ONILE CONTINEOUS EMISSION MONITORING SYSTEM

Slides:



Advertisements
Similar presentations
U.S. Environmental Protection Agency April 13, 2011 Final Rules to Reduce Air Toxics from Boilers.
Advertisements

Harmonization of Parts 60 and 75
Air Permitting and Compliance Smithfield Foods Environmental Conference Chicago, IL July 2013.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Using PI for Reporting Regional Seminar Series Skye Blair and Alan.
Recommendations of Working Group I concerning: Categorization of Industry Objectives Proposed Norms Proposed Sction Points PROPOSED “CHARTER ON WATER RECYCLING.
1 Proposed Rule: Amendments to the Protocol Gas Verification Program and Minimum Competency Requirements for Air Emission Testing Presented at May 12,
Workshop on “Real Time Data Transmission from Continuous Monitoring Systems (CMS)” CMS Data flow from Industries to SPCB & CPCB Presented By Aditya Sharma.
Real-time Environmental Data Verification and Presentation August 6 th, 2014 Kavitha B V Central Pollution Control Board, New Delhi.
Why do we lose analyzer data? Monitor malfunction DAS malfunction Power outages Environmental problems Wildlife damage Vandalism Operator error.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
Self-monitoring programme for a Swedish power plant Hans-Roland Lindgren Director Swedish EPA 1.
Tamil Nadu Pollution Control Board
A History and Status of CEMS Applications in USEPA Regulations Dale Evarts US EPA December 16, 2002 Better Air Quality in Asian Cities 2002
INDUSTRIAL BOILER MACT (40 CFR 63 Subpart DDDDD)
08/06/02 Apex Instruments, Inc. Equipment Overview Typical Industries and Sources Tested using Apex Instruments Equipment Acid Plants Asphalt Plants Boilers.
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
CEN workshop EN 14181, May 2006, Paris 1 Inquiry of implementation and experiences with EN in Belgium Raf De Fré, Ive Vanderreydt - VITO, Mol.
Centre for Science and Environment JSW Energy Vs Top Performers Topper- No comparison with average performers Topper- Higher benchmarks, higher expectations.
Results you can rely on What Is New/Updated in Air Quality? TRC Companies, Inc. August 2011 TRC Companies, Inc. August 2011.
Air Pollution as a Feedback Control Loop Andrew McCarthy.
Particulate Matter Monitoring Required by the Utility MATS Eric Swisher| | ext. 17 August 22, 2012 Presented to ARIPPA.
DIOXIN MEASUREMENTS IN CANDIDATE COUNTRIES PROJECT
Air Quality Governance in the ENPI East Countries Regulation of non-Annex I activities in the CR and UK Monika P ř ibylová.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
Florida Department of Environmental Protection Mercury Workshop – February 10, Medical Waste Incinerators and Other Misc. Sources of Mercury John.
| Philadelphia | Atlanta | Houston | Washington DC Boiler MACT Compliance Plans: Failure to Develop Plans Is Planning to Fail Susie Bowden|
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheWorkshop European Standards Requirements of.
UTILITY MACT WORKING GROUP STATE AND LOCAL STAKEHOLDER RECOMMENDATIONS.
Tamilnadu Pollution Control Board CARE AIR CENTRE Centre for Assessing Real Time Air (Quality) Information Reports Centre for Assessing Real Time Air (Quality)
1 Review of the Integrated Pollution Prevention and Control (IPPC) and National Emission Ceilings (NEC) Directives Marianne Wenning DG ENV, Head of Unit,
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Hardware Analyser vs Software Analyser
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Virtual Analyser What is it Have you ever faced an analyser failure that requires a plant shut down to repair & wished that there.
Page 1 Annexes of the Directive 96/61/ES on IPPC Agency on Integrated Prevention Ms. Lucie Svobodová Integrated and Planned Enforcement of Environmental.
Emission source sampling and monitoring Topic 6 Ms Sherina Kamal May
1 Region 5 Enforcement Approach George Czerniak June 13, 2007 NACAA Enforcement and Compliance Workshop.
Air Pollution as a Feedback Control Loop Andrew McCarthy.
Lancom 4 In Power and Boilers Derek Stuart. Lancom 4 In Power and Boilers Derek Stuart Combustion Theory In order to maximize the heat capture (efficiency)
LCPs – Large Combustions Plants – what ist a large combustion plant?  > 50 MW rated thermal input  Irrespective of type of fuel, age and branch  Heat.
Quality is the totality of features and characteristics of product or services that bear on its ability to satisfy the stated needs.  In simple words.
We are service provider in following field 1.Water treatment 2.Waste water treatment 3.Rain water harvesting system 4.Laboratory set-up 5.Industrial Effluent.
ENVIRONMENT PROTECTION ACT By Shri. V.Y. Dhupdale B.Com., LL.B., LL.M., (NET) Lecturer, Dept. Of Law, SUK.
Robert S. Wright US EPA, Research Triangle Park, NC EPA Protocol Gases Fall 2012 Update PurityPlus Specialty Gas Producers.
RACT 2 – Source Testing and Monitoring Requirements Air Quality Technical Advisory Committee August 4, 2016 Harrisburg, PA Tom Wolf, GovernorPatrick McDonnell,
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Butibori CETP Pvt. Ltd. Environmental Activities & Technological Initiatives Plot No. P-13 Near Indorama Gate No-1, MIDC Industrial Area, Butibori, Nagpur.
CASE STUDIES * System Engineering, 9th Edition Sommerville.
DOCUMENT AND DATA CONTROL
Complying with Periodic Emissions Monitoring Requirements
Annexes of the Directive 96/61/ES on IPPC
Instrument Maintenance
SERBIAN NATIONAL ACTION PLAN [DRAFT]
National Laboratory Association
Setting Actuarial Standards
ANALYSERS & INSTRUMENTS DEPT. OPASTOP GP2001H
Van Wert, OH Water and Wastewater Element Training
Air Monitoring Trends in New Jersey
Calibration in the Ambient Air Quality Monitoring Network
LDV Real Driving Emissions: - Drafting of physical PEMS protocol –
Training Module Presented by Steve Wright
Miroslav Variny, Otto Mierka
Changes in NRPP Device and Proficiency Elements
Preparing for a Stack Test
H2S Monitors.
MoU Between Jharkhand State Pollution Control Board & University of Chicago Trust 1st March, Palash Auditorium, Doranda, Ranchi.
Hotels/Banquets/Clubs & Allied Industries
Total Solution for Flue Gas Analyzer Series
Nonconformity Writing
HAZARDOUS WASTE MANAGEMENT
Presentation transcript:

ONILE CONTINEOUS EMISSION MONITORING SYSTEM A Presentation by JHARKHAND STATE POLLUTION CONTROL BOARD On 25TH June, 2019

WHY CEMS As per the 1st Revised Guideline for CEMS, August 2018, CEMS is to Installed at – All the 17 categories of highly polluting industries along with Bio Medical Waste Incinerators and Hazardous Waste Incinerators. Installation of online PM10 Analyzer for major air polluting industries including Railway Sidings, Coal/ Iron ore/ Bauxite mines/ Hard Coke units has been made mandatory. http://jspcb.nic.in/upload/5bd05a060aaefUpdated%20list%20of%2017%20Cat.%20of%20highly%20polluting%20Ind.%20and%20calibrati on%20.pdf

PARAMETER SPECIFIC EMISSION STANDARD: ONLINE Industries/Facilities Emission Parameters Aluminum PM, CO, Total Floride, Cement Plant PM, SO2, HCl , HF, TOC & NOx Integrated Iron & Steel Plants PM, SO2, NOx & CO Oil Refinery PM, SO2, CO & H2S Petrochemical Power Plant PM, SO2, NOx, & Hg Zinc PM & SO2 Copper Biomedical Waste Incinerator PM, SO2, HCl, CO & CO2 Common Hazardous Waste Incinerator PM, HCl, SO2, NOx, HF, TOC & CO Sugar, Cotton Textile, Composite Woolen Mills, Synthetic Rubber, Pulp & Paper, Distilleries, Leather Industries, Calcium Carbide, Carbon Black, Natural Rubber, Asbestos, Caustic Soda, Small Boilers , Aluminium Plants,Tanneries, Inorganic Chemicals & other such industries using boilers PM, SO2 & NOx Distillery PM ChlorAlkli Cl2 &HCl Fertilizer PM & Fluoride Refer : http://jsac.jharkhand.gov.in/pollution/

PARAMETER SPECIFIC EMISSION STANDARD: ONLINE Industries/Facilities Name & Loaction Emission Parameters Bio-Medical Waste Incinerators M/s Bio Genetic Laboratory Pvt. Ltd. Hesla, Ramgarh. M/s Medicare Environmental Management Pvt. Ltd. Lohardaga Industrial Area, Lohardaga, Jharkhand. PM, NOx, HCl, CO & CO2 Hazardous Waste Inceinerators M/s Adityapur Waste Management Pvt. Ltd. Dugni, Saraikela, Kharsawan. PM, HCl, SO2, Nox, HF, TOC & CO Refer : http://cpcb.nic.in/ocems1/

REASONS FOR DATA UNAVAILABILITY Data Unavailable at Technological problems Behavioural Issues Organizational Problems Site CEMS Software malfunction Disconnecting CEMS softwares Improperly structured maintenance contract IT Vendor Software Malfunction Switching off PC Lack of skilled personal Hardware Issues Server Malfunctioning of Server Data retrieval problems

CAUSES FOR DATA UNAVAILABILITY Selection of Technology Correct installation of CEMS (Isokinetic sampling points) Quality Assurance and control Calibration Requirement Data Handling System

ACTION TAKEN BY JSPCB Minimum 85% shall be transmitted to JSPCB otherwise JSPCB may issue Show Cause notice, requiring immediate feedback on corrective action. Environmental Compensation shall be implied on the industries by JSPCB if they fail to take stringent actions for the compliance of faulty data/irregularity of data within period of 1 month.

SELECTION OF AN ANALYSER Based on temperature and moisture content in the stack. Dew point of sample gas and corrosive gases. Dust content in stack Range and maintenance of analyzer

Refer: http://cpcb.nic.in/ocems1/ CALIBRATION OF CEMS The continuous Particulate Matter monitoring system (PM-CEMS) shall be calibrated at different operational loads against isokinetic sampling method at the time of installation. Calibration shall be done once in 06 months by empaneled laboratories by CPCB using standard reference methods and at a frequency specified. Refer: http://cpcb.nic.in/ocems1/

Refer: http://cpcb.nic.in/ocems1/ CALIBRATION OF CEMS For Gaseous Parameters:- The instruments/ analyzers shall be calibrated with respect to their functioning, drift, linearity detection limit, output, operating temperature and other relevant parameters before installation The industries shall ensure tamper-proof operation of CEMS devices Refer: http://cpcb.nic.in/ocems1/

WAYS TO DEAL WITH EXCESSES EMISSIONS Average emission for initial 30 minutes shall not be considered during the plant start-up or batch process. Values recorded during calibration/ preventive maintenance shall not be considered for Exceedance. Incase of Exceedance value, SPCB may issue Show Cause notice, requiring immediate feedback on corrective action.

WAYS TO DEAL WITH EXCESSES EMISSIONS If, the emission quality continuously exceeds the prescribed norms by 10% of standard and for duration of 1 hour then Industry shall immediately inform the SPCB about the control measures initiated by them. Incase of failure, closer of its operation.

CEMS DATA FOR REGULATORY ACTIONS Data performance : How much data received at server Performance: How much and for how long the value exceeded Generation of Performance Report & Identify the defaulters Action Framework: Action taken as per Guidelines

ACTION FRAMEWORK BY JSPCB Period of observation (No. of Weeks = X) Criteria Based on Data Performance JPSCB will send - Show Cause letter to the client 1 Week Industry is one of 5 with lowest positive data availability and mean data availability is< 85% OR Industry has zero data availability for at-least X weeks in the past 4 weeks JSPCB will send another Show Cause letter to client and meets the client & CEMS vendor 2 Week JSPCB will send the Show Cause letter for the third time and conduct a site visit and verify the stack sample JSPCB Officials may issue Closure and Environmental Compensation shall be imposed. 4 Week

How could CEMS be made effective? DATA GENERATION Industry sends well-calibrated data, with high uptime DATA APPLICATION ROs take measures on industries as per protocol using CEMS Data. DATA ANALYSIS Data quality checked Summarized to ROs in an actionable manner - High instantaneous emissions - Clear weekly summaries

Thank you Mail:ranchijspcb@gmail.com Ph. No. - 0651-2400850/ 1/ 2

CONTACT PERSON DETAILS 1. NAME:- MR. B. K. GUPTA CONTACT:- 9955989422 Email:ranchijspcb@gmail.com PH. NO. - 0651-2400850/ 1/ 2 2. NAME : JYOTSANA DESIGNATION: CE CONTACT NO.:9123268119 Email I.D: ranchijspcb@gmail.com