Routine vs. Ancillary Tasks

Slides:



Advertisements
Similar presentations
Elif İŞLEK Nurse,Health Management MSc. School of Public Health Turkish Ministry of Health STRATEGIC PLANNING ON HUMAN RESOURCES FOR HEALTH IN TURKEY ( )
Advertisements

Chapter 7 Work Design. Copyright © 2006 by Thomson Delmar Learning. ALL RIGHTS RESERVED. 2 Purpose and Overview Purpose –Provide a framework for jobs.
Engineering Diploma Level 2 Unit 7 Application of Maintenance Techniques in Engineering In this unit you will get involved with both maintenance procedures.
Standard Operating Procedures for Manufacturing & Service
Slack, Chambers and Johnston, Operations Management 5 th Edition © Nigel Slack, Stuart Chambers, and Robert Johnston 2007 Chapter 4 Process design Source:
Workload Analysis (WLA). Rationale  To develop a work plan, you must have some realistic time estimates of what you can do within the time to be planned.
Organizations, Processes and Information Systems Chapter 1.
College of Business Computer Information Systems By: Todd McDevitt.
Microsoft Excel 2003 Illustrated Complete Excel and Advanced Worksheet Management Customizing.
Prepared by: Michael Palazzo
What are they? Why do we care?
Progress Report: Working Points
SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first.
Career Research Power Point My Top Cluster  Health Science was my top cluster  My video link for this cluster is ( deos/CareerandClusterVideos/care.
 Awareness of the importance of Health and Safety;  Basic theoretical knowledge of manufacturing processes/practical work confidently and efficiently;
Sequence Analysis Alignments dot-plots scoring scheme Substitution matrices Search algorithms (BLAST)
Human Body Web quest.
Structured COBOL Programming, Stern & Stern, 9th edition
How is a manufacturing facility planned?
Teacher: Levadnaya I.V Levadnaya I.V.. Listen and repeat:
Chapter 4 Information, Management, and Decision Making.
Lecture Set 12 Sequential Files and Structures Part C – Reading and Writing Binary Files.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
Chapter 12 Evaluating Products, Processes, and Resources.
Comparison of Care Center Rates vs. Costs Source: Data from Report Prepared By Eljay, llc for the American Health Care Association MN has 7 th Highest.
Production Engineering is the combination of Manufacturing Technology and Management Science.
COMPUTER SOFTWARE Management Information Systems.
PERT/CPM By Bhupendra Ratha, Lecturer S. L. I. Sc., D.A.V.V., Indore Id:
Foundations of Technology The Systems Model
Organizations, Processes and Information Systems Chapter 1.
Personal Financial Management in a Transition 4. Tools of an integrated, Transition Budget Over Time The three types of money – in their proper sequence:
Technology in the Community
Robots vs. Humans A Manufacturing Standpoint. Work Force Economy Safety Functionality Ethics.
Understanding the Skill Requirements Effective Management: Define critical requirements of works Transfer knowledge & skills.
IE 366 Chapter 24 Time/Job. IE 366 Work Measurement ● Goal: determine standard time for a task. ● Techniques – Direct Time Study – Predetermined Time.
Topological Sort. Sorting technique over DAGs (Directed Acyclic Graphs) It creates a linear sequence (ordering) for the nodes such that: –If u has an.
HCIS 410 AID Experience Tradition /hcis410aid.com
What are they? Why do we care?
A4L1PP1 Jobs for Montana's Graduates What are they? Why do we care?
THIS IS TO EVIDENCE YOUR WORK AND GET THE BEST GRADE POSSIBLE
12.2 Permutations and Combinations
INTRODUCTION (Manufacturing Planning)
Chapter 16 Delegation in Nursing
COMPONENTS OF A COMPUTER
What are they? Why do we care?
Job Breakdown Example.
HCIS 410 Education for Service-- snaptutorial.com.
HCIS 410 ASSIST Lessons in Excellence- - hcis410assist.com.
HCIS 410 PAPER Lessons in Excellence - - hcis410paper.com.
HCIS 410 ASSIST Education for Service- -hcis410assist.com.
HCIS 410 Teaching Effectively-- snaptutorial.com.
HCIS 410 Education for Service-- tutorialrank.com
Topological Sort.
Topological Sort.
Methods-Time Measurement (MTM)
An Introduction to Control Structures
Lesson 1- Operations Management
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
Chapter 16 Delegation in Nursing
A Manufacturing Standpoint
Conversation around Process Management Lean, Pull Planning, Agile
Workflow applications
Observational Studies vs. Randomized Controlled Trials (RCT)
Quick Changeovers Definitions Analysis and Methods GEOP 4316.
Class vs Individual Evidence
Production! By Lucy,Witley and Hannah..
An Introduction to Control Structures
Presented By: Darlene Banta
Chapter 2 Manager.
List Processing (SOL: DM.10)
Presentation transcript:

Routine vs. Ancillary Tasks Consistent repetitive Random repetitive

Manufacturing Jobs Repetitive, Consistent sequence, Repetitive, Standardized Worksheet Repetitive, Random sequence, ISO documents

Standardized worksheet

Nonroutine & Ancillary Tasks Sequence is Random in nature Machine functions adjustment Preparation of tools Quality related tasks Leftover miscellaneous tasks

Bumper-molding operations

Documents used

Service Job Complex job from the health care field Tasks for a typical nurse Tasks are defined and routine by itself Repeating sequence is random

IV insertion task

Evaluate the entire process Total system efficiency vs Individual efficiency

Critical works identified