TGu Draft Revision Procedure

Slides:



Advertisements
Similar presentations
Coexistence Motions for LB84 Comment Resolution
Advertisements

LB84 General AdHoc Group Sept. Closing TGn Motions
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
March 2013 Opening Report Date: Authors: March 2013
TGn Sync Atlanta Presentation on Confirmation
Motions Date: Authors: January 2006
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
TGu Closing Report Date: Authors: November 2005
March 2014 Election Results
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
3GPP liaison report May 2006 May 2006 Date: Authors:
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
TGu Motions Date: Authors: September 2006 September 2006
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Timeline Date: Authors: January 2005 January 2005
TGv Redline D0.06 Insert and Deletion
July 2012 Opening Report Date: Authors: July 2012
TGu Closing Report Date: Authors: September 2005
TGs San Diego Closing Report
TGu Timeline Date: Authors: July 2005 July 2005
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
March 2012 Opening Report Date: Authors: March 2012
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGp Closing Report Date: Authors: March 2007 Month Year
November Opening Report
TGr Proposed Draft Revision Notice
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
May 2005 CAPWAP AHC Closing Report
TGu Motions Date: Authors: May 2006 May 2006
Liaison Report From Date: Authors: Month Year
Beamforming and Link Adaptation Motions
[ Policies and Procedure Summary]
November 2012 Opening Report
September 2012 Opening Report
January Opening Report
TGu Timeline Date: Authors: May 2006 May 2006
Motion to go to Letter Ballot
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Motions Date: Authors: September 2006 September 2006
TGu Timeline Date: Authors: July 2005 July 2005
TGr Proposed Draft Revision Notice
TGp Motions Date: Authors: January 2006 Month Year
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

TGu Draft Revision Procedure September 2006 doc.: IEEE 802.11-06/14630 September 2006 TGu Draft Revision Procedure Date: 2006-09-17 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart.kerry@philips.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

September 2006 doc.: IEEE 802.11-06/14630 September 2006 Abstract This presentation describes the procedures to move the baseline TGu draft to the working group for letter ballot Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

Flowchart September 2006 September 2006 doc.: IEEE 802.11-06/14630 Baseline draft Step 1: Motions to amend text (address requirements/resolve conflicts) Call for submission/proposal to meet requirement > 75% vote to retain requirement All requirements addressed? Step 2: Requirement confirmation vote no Step 3: TG internal review; solicit comments Remove requirement Step 4: Internal review resolution Solicit proposals to address comments (75% affirmative required change text) Confirmation vote < 75% Send draft to full working group > 75% Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

More Detailed Steps Step 1: create initial draft September 2006 doc.: IEEE 802.11-06/14630 September 2006 More Detailed Steps Step 1: create initial draft Existing proposals that have passed downselection are incorporated into the draft in this stage Step 2: requirement check After incorporating all proposals, it should meet our requirements Requirements that are not met by the current draft require a 75% confirmation vote to be retained because waiting for a new proposal will slow down progress. There must be clear desire in the group to retain a requirement that is not met. Step 3: internal TG review This is like letter ballot, only internal to task group At 75% vote, draft is submitted to task group Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks