ballot on D7.0 Open 2016-10-05 Close 2016-11-04 1st Recirculation Sponsor Ballot on D8.0 2017-03-08 2017-03-18 2nd Recirculation Sponsor Ballot on D9.0 2017-06-13 2017-06-23 3rd Recirculation Sponsor Ballot on D10.0 2017-07-19 2017-07-29 4th Recirculation Sponsor Ballot on D11.0 2017-08-30 2017-09-09 5th Recirculation Sponsor Ballot on D12.0 2017-09-21 2017-10-01 6th Recirculation Sponsor Ballot on D13.0 2017-10-20 2017-10-30 7th Recirculation Sponsor Ballot on D14.0 2017-12-20 2018-01-04 8th Recirculation Sponsor Ballot on D14.0 2018-01-21 2018-01-31 Report to EC on meeting conditions to proceed to RevCom 2018-03-09 Posting to RevCom by deadline 2018-03-16 Stephen McCann (BlackBerry)