Workshop: Equipment June 29, 2006.

Slides:



Advertisements
Similar presentations
TOTAL QUALITY MANAGEMENT (TQM) Increasing Productivity.
Advertisements

Workshop: Preventive Maintenance
At Hyderabad December 29, 2010 Kunnel Prem. ICP 27 on Insurance Frauds and ICP 28 on AML/CFT.
User Group Meeting. Agenda Welcome Group Details Introductions Topic Presentation Break (Networking) Questions and Answers Wrap Up.
Workshop: Maintenance Work Requests May 3, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
Workshop: Maintenance Work Orders May 9, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
Workshop: PM Structure April 26, Agenda  Introductions  Project Overview  Plant Maintenance Project Timeline  Future Blueprinting Sessions 
PM Bills of Material Getting the Most Out of BOMs Session 3604
Release Management in SAP David Osborne, Planning & Release Management, Canada Customs and Revenue Agency May 20, 2003 Session 2909.
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
Quality Management System
Copyright © 2003 Americas’ SAP Users’ Group QM Implementation – Tips & Tricks Chet Gandhi Consultant Session Code: 3903 Monday May 19 th, 1.50 – 2.20 pm.
1 Chapter 1 Introduction To Purchasing IDIS 424 Spring 2004.
Computers: Tools for an Information Age
7.2 System Development Life Cycle (SDLC)
Concepts of Database Management Seventh Edition
Introduction to SAP R/3.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
Blueprint Training Presentation: Maintenance Work Orders October 3, 2006.
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Workshop: Measurement Points and Permits
Enterprise Asset Management (EAM)
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Introduction SAP Manufacturing Execution (ME) Dr. Djamal Ziani King Saud University.
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT Kumar Gyanendra Mohan
PM MD03 – Bill of Materials
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Funding.
Aviation Maintenance Management
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Organizational Study of Inspectional Services City of Springfield, Massachusetts February 21, 2008.
19th January 2012 Don Wells (Hess)
Workshop: Timekeeping June 13, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials Allow.
Blueprint Training Presentation: Time Entry & Equipment October 31, 2006.
LO170 Quality Management 咨询顾问 Introduction of the QM-Modul XXX
 Tata consultancy services Production Planning WORK CENTERS.
Workshop: Work Completion Process May 16, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Faculty Load and Compensation Part 1 Bruce Schermerhorn, Human Resources Consultant Antonio Trepesowsky, Student Consultant Sungard Higher Education.
 TATA CONSULTANCY SERVICES MM - Inventory management.
Planning Engagement Kickoff
Instructor: Lloyd Hancock
Helicopter B1 and B2 Technician Continuation Training
Operations Update Report
INTRO TO SAP EWM.
1.04 Documentation References: Canadian Aviation Regulations
Project Management Processes
Industrial Assessment Center Database
SAP CS INTRODUCTION SAP Customer service is a highly integrated process module which involves a strong integration of SAP PM,SD,MM,FICO and PS. The scenarios.
1.04 Documentation References: Canadian Aviation Regulations
Workshop: Materials Use
UNIT V QUALITY SYSTEMS.
ERP Systems Lecture # 7.
Shankar Chandrasekaran
Teaching and Learning with Technology
MANAGEMENT INFORMATION SYSTEM
Office 365 Security Assessment Workshop
AGA Distribution Best Practices Program Control Room Management
RST processes Session 5 Presentation 2.
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Project Management Processes
EMS Development Course for Government Agencies
Final Design Authorization
Joint Application Development (JAD)
Measurement 2 Measurement 3 Condition Monitoring Integration with Embedded Software and On Key Hardware’s embedded software/analysis tool and specialist.
Workshop: High Level Reporting
Introduction: Real-time Hydrology Information System
Presentation transcript:

Workshop: Equipment June 29, 2006

Project Goals Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials Allow enhanced scheduling and planning for work assignments Provide work scheduling as well as management reporting tools Accommodate the use of mobile technology to reduce paperwork Accommodate the use of GIS with SAP Improve automated updates to customers about the status of work Implement a Preventive Maintenance system for buildings, areas, and equipment Utilize standard SAP functionality to collect utility usage and cost information for recharge calculations

Agenda Introduction Discussion of the Equipment Master Other Discussion

What is SAP Equipment? A piece of equipment is an individual object that is to be maintained independently. Each piece of equipment is managed independently in the system, so that you can: Manage individual data from a maintenance perspective for the object Perform individual maintenance tasks for the object Keep a record of the maintenance tasks performed for the object Collect and evaluate data over a long period of time for the object Pieces of equipment can be installed and dismantled at functional locations. The usage times for a piece of equipment at a functional location are documented over the course of time.

What is SAP Equipment? Recommendation: Create an equipment master record for a technical object if: Individual data is to be managed for the object (for example, year of construction, warranty period, usage sites) Maintenance tasks are to be performed for the object, either regular, planned or resulting from damage A record of the maintenance tasks performed for the object must be kept (for example, for insurance or compulsory annual inspection purposes) Technical data on the object is to be collected and evaluated over a long period of time The costs of maintenance tasks are to be monitored for the object Records of usage times at functional locations are required for the object

SAP Equipment Screens

SAP Equipment Screens

SAP Equipment Screens

What is Classification? Fields can be added to Equipment via Classification Each Class has one or more Characteristics An Equipment Master may belong to None, One, or Many Classes Characteristics may be ADDED to a class at any time. The added characteristics will be available to all objects in that class.

A Few Other Notes on Equipment An “Authorization” group may be established for equipment which will only allow certain groups of people to change certain equipment. Fire Alarms may be modeled as equipment. This will allow reporting of Out of Service and In Service for each fire alarm. Equipment is not required to be installed at a functional location. An example of this could be vehicles.

Topics For Next Blueprinting Session No Blueprinting Sessions are scheduled Thank you for your hard work and thoughtful input.