Smart Fault Indicators

Slides:



Advertisements
Similar presentations
Mitigation of AC Induced Voltage On Buried Metallic Pipelines
Advertisements

Page 1 Outage Management Roy Hoffman 29 Jan 2001.
Digital Energy Communications GE MDS Communications Network for AMI.
PG&E Pipeline Safety Enhancement Program (PSEP)
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
The Effects of Creep on the U.C. Berkeley Football Field By Dillon Bailey & Thomas Irwin.
and Trend for Smart Grid
Spencer Murray, Sr. Telecom Eng. Distribution Automation.
Distribution Automation Plans in AEP Texas. Overview AEP Texas is deploying smart meters to roughly 1,000,000 customers The meters utilize Landis + Gyr.
Fully Implemented GIS/WMS/Outage System May 2004.
Phase Difference = Phase Difference = 0.05.
Terry Chandler Power Quality Inc, USA Power Quality Thailand LTD Sept /6/20091www.powerquality.org all rights reserve.
April 3, 2001 Washington, DC 2001 EMS Users Group.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
Dijkstra’s Algorithm. 2 Shortest-path Suppose we want to find the shortest path from node X to node Y It turns out that, in order to do this, we need.
GIS at Bangor Hydro February 5, 2004 Gary Duplisea Steve Severance Kris Dean.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Electrical Power Grid. Parts of the Grid: Generation (Power Plants) Transmission Lines Substations Distribution Lines Transformers Customers.
Many BIDOYNG units installed ~ 250 Reclose operations after faults > 80% customer supplies restored successfully.
Agency Coordination John Warren LCRA Bastrop Fire Coordination Lessons Learned.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
SWEDE 2014 Remote Monitoring of Faults – Frank Daniel (Oncor)
Oncor Electric Delivery Intelligent Grid at Oncor Electric Delivery SWEDE Conference Alan Bern – SCADA / Automation Manager May 1, 2008.
Submission Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid: Faulted Circuit Indicator]
Review of TADS Data for 2012 Voltage Class Name Metric AC Transmission Outages - Failed Protection System Equipment AC Transmission Outages - Human Error.
Curvilinear Motion  Motion of projectile  Normal and tangential components.
2011 Users Conference Nashville, TN.
Copyright © Central Lincoln PUD and SEL 2015 Communications-Capable Fault Indicators Improve Outage Response for Coastal Oregon Shamus Gamache Central.
Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Fault Current Indicator (FCI)
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
ASSAM DON BOSCO UNIVERSITY PRESENTATION ON SUMMER TRAINING MeECL, SHILLONG PRESENTED BY SONY JOHN LAWRINIANG(DC2014BTE0097) 9/2/20161 DEPARTMENT OF ELECTRICAL.
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
1 Proposed Performance Tracker for PSC Working Group 1 of 3 CategoryMetricResults Project Costs Cost to Deploy: Capital vs total Capital deployment cost.
ILLUSTRATIVE FUTURE TRANSCO STRUCTURE Field Support Services
Announcements Design Project has firm due date of Dec 4
ISO-NE Synchrophasor Related Projects
Texas Power Line-Caused Wildfire Mitigation Project
Utility Needs and Smart Grid for Major Storm Events
Bluetooth History and Uses.
Advanced Fuse-Saving Techniques
Telecoms for Smart Grids
Key terms Risk The exposure of people to a
Distributor Presentation Distribution Automation (DA) Michael Logue
MICROSECOND TIME KEEPING TO IMPROVE POWER SYSTEM CONTROL & OPERATION
Current Use of Fault Indicators
COMMUNICATION.
SMART TRANSMISSION GRID 1. Smart Transmission System Wide application of HVDC/ FACTS Wide Area Monitoring & Protection New Technologies: Substation Automation.
APIC 2009 Power and Energy Innovation Forum
APIC 2009 Power and Energy Innovation Forum
SWEDE 2011 Conference Design-Smart Grid Workshop Presented by
Created by: Jessica Richards
Project Coordinator; Create-Net
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid Overview] Date Submitted: [13.
فرایند تسهیلگری در مددکاری جامعه ای
Peter van Oirsouw (Phase to Phase)
Factors to Consider when Designing a Reliable Power Grid
2007 Hurricane Season Preparedness Briefing
Physics: It’s all around you…
Get Home Theater Installed by om
Review of Distribution Network Protection
R200 and ATS100 Presentation 01/12/2013.
PSO Reliability/System Engineering
Loading a Data Dictionary
Substation Automation IT Needs
UML State Diagrams (Ch. 29)
Presentation transcript:

Smart Fault Indicators SWEDE 2017 Smart Fault Indicators

Location of Fault Indicators Limited Access 4 Miles of Line

Distance to Fault Indicator From Substation Heavy Tree Area

The Hill Location

Tornado Alley Location

Horstmann Smart Navigators Field Material Used Other Smart Fault Indicators And Communication Devices Are Available Power Delivery DNP Smart Receiver GE MDS INET-II 900 Radios Horstmann Smart Navigators

Communication Types

Fault Seen on 12-28-2016 28-12-2016 13:44:09 FCI 3 Sn#14864 Phase C Fish Farm Event Momentary fault NORMAL 28-12-2016 13:44:09 FCI 3 Sn#14864 Phase C Fish Farm Event Momentary fault ACTIVE 28-12-2016 13:43:56 FCI 3 Sn#14872 Phase C Tornado Alley Event Momentary fault NORMAL 28-12-2016 13:44:13 FCI 3 Sn#14865 Phase C Cannedy House Event Momentary fault NORMAL 28-12-2016 13:44:03 FCI 3 Sn#14868 Phase C The Hill Event Momentary fault 28-12-2016 13:44:13 FCI 3 Sn#14865 Phase C Cannedy House Event Momentary fault ACTIVE 28-12-2016 13:44:03 FCI 3 Sn#14868 Phase C The Hill Event Momentary fault ACTIVE 28-12-2016 13:43:56 FCI 3 Sn#14872 Phase C Tornado Alley Event Momentary fault ACTIVE 28-12-2016 13:42:55 FCI 3 Sn#14872 Magnitude 720[A] Duration 37[ms] last good known 16[A] 28-12-2016 13:43:08 FCI 3 Sn#14864 Magnitude 742[A] Duration 37[ms] last good known 17[A] 28-12-2016 13:43:02 FCI 3 Sn#14868 Magnitude 753[A] Duration 37[ms] last good known 16[A] 28-12-2016 13:43:12 FCI 3 Sn#14865 Magnitude 729[A] Duration 37[ms] last good known 16[A]

Lessons Learned Inherited Project Get Key Players on board with Project Dispatch Substation Communication Operations and Construction All say who will own/support the project Make sure other programs needed for success are functional Radio path to collection point SCADA concerns/compliance issues Be prepared to compromise

Future of Fault Indicators Migrate to Outage Management System (OMS) when if becomes functional. When OMS becomes functional, look for urban/rural locations to help with fault locations along with other methods. Possible install on transmission lines.

Questions