Power Measurements on Mira Argonne Leadership Computing Facility Susan Coghlan Mira Project Manager Argonne National Laboratory June 18, 2012.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration Global Results.
Advertisements

Bernard Casier Member Quality Audit Cell The Flemish Quality Audit System Brussels, 26 th June 2012.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Deploying IPv6: The time is now Are you ready? SFTA 24 May 2012 John Curran President and CEO, ARIN.
SAN DIEGO SUPERCOMPUTER CENTER at the UNIVERSITY OF CALIFORNIA, SAN DIEGO Green Datacenter Initiatives at SDSC Matt Campbell SDSC Data Center Services.
UPS Topologies and Multi-Module Configurations
All Rights Reserved, Copyright(C) 2007, Hitachi, Ltd. 1 Transport-layer optimization for thin-client systems Yukio OGAWA Systems Development Laboratory,
REVIEW Fully factorize
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Andrew Meade School of Biological Sciences.
© University of Reading School of Systems Engineering Matlab Assessment for Final Year Units Victor M. Becerra School of Systems.
Die ZBW ist Mitglied der Leibniz-Gemeinschaft A Data Restore Model for Reproducibility in Computational Statistics Daniel Bahls, ZBW, I-Know 2013, Graz,
The Future of Wireless Lee Rudolph
INVENTORY AND OVERHEAD
Solar Photovoltaic Power Stations. Fully Commissioned in Months Phased-In Generation Within One Month 99%+ Availability Offset Substation and Feeder Expansion.
GPUs and Future of Parallel Computing Authors: Stephen W. Keckler et al. in NVIDIA IEEE Micro, 2011 Taewoo Lee
© Copyright 2012 HP 1 Hoe uw netwerk afstemmen op de evolutie van uw datacenter? Raf Peeters, HP Geert De Ron, RealDolmen.
Advanced Lustre® Infrastructure Monitoring (Resolving the Storage I/O Bottleneck and managing the beast) Torben Kling Petersen, PhD Principal Architect.
Upgrade of Jaguar from Cray XT5 to XK6 Cray Linux Environment operating system Gemini interconnect 3-D Torus Globally addressable memory Advanced synchronization.
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Substation L1/ MCC L1 Update March 21 st, Current Location.
Parasol and GreenSwitch: Managing Datacenters Powered by Renewable Energy Íñigo Goiri, William Katsak, Kien Le, Thu D. Nguyen, and Ricardo Bianchini Department.
OFFICE OF SUPERINTENDENT OF PUBLIC INSTRUCTION Division of Assessment and Student Information Online MSP Testing Technology & Assessment Coordinator Training.
Bruxelles, June 1st, 2005 CESI 1 Electricity Sector A.Invernizzi (Italy) Future Needs for Research Infrastructures Energy.
Measuring Length Changing centimetres to metres..
© Crown copyright Met Office Met Office Unified Model I/O Server Paul Selwood.
Video 1 Solve 4(m + 12) = –36 3(2 –3p) = 42.. Your turn Solve –3(5 – 4r) = –9.
KAIST Computer Architecture Lab. The Effect of Multi-core on HPC Applications in Virtualized Systems Jaeung Han¹, Jeongseob Ahn¹, Changdae Kim¹, Youngjin.
Test B, 100 Subtraction Facts
By: Jeffrey Bivin Lake Zurich High School Last Updated: October 11, 2005.
Weekly Attendance by Class w/e 6 th September 2013.
Please read this before using presentation This presentation is based on content presented at the Exploration Safety.
Lesson 2-3 Example Example 1 Use the Distributive Property and a model to find 6 ● Draw a model to show 6 ● 13.
資工研二 翁靜美. L 1 : 1, 2, 5, 6L 2 : 3, Input:Two sorted lists, L 1 = (a 1, a 2,..., a n1 ) and L 2 = (b 1, b 2,..., b n2 ). Output:A sorted list.
CURRENT AND FUTURE HPC SOLUTIONS. T-PLATFORMS  Russia’s leading developer of turn-key solutions for supercomputing  Privately owned  140+ employees.
Chapter 9: Software Tools and Dashboards. 2 V. Kumar and W. Reinartz – Customer Relationship Management Overview Topics discussed  CRM Implementation.
1 PREPAYMENT METERING IN RURAL UAE AREAS Prof. Dr. E. El-Shirbeeny Electric Power Research Laboratory Abu Dhabi Water & Electricity Authority ADWEAADWEA.
Driving HPC energy efficiency  Energy Efficient HPC Working Group Forum for sharing of information Peer-to-peer exchange Best practices and case studies.
Critical Flags, Variables, and Other Important ALCF Minutiae Jini Ramprakash Technical Support Specialist Argonne Leadership Computing Facility.
Frankfurt (Germany), 6-9 June 2011 Agenda 1. Background 2. System Design 3. Experience 4. Future work Henrik Stomberg– Sweden – Session No 4 – Paper No.
Bleeding edge technology to transform Data into Knowledge HADOOP In pioneer days they used oxen for heavy pulling, and when one ox couldn’t budge a log,
Herbert Huber, Axel Auweter, Torsten Wilde, High Performance Computing Group, Leibniz Supercomputing Centre Charles Archer, Torsten Bloth, Achim Bömelburg,
New Data Center at BNL– Status Update HEPIX – CERN May 6, 2008 Tony Chan - BNL.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
Sepam case studie EN 2007_01.ppt1 Installation single-line diagram G M Transformer 63KV / 6.3KV 10MVA Generator 2MVA 30A / 5s 6A continuous 1 CSH 30A /
Argonne Leadership Computing Facility ALCF at Argonne  Opened in 2006  Operated by the Department of Energy’s Office of Science  Located at Argonne.
Data Transfers in the ALCF Robert Scott Technical Support Analyst Argonne Leadership Computing Facility.
Nikhef/(SARA) tier-1 data center infrastructure
CERN – IT Department CH-1211 Genève 23 Switzerland t Working with Large Data Sets Tim Smith CERN/IT Open Access and Research Data Session.
1 Université Laval, Calcul Québec, Calcul Canada Colosse Sun 6048 system 10 compute racks 960 nodes, 7680 cores 1 PB Lustre filesystem 1.
Energy Efficient Data Centers Update on LBNL data center energy efficiency projects June 23, 2005 Bill Tschudi Lawrence Berkeley National Laboratory
BNL Service Challenge 3 Status Report Xin Zhao, Zhenping Liu, Wensheng Deng, Razvan Popescu, Dantong Yu and Bruce Gibbard USATLAS Computing Facility Brookhaven.
Advanced Research Computing Projects & Services at U-M
Implementing of Data Conferencing in The Boeing Company Steven E. Poltrock and Gloria Mark.
ACTI-OCI working group Optimizing Computing Infrastructure Working Group Status Report Robin Ying Jan 10, 2012.
The Worldwide LHC Computing Grid Frédéric Hemmer IT Department Head Visit of INTEL ISEF CERN Special Award Winners 2012 Thursday, 21 st June 2012.
Extreme Scale Infrastructure
Insider Connectivity Review & Savings Analysis
SCE Energy Storage Perspective
Kai Li, Allen D. Malony, Sameer Shende, Robert Bell
IT Services Katarzyna Dziedziniewicz-Wojcik IT-DB.
CERN Data Centre ‘Building 513 on the Meyrin Site’
SANDIA NATIONAL LABORATORIES
مهارات القيادة التحويلية
ETHZ, Zürich September 1st , 2016
Facility Power Management
K computer RIKEN Advanced Institute for Computational Science
K computer RIKEN Advanced Institute for Computational Science
Pulling a Report in Marketplace
Presentation transcript:

Power Measurements on Mira Argonne Leadership Computing Facility Susan Coghlan Mira Project Manager Argonne National Laboratory June 18, 2012

The Mira System Argonne National Laboratory - ISC Mira Statistics 10 PF Peak8.1 PF HPL 48 Racks48K compute nodes 768K cores3.1 B threads 768 TB memory16 GB memory per node 28 PB disk240 GB/s 4.8MW peak48 racks at 100kw each

Mira 480V Compute Power Distribution System Argonne National Laboratory - ISC KV Substations Transformers 480V Distribution Panels Eaton Digitrip Optim 1050 BG/Q Compute Racks Measuring points Bulk Power Modules (BPM) NodesDCAs 7 Domains Bulk Power Modules (BPM) NodesDCAs 7 Domains Bulk Power Modules (BPM) NodesDCAs 7 Domains

ALCF Power Measurement Methodology Challenges Challenge #1: Length of time required for HPL run –Mira integration not complete, system still in hands of vendor –Difficult to justify so many hours just to measure power –Recommend using a benchmark that runs in an hour or two Challenge #2: Access to external AC power data required for L2 and L3 –Building and all infrastructure is owned by a 3 rd party Trust –Distribution panel power measurement data only visible to the building management company –All contact with building management company must go through the Argonne Data Center Manager (ADCM) –Still no data after months of working through ADCM –Attempted to find boxes to measure between panels and racks Impossible to find existing boxes – 480V 3 Phase, receptacle HBL560R7W Custom ones cost just under $10K per rack to rent Argonne National Laboratory - ISC

Mira 480V Compute Power Distribution System Argonne National Laboratory - ISC KV Substations Transformers 480V Distribution Panels Eaton Digitrip Optim 1050 BG/Q Computes Measuring points Bulk Power Modules (BPM) NodesDCAs 7 Domains Bulk Power Modules (BPM) NodesDCAs 7 Domains Bulk Power Modules (BPM) NodesDCAs 7 Domains Accessible to ALCF

Data from 48 racks running HPL Argonne National Laboratory - ISC