The MTCA/ATCA Workshop for Research and Industry

Slides:



Advertisements
Similar presentations
Test Beam at IHEP,CAS ZHANG Liang sheng, Test Beam Group Introduction BEPC/BES Ⅱ will be upgraded as BEPC Ⅱ / BES Ⅲ, it is necessary to do beam test for.
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
LLRF workshop 2013 Towards the next generation LLRF LBNL Gang Huang On behalf of LLRF Team LLRF workshop Oct. 1, 2013.
Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing October 18, 2007.
The Development of Digital Power Supply in IHEP and An APF technology based on Wavelet Analysis Guo Xiaoling, IHEP
ICALEPCS 2007 Summary Karen S. White Jefferson Lab.
The design of HEPS digital BPM electronics BI Group, accelerator division.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Prospects for Hadron Physics in Asia H. Shimizu Laboratory of Nuclear Science Tohoku University,
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing ICALEPCS2007 October 18, 2007.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Chinese Academy of Sciences Institute of High Energy Physics Accelerator Center Power Supply Group Status of BEPCII and CSNS Power Supply System Qi Xin.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
Working Group 1 Synchrotrons/LHC Summary Report Mike Brennan Philippe Baudrenghien Four Talks, and much discussion (LHC)
Design of BEPC Ⅱ Bunch Current Monitor System Zhanglei Beam Instrumentation Group.
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
Digital RF control at LBNL Gang Huang on behalf of the LBNL LLRF team LLRF2015.
Design of New LLRF System for the SPring-8 Storage Ring T. Ohshima on behalf of RF team of SPring-8-II project LLRF Workshop Shanghai.
LLRF Activities at KEK/J-PARC Zhigao Fang 1 SuperKEKB 2 cERL (compact Energy Recovery Linac) 3 STF (Superconducting RF Test Facility) 4 J-PARC LLRF workshop.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Programming Linear Regression Procedure for Analog & Digital Data Megan Williams University of Arkansas at Pine Bluff SIST '14 Craig Drennan University.
ORNL is managed by UT-Battelle for the US Department of Energy Low Level RF Status and Development Activities at the Spallation Neutron Source Mark Crofford.
Possible LLRF Configuration in ILC Sigit Basuki Wibowo LLRF Workshop, Shanghai - Nov 5, 2015.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
WP9 updated Upgrade of SPARC test facility for high gradient acceleration of electron beams for SuperB collider and FEL projects WP number9Start month1End.
Digital LLRF plans at the Australian Synchrotron P.Corlett, K.Zingre, G. LeBlanc Australian Synchrotron, 800 Blackburn Road, Clayton 3168, Victoria, Australia.
LLRF development of SSRF RF Group and Linac Group
Experience of Developing BEPCII Control System
MicroTCA Development and Status
Operations Machine Simulator.
Study on IFMIF Beam-Target Interface
Data transmission system for 2D-SND at CSNS
LLRF Research and Development at STF-KEK
M.J. Barnes : Canadian Involvement with LHC
Overview and System Design for ESS LLRF Systems
Failure analysis at BEPCII
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
Status and Interest of the X-ray FEL SINAP
ILC LLRF Status Ruben Carcagno, Brian Chase
SuperB Injection, RF stations, Vibration and Operations
New xTCA Developments at SLAC
Operation Reliability of SSRF and upgrade plan at SSRF
Remarks on Russian capabilities in industrial accelerators development
Electronics requirements for special diagnostics for the XFEL
The EPICS running envirionments in the five accelerator projects
ERL2015 WG4: RF & superconducting RF for ERL
Introduction of IHEP.
Introduction of IHEP.
Injector Topics for Discussion
Particle Accelerators in China Particle Accelerator Branch, Chinese Physics Society The China Association for Science and Technology P.O. Box 918, Beijing.
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Way of working with ICS HWI Hardware and Integration
WELCOME TO OTTOMMO Casting OTTOMMO Casting WELCOME TO OTTOMMO Casting OTTOMMO Casting.
Mini-Workshop on BEPCII Background Study
Novel Accelerator and Detector Systems
About Us: Oimtec is a leading organization specializing in the design and manufacture of ground support, heavy duty component assembly,
Presentation transcript:

The MTCA/ATCA Workshop for Research and Industry

WELCOME TO BEIJING

WELCOME TO IHEP

SPECIAL THANKS TO

SPECIAL THANKS TO

all participants like you for supporting! SPECIAL THANKS TO all participants like you for supporting!

A BRIEF HISTORY OF ACC. CONTROL SYSTEMS IN CHINA Digital LLRF based on cPCI or MTCA Computer control + manual control Centralized structures mostly used Single-board computers for local control Various field buses Poor operator interface FPGA based feedback systems EPICS is widely used for developing accelerator control systems First EPICS control system in operation (2001) China Spallation Neutron Source (2011-) Shanghai Synchrotron Radiation Facility (2004-) HLS Phase I (1991-1998), Phase II (1998-2010), HLS-II (2010-) BEPC (construction 1983-1989, operation 1989-2005), BEPC II ( construction 2005-2010, operation 2010- ) HIRFL (1976-2000), HIREL-CSR (2000-) 1980 1990 2000 2010 2020

MTCA BASED ACCELERATOR CONTROL SYSTEM @IHEP ADS main Linac LLRF system LLRF system of the BEPC-II Sub-harmonic bunching systems Upgraded in 2017 ADS Injector-I LLRF system “Pizza Box” architecture MicroTCA architecture

THE PURPOSE IS using the most advanced technologies, both hardware and software, to gain higher beam stability, and faster and higher precision data acquisition. 

Thank you for coming!