NRRA FLEX TEAM MIX REJUVENATOR TAP MEETING

Slides:



Advertisements
Similar presentations
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
Advertisements

Recycled Asphalt Program & Environmental Stewardship Program (Post Consumer Content) Robert C. Rea Nebraska Department of Roads WASHTO – Omaha, Nebraska.
Office of Infrastructure R&D U.S. Department of Transportation Federal Highway Administration High Reclaimed Asphalt Pavement Use in Asphalt Mixtures Canadian.
Asphalt Issues AASHTO SCOC Virginia Beach, Va. By Victor (Lee) Gallivan FHWA August 2, 2011.
Public Works Greg Chock Operations Manager Harlan Hanson Road & Bridge Engineer
Fiscal Monitoring Fiscal Monitoring. Agenda I. Fiscal Monitoring I. Fiscal Monitoring II. Follow-up II. Follow-up III. Correction Action Plan III. Correction.
Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer.
Overview of District Self Study. Objectives To understand specific aspects of the District Self Study: A.Purpose and use B.Recommended Practices C.Content:
Overview of District Self Study. Objectives To understand specific aspects of the District Self Study: A.Purpose and use B.Recommended Practices C.Content:
Recycling Tear Off Shingles in Bituminous Pavement Ramsey County 2007 Lower Afton Road Trail Project By Jerry Auge, Jr. – Project Manager
Mathematics Curriculum Proposal Transitioning to Iowa Core.
Warm Mix for a Cold Climate Colorado DOT’s 2007 WMA Project.
Reclaimed Asphalt Pavements “RAP” Pete Coffman. RAP ◊Uses ◊Mix Methods ◊Cost Savings ◊Concerns ◊Case Studies ◊Uses ◊Mix Methods ◊Cost Savings ◊Concerns.
Warm Mix for a Cold Climate Update on Colorado DOT’s 2007 WMA Project on I Rocky Mountain Asphalt Conference and Equipment Show.
Recycling shingles since 1996 Presentation at the March 16, 2005 CONEXPO-CON/AGG By Dusty Ordorff Bituminous Roadways, Inc.
1 Teacher tube- “Learning to Change and Changing to Learn” “Death of education, but dawn of learning.”
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
2 3 WMA Technical Working Group (WMA TWG) Formed in 2005 Purpose: Promote Technology Transfer Facilitate Product Approval Methods Encourage Research.
Research Findings from the NCAT Test Track APAI Winter Conference Indianapolis, December 14, 2010.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
Session #3 Asphalt 103- Materials: Basics of RAP, Usage and Specifications.
The Hassan / Omann Shingles Recycling Demonstration Project A Presentation by Bill Boettner At the Dakota County Shingles Recycling Workshop On Tuesday,
MnDOT Road Research Update Maureen Jensen Benjamin Worel TRB January 17, 2013.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Paving the way for over 60 years Presentation at the January 10, 2007 NCAUPG Technical Conference By Dusty Ordorff Bituminous Roadways, Inc.
LLP HMA Reclaimed Asphalt Pavement ( RAP) Pre-Bid Meeting District 4 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement Division.
CMRA WEBINAR ON NEW SPECIFICATIONS AND IMPLEMENTATION JUNE 15 TH, 2010 Recycled Asphalt Shingles in HMA Implementation: A Perspective from Wisconsin.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
Benjamin Worel Minnesota Department of Transportation.
Using Nominal Group Technique for Data Gathering, Prioritizing, and Decision Making Session 562 American Evaluation Association Conference 2012 October.
Slide 1 A Practical Guide to Issuing a Request for Proposals Notes.
1. WELCOME Project Management Cycle (P.M.C.) What is a project? : What is project management?: Project management life cycle : Phase 1 st : Phase 2 nd.
The CED’s & DED’s role in the Tenure & Promotion of Agents
Alabama Asphalt Pavement Association
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
Asphalt Pavement Training Conference “HMA Mix Designs on the QPL”
Indiana Experience with Water Injected Foaming Device Rick Flint
Disk-Shape Compact Tension (DCT) of HMA Samples
Office of Materials and Road Research
Evaluation of Cracking Resistance and Durability of 100% Reclaimed Asphalt Pavement Mixtures Hesham Ali, PhD, PE. Mojtaba M. Afzali.
Guide for Determining Time Requirements for Traffic Signal Preemption at Highway-Rail Grade Crossings: Revisions to the TxDOT Worksheet Kevin Balke, PhD,
Presenters: Sumon Roy1 and Badrul Ahsan1
Alabama Asphalt Pavement Association
Scholarship Assembly.
Performance Monitoring and Development of Common Data Platforms
2018 Pavement Workshop May 23-24, 2018
2018 Pavement Workshop May 23-24, 2018
2018 Pavement Workshop May 23-24, 2018
2018 Pavement Workshop May 23-24, 2018
Performance Assessment of 100% Recycled Hot Mix Asphalt
Electronic Review Process
MnROAD/NCAT Partnership
2018 Surveys and Evaluations
Illinois’ Joint Research Adventure
Best Practices on the Use of RAS
Dr. Randy West, P.E. Director / Research Professor
ApprenticeshipNC Regional Collaboration and Expansion Project
Scan & Deliver Scan & Deliver is available to University card holders. You need to login using SSO to place a request.
NRRA Mix Rejuvenator Field Test Sections
HOW TO USE THE NEW GLOBAL GRANT REPORT
Recycling Tear-Off Shingles: Shingles to Streets
NRRA Pavement Workshop 2019
2019 Pavement Workshop May 21-23, 2019
NRRA Pavement Workshop 2019
NCHRP Project Update: A Calibrated and Validated National Performance-Related Specification for Emulsified Asphalt Binder Greg Harder AASHTO TSP•2.
Pavement Preservation Pooled Fund (Preservation Group – PG1 and PG2)
Next New exploration of an old idea
Engagement Planning - Communications
NRRA Mix Rejuvenator Field Sections
Asphalt Rubber Chip Seals
Presentation transcript:

NRRA FLEX TEAM MIX REJUVENATOR TAP MEETING Michael Vrtis, Ph.D. | Research Project Engineer 6/17/2019 mndot.gov

Agenda Synthesis Field Sections Status / Schedule Materials Costs Research Contract Actions items RED= NOTES TAKEN DURING MEETING 7/3/2019 mndot.gov

Synthesis This synthesis will summarize the experiences that each NRRA member State has had regarding asphalt mixture rejuvenators. It is intended to share implementation projects to facilitate transfer of knowledge and provide guidance to NRRA Mix Rejuvenator Test Sections (Phase II)” Introduce Sheue and Tom Wood from WSB What information would be useful for producers? What information would be useful from producers? Review questions at end of call if time permits- NO TIME GRANT FROM SUPERIOR BOWEN SHARED PROJECTS SURVEY WILL BE SENT TO ALL TAP MEMBERS WSB WILL CONTACT PRODUCER PARTICIPANTS INDIVIDUALLY 7/3/2019 mndot.gov

Meeting Participants Brian Hill Dan Oesch Bob Kluttz Hassan Tabatabaee MnDOT Michael Vrtis Ben Worel Jerry Geib WSB Sheue Lee Tom Wood NCAT Nam Tran Nathan Moore Randy West Brian Hill Dan Oesch Bob Kluttz Hassan Tabatabaee Grant Wollenhaupt Jason Bausano Steve Bly Gerry Reinke Raghubar Shrestha 7/3/2019 mndot.gov

Synthesis State member to send survey to??? Michigan- Kevin Kennedy ND- Amy Iowa – Chris 7/3/2019 mndot.gov

Field Sections Trunk Highway 6 13.4 miles Emily to Outing, MN 2” mill (4.5”-6.0” existing HMA) 2” lift – HMA 12.5 max 1.5” lift - HMA 9.5 max High RAP / Rejuvenators in this lift 7/3/2019 mndot.gov

Status / Schedule Construction- mid to end of August High RAP Mix Design submitted 2 weeks prior to construction Contractor will try to get it to us earlier Week of July 15- Contractor should have aggregate stockpiles Samples can be obtained in July and sent to each producer for dosage testing. Mix will have to be built from components shipped prior to receiving final mix design from contractor. 7/3/2019 mndot.gov

Materials - RAP RAP at MnDOT 75 Cores taken on 6/13/19 throughout project ≈PG 75.3 – 24.8 (PG 70 – 22) 7/3/2019 mndot.gov

Materials - Aggregate Contractor using new quarry Equipment into quarry week of 7/8 Agg stockpiles ready week of 7/15 Can be obtained and shipped week of 7/22 Received by end of July (i.e., ready for dosage testing once mix design is obtained) 500 lbs of “approximate aggregate” at MnDOT now 7/3/2019 mndot.gov

Materials – Virgin Binder MnDOT obtained 6/26/19. Received 5 1-gallon cans instead of 5 5-gallon cans Submitted for continuous PG on 6/27/19 Can request more from refinery 7/3/2019 mndot.gov

Materials – Rejuvenator / Recycling Agent Rejuvenator will be supplied by the producer to the contractor for in-line blending at the HMA plant Ship to contractor beginning of August. More details later Dosage State agencies members will be voting on: A- Dosage based on mfg. recommendation only B- Dosage to reach target (PG) What is target? (xx-34)? Each producer will be responsible for providing the required dosage for their product to be used in the high RAP mix design. Materials will be provided for testing Dosage is determined by producer. The project is not dictating a target PG grade? 7/3/2019 mndot.gov

LTPP Bind Target PG xx-34 even though MnDOT would use 58-28 For this job 7/3/2019 mndot.gov

Costs Additional cost to contractor to include field sections = $65,000 (construction delay + pump + mix design) Paid directly to Anderson Brothers 7 Confirmed participants = $9,285 per participant 4 unconfirmed participants = $5,910 per participant STATE member vote needed for this Is this project going to allow terminally blended / Polymer Binder sections? Tanker will be needed Contractor open to switching tankers for polymer binders 7/3/2019 mndot.gov

Research Contract Construction summary and experiment design – MnDOT/NRRA ≈$100,000 available for Long-term Evaluation and Reporting Performance testing? Aging? Round Robin similar to NRRA overlays? Annual binder testing to determine stability over time MnDOT will monitor IRI and cracking Likely need RFP 7/3/2019 mndot.gov

Action Items MnDOT Rejuvenator producers All TAP Members Compile list of material needed and addresses for dosage testing Change order to contract Send out items to state agency members to vote Check TH 6 construction history for original binder type Rejuvenator producers Confirm participation Submit request for material needed for dosage All TAP Members Complete survey!!! Ideas for project RFP 7/3/2019 mndot.gov

Other items High RAP mix design needs to use some rejuvenator – Gerry Reinke MnDOT will look at grouping rejuvenators on base/source type Blindly select rejuvenator to be used in design Rejuvenator cost information and economic analysis Needs to be further discussed if cost info will be shared and compared for these sections Grant W. and Gerry R. stated that costs/economics should be reported 7/3/2019 mndot.gov

Thank you again! Michael Vrtis, Ph.D. Michael.Vrtis@state.mn.us 651-366-5502 7/3/2019 mndot.gov