Letter Ballot Scheduling Constraints

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1291r0 Submission November 2009 Matthew Gast, Trapeze NetworksSlide 1 November 2009 TGmb Closing Report Date: Authors:
Advertisements

Doc.: IEEE /0159r1 Submission January 2009 Matthew Gast, Trapeze NetworksSlide 1 January 2009 Closing Report for TGmb Date: Authors:
Doc.: IEEE /0077r1 Submission January 2008 Stephen McCann, Nokia Siemens NetworksSlide 1 TGu Motions Date: Authors:
Doc.: IEEE /1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: Authors:
Doc.: IEEE /2764r1 Submission November 2007 Stephen McCann, Nokia Siemens NetworksSlide 1 TGu Motions Date: Authors:
Doc.: IEEE /0077r0 Submission January 2008 Stephen McCann, Nokia Siemens NetworksSlide 1 TGu Motions Date: Authors:
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Doc.: IEEE /1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 1 Feedback received on Revision PAR Date: Authors:
TGv Closing Report March 2008
Task Group G Report January 17, 2003
Closing Report Date: Authors: November 2008 September 2008
IEEE aj January 2016 Closing Report
TGs Process, November Date: Authors: November 2007
TGax March 2017 Closing Report
TGmb Editor Report - Jan 2010
IEEE P Working Group for Wireless Personal Area Networks
TGad September 2010 Closing Report
TGaf Waikoloa Closing Report
March 2009 Closing Report for TGmb
May 2009 Closing Report for TGmb
Closing Report Date: Authors: July 2007 July 2007
July 2009 TGmb Closing Report
TGaf Geneva Closing Report
January 2009 Closing Report for TGmb
IEEE TGaf Waikoloa Closing Report
Closing Report Date: Authors: November 2009 November 2009
January, 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [January 1394-Wireless Working Group Liaison.
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
Closing Report Date: Authors: November 2009 November 2009
Feedback received on Revision PAR
TGaf San Antonio Closing Report
TGs Process, November Date: Authors: November 2007
January 2010 TGmb Closing Report
IEEE P Working Group for Wireless Personal Area Networks
Closing Report Date: Authors: September 2009 September 2009
TGs Process, November Date: Authors: November 2007
TGaf Waikoloa Closing Report
January, 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [January 1394-Wireless Working Group Liaison.
September 2009 TGmb Closing Report
July 2009 TGmb Closing Report
Nov 2009 Closing Plenary Motions
TGmb Teleconferences January 2010 through March 2010
TGs Process, September Date: Author: September 2009
TGu Teleconference Motions
TGad March 2011 Closing Report
TGmb Editor Report - Nov 2009
November 2008 Closing Report
TGad May 2011 Closing Report
TGm Closing Report – May 2010
2019 March TGba Closing Report
TGmb Teleconferences January 2010 through March 2010
TGmb Teleconferences January 2010 through March 2010
Task Group AY September 2017 Closing Report
TGmb Editor Report - May 2010
TGmb Teleconferences January 2010 through March 2010
TGaf Orlando Closing Report
TGaf Nanjing Closing Report
TGaj Editor Report for LB226
Task Group G Report January 17, 2003
Liaison Report Date: Authors: September 2010
TGmd July 2017 Closing Report
TGaf San Antonio Closing Report
TGu Draft Revision Procedure
Closing Report Date: Authors: November 2007 November 2007
TGmb Teleconferences October 2009 through November 2009
TGmb Teleconferences October 2009 through November 2009
TGae Closing Report – November 2011
TGaq Closing Report Date: Authors: March 2015 March 2015
TGax November 2017 Closing Report
Presentation transcript:

Letter Ballot Scheduling Constraints November 2009 doc.: IEEE 802.11-09/1294r0 November 2009 Letter Ballot Scheduling Constraints Date: 2009-11-19 Authors: Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

November 2009 doc.: IEEE 802.11-09/1294r0 November 2009 Abstract Discussion of letter ballot scheduling constraints for letter ballots to close in January 2010. Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

Scheduling is Hard! Letter ballots should not close on major holidays November 2009 doc.: IEEE 802.11-09/1294r0 November 2009 Scheduling is Hard! Letter ballots should not close on major holidays Significant vacation activity in December Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

Recap of TGmb Letter Ballot Debate November 2009 doc.: IEEE 802.11-09/1294r0 November 2009 Recap of TGmb Letter Ballot Debate 15 days is not enough ~ 700 comment resolutions, including several global style changes 802.11w-2009 has been rolled in (~ 100 pages) Significant editorial work before beginning ballot ~ 200 comment resolutions approved at this meeting Start date of ballot is not yet clear Scheduling goals End before January 2009 interim meeting Avoid holidays and holiday vacations TG proposed motion Specified an end date so that early completion of editorial work led to more ballot time Targeted at a 4-week ballot time Motion revised at CAC to include a minimum ballot length Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks