Parasol and GreenSwitch: Managing Datacenters Powered by Renewable Energy Íñigo Goiri, William Katsak, Kien Le, Thu D. Nguyen, and Ricardo Bianchini Department.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Utility Planning Perspective For A Solar Feed In Tariff (FIT) February 3, 2009 Gainesville Regional Utilities.
Pricing for Utility-driven Resource Management and Allocation in Clusters Chee Shin Yeo and Rajkumar Buyya Grid Computing and Distributed Systems (GRIDS)
Greening Backbone Networks Shutting Off Cables in Bundled Links Will Fisher, Martin Suchara, and Jennifer Rexford Princeton University.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Building a Fast, Virtualized Data Plane with Programmable Hardware Bilal Anwer Nick Feamster.
Smart Grid: an Ontario Perspective Brian Hewson, Senior Manager Regulatory Policy Hamilton May 8, 2013.
Towards Automating the Configuration of a Distributed Storage System Lauro B. Costa Matei Ripeanu {lauroc, NetSysLab University of British.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Electric cars: part of the problem or a solution for future grids? Frans Nieuwenhout, Energy research Centre of the Netherlands ECN Sustainable.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Arithmetic and Geometric Means
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
Micro Focus Research 1 As far as youre aware, how does your organization plan to drive business growth over the next three years? (Respondents' first choices)
Solve Multi-step Equations
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
ONE LAPTOP PER CHILD This works are licensed under a Creative Commons Attribution 2.5 License. One Laptop per Child Laptop Power November 18, 2008 One.
Announcements Be reading Chapter 6.
Beckett Energy Systems
ABC Technology Project
Capacity Planning For Products and Services
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Lessons from community energy projects in Wales A brief overview Matthew Leese 1.
Management and Control of Domestic Smart Grid Technology IEEE Transactions on Smart Grid, Sep Albert Molderink, Vincent Bakker Yong Zhou
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
NEMA. 2 Utility Metering vs. Submetering 10/11/2014 New PowerPoint Template Utility Meter Meter provided by utility with the purpose of measuring.
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
PSSA Preparation.
Congestion Management Settlement Credits December, 2002.
University of Minnesota Optimizing MapReduce Provisioning in the Cloud Michael Cardosa, Aameek Singh†, Himabindu Pucha†, Abhishek Chandra
How Cells Obtain Energy from Food
Microsoft Volume Licensing
New Opportunities for Load Balancing in Network-Wide Intrusion Detection Systems Victor Heorhiadi, Michael K. Reiter, Vyas Sekar UNC Chapel Hill UNC Chapel.
GreenSlot: Scheduling Energy Consumption in Green Datacenters Íñigo Goiri, Kien Le, Md. E. Haque, Ryan Beauchea, Thu D. Nguyen, Jordi Guitart, Jordi Torres,
Intelligent Placement of Datacenters for Internet Services Íñigo Goiri, Kien Le, Jordi Guitart, Jordi Torres, and Ricardo Bianchini 1.
Lesson 25: Solar Panels and Economics of Solar Power
By Dale A Gulden, Solar Direct CEO. Solar Electric – Basic Components 1. Modules – solar electric collectors. 3 basic types in the marketplace: Mono crystalline,
Zero – Energy Building What constitutes a zero energy building? A building that uses a “net” of zero energy – typically producing excess energy via renewables.
CoolAir Temperature- and Variation-Aware Management for Free-Cooled Datacenters Íñigo Goiri, Thu D. Nguyen, and Ricardo Bianchini 1.
GreenHadoop: Leveraging Green Energy in Data-Processing Frameworks Íñigo Goiri, Kien Le, Thu D. Nguyen, Jordi Guitart, Jordi Torres, and Ricardo Bianchini.
Economy and calculations If 4 million households are provided with smart power cells, the total price of generators, all equipment and software will be.
Power off the Grid 4. The Net Zero Energy Home Produces as much electricity (energy) as it uses. Net metering is needed to monitor energy generated by.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
Leveraging Renewable Energy in Data Centers Ricardo Bianchini on tour 2012.
GreenSoftware: Managing Datacenters Powered by Renewable Energy Íñigo Goiri, William Katsak, Md E Haque, Kien Le, Ryan Beauchea, Jordi Guitart, Jordi Torres,
Building Green Cloud Services at Low Cost Josep Ll. Berral, Íñigo Goiri, Thu D. Nguyen, Ricard Gavaldà, Jordi Torres, Ricardo Bianchini.
Parasol: A Solar-Powered µDatacenter Íñigo Goiri Ricardo Bianchini, Thu D. Nguyen Team: Josep Lluis Berral, Md Haque, Bill Katsak, Kien Le Department of.
We hear much about energy problems; supply shortages, pollution issues and high prices, but the solutions to these problems are here now in the form of.
Staples: Developing an Integrated Renewable Energy Strategy.
Specification & Description
The Management of Renewable Energy
Presentation transcript:

Parasol and GreenSwitch: Managing Datacenters Powered by Renewable Energy Íñigo Goiri, William Katsak, Kien Le, Thu D. Nguyen, and Ricardo Bianchini Department of Computer Science

Motivation Datacenters consume large amounts of energy High energy cost and carbon footprint – Brown electricity: coal and natural gas Connect datacenters to green sources: solar, wind Apple DC in Maiden, NC 40MW solar farm 2

Challenges and opportunities Scheduling workload/energy sources – Lower costs: brown energy, peak brown power, capital Study opportunities in green datacenters – Build hardware/software Power Time Load Variable 3 Solar power Workload Source? Storage?

Outline Motivation Parasol – Solar-powered micro-datacenter GreenSwitch – Manage workload and energy sources GreenSwitch results Conclusion 4

Parasol 16 solar panels: 3.2kW 2 inverters: DCAC Installed on the roof Steel structure Small container IT equipment 2 racks 64 Atom servers 2 switches 3 PDUs 16 lead-acid batteries: 32kWh 2 charge controllers: Off-grid, DCAC 5

Electrical infrastructure Charge Controller Inverter Electrical Panel DC AC DC AC Power grid AC 6 IT Equipment

Example energy source management Charge Controller Inverter Electrical Panel DC AC DC AC Power grid AC Time Power 7 IT Equipment

Example energy source management Charge Controller Inverter Electrical Panel DC AC DC AC Power grid AC Time Power 8 IT Equipment

Example energy source management Charge Controller Inverter Electrical Panel DC AC DC AC Power grid AC Time Power 9 IT Equipment

Possible energy source management Power Time Basic 10

GreenSwitch Minimize brown electricity cost – Brown energy – Peak brown power – Battery lifetime constraint Manage energy sources – Use solar/net metering – Charge/discharge battery – Limit brown peak power Manage workload – Turn servers on/off – Delay deferrable jobs ParasolGreenSwitch Perform changes Get status 11

GreenSwitch GreenSwitch architecture Predictor Battery Charge Level Workload Prediction Energy Availability Prediction Solver Energy Source Schedule Workload Schedule Configurer Parasol Time Power Brown Price Solar Time Power Workload Use solar to power all servers Charge battery with surplus solar Workload Model & MILP 12

Experimental environment Evaluation on 64 Parasol nodes – 12 one-day experiments – Deferrable vs. non-deferrable workloads – Baseline datacenter (no solar, no batteries, no delays) New Jersey brown electricity pricing – On/off-peak energy, peak power, net metering GreenSwitch for Hadoop (configurer) 13

Experimental environment 14 SWIM: Facebook based workload [MASCOTS11] IT load

Parasol without GreenSwitch Green use Green available Net metering Brown use IT load 66% cost savings Solar amortized in 7 years 15

GreenSwitch: non-deferrable workload Battery discharge Battery charge IT load 75% cost savings Batteries cannot be amortized Peak grid power 16 Green useBrown use Green available

GreenSwitch: deferrable workload Battery discharge Battery charge IT load Net metering 96% cost savings Solar + batteries amortized in 7.6 years 17 Green available Green use

Parasol: a real system Real software running on real hardware Power losses Overhead of energy source switching System limitations – Net metering vs. Battery charging – Use brown vs. Net metering – Green battery charging vs. Use brown 18

Conclusions Green datacenters – Challenges & opportunities – Hardware/software solution GreenSwitch benefits – Delaying load and solar gives the best results – Reduces amortization time by 1.8-2x – Flexibility: no batteries, workloads, wind… 19

Parasol and GreenSwitch: Managing Datacenters Powered by Renewable Energy Íñigo Goiri, William Katsak, Kien Le, Thu D. Nguyen, and Ricardo Bianchini

Fewer conversions – Grid-tie: ACDC Low conversion losses 21 Commodity hardware – Availability – Cheaper Cheaper transmission

Parasol: lessons learned Not cheap – Flexibility adds complexity and cost – Placement on the roof – Full monitoring Not easy – Complete design – Dealing with facilities, companies, and vendors – Mistakes are easy – Delays, delays, and more delays 22

Viability of green datacenters Example companies investing in self-generation – Apple, Microsoft, McGraw-Hill Research shows cost savings Getting more attractive – Space: Solar panels are getting more efficient – Cost: 7x cheaper than 30 years ago – Governmental Incentives Grid-centric: power purchase agreement – Losses, dependence, long term scalability 23

Other results Energy storage – Batteries – Net metering pricing Peak grid power charges Solar availability – Cloudy, sunny, rainy… Other workloads – Nutch Grid outage 24