(vertical cryostat, Gersemi)

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
Refurbished Booster RF John Reid December 12, 2012.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
The SPL Short Cryo-module: Status Report V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team SPL seminar December 2012, 6-7 December 2012,
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
1 LUND March 16 th, 2016 ESS ELLIPTICAL CRYOMODULE Vacuum vessel: Ports and sealing, Manufacturing feedback LUND, March 16th, 2016 Unité mixte de recherche.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Final Design Cryogenic and mechanical configurations
How Does HNOSS Operate? Rocío Santiago Kern 20th May 2016.
Teleconf ACS – FREIA 28th March 2017
Teleconference ACS – FREIA 31th May 2017
Teleconf ACS – FREIA 13th March 2017
Mechanical and cryogenic configurations
Insulation vacuum seals M-ECCTD STATUS
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
CERN – Zanon discussions
MQXC Nb-Ti 120mm 120T/m 2m models
HL-LHC IT STRING and Series test of SC link
LBNF CAD models, Drawings and Component list
HFM Test Station Main Cryostat
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
Teleconference ACS – FREIA 18th April 2017
Teleconference ACS – FREIA 10th May 2017
Cryostat design Mechanical design: Thermal screens: Specifications:
Teleconference ACS – FREIA 17th October 2017
LARP Vertical Test Facility
S1-G cryomodule assembly status
Functional interfaces
Mathieu, Gabriel, Max, Spyros, Guillaume
Hosting Orsay Walid KAABI
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
Teleconference ACS – FREIA 31st October 2017
HO Corrector Magnets: decapole test and future plans
(vertical cryostat, Gersemi)
CERN Cryomodule Requirements for Crab Cavities
ESS RF Development at Uppsala University
Teleconference ACS – FREIA 20th February 2018
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
Cryomodule Assembly Plan
Cryomodules Challenges for PERLE
Prototype cryomodule development
The spoke CM tests at FREIA
Teleconference ACS – FREIA 19th June 2017
ESS Spoke cryomodule testing: cryogenic experience
UPPSALA UNIVERSITY_GERSEMI PROJECT
Facility for Research Instrumentation and Accelerator Development
Wien filter 2 06/05/2019 Gabriel Palacios.
Simplified Procedure Draft
Presentation transcript:

(vertical cryostat, Gersemi) FREIA Status Report Follow-up Meeting UH2015/06 (vertical cryostat, Gersemi) Rocío Santiago Kern 21st June 2016

Ongoing work at FREIA Working on the interfaces for the new TLs LN2 line modification TL from ICB to ESS CM Two (2) exhaust TLs from CM to FREIA’s recovery system Ongoing discussions with CERN regarding the magnet and the cavity inserts Preparing HNOSS for the arrival of Germaine (double spoke) with power coupler in August Testing of the 2nd RF power station 21st June 2016

Input from Magnet Workshop at CERN (1/3) No need for 80 K measurements: no need to redefine piping to accomplish this temperature in the VCS Need more openings in the top flange and in the λ-plate Missing burst disk mole shafts (x3) In general, add as many feedthroughs as possible (on both top flange and through λ-plate) 21st June 2016

Input from Magnet Workshop at CERN (2/3) The weight of the insert is very important The crane will be upgraded to max. 7 ton The magnet weight is 5.2 ton Thus the insert containing all equipment (current leads, connectors, valves, etc) must be lower than 1.8 ton The flatness of the round collar where the λ-plate sits and the λ-plate itself (0.1 mm) is an issue For the round collar first weld and then machine The feedthroughs are also an issue and grease must not be used 21st June 2016

Input from Magnet Workshop at CERN (3/3) Because of necessary HV tests for the magnet: All equipment in contact with magnet and ground must be able to withstand 500V, but have to be tested at 3 kV for at least one minute Proper HV insulation is needed It must be possible to remove all connections from the top of the insert All subsystems (VB, VCS, heater,…) must be properly grounded 21st June 2016

Some Pictures from SM18 (1/2) 21st June 2016

Some Pictures from SM18 (2/2) 21st June 2016

Q&A 21st June 2016