The Academy of Electrical Contracting

Slides:



Advertisements
Similar presentations
ThinkEnergyGroup Energy.Personnel.Fast!. Weve engineered a professional approach to energy staffing. ThinkEnergyGroup.
Advertisements

The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex.
Models. The Future of Building Services Model Content.
Microcontroller Position Sensors 1-3 Temp Sensor M Increment Motors Manual Override Power Motor Controller System Diagram.
Given Connections Solution
BIM & 3D House Printing 3D Printing of building can reduce the construction costs and the construction time. 3D Printing of buildings will allow more customization.
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
Chapter 1 Construction Graphics: An Overview. Key Terms American Institute of Architects (AIA) (pg. 4) Architect/engineer (AE) (pg. 5) Computer-aided.
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
What is a computer chip?  Definition? A circuit in which all or some of the circuit elements are inseparably associated and electrically interconnected.
Imraan Mahomed AECOM Developing today’s talent into tomorrow’s leaders CESA Annual Conference 11 November 2014.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Integrated Projects BIMLEAN Collaborative Agreements I. Business case for Visual Legal Collaboration.
Building an Effective Team Optimizing Team Performance Cohort 6 Webinar 1.
ICIS Presentation 2012  Rapid fire  Change in STABU  Radboud Baayen  STABU Foundation  Netherlands.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Algebra 2 4.2, 4.3a Machhapuchhare SAT Question: When it is 7:00 am in Seattle, it is 10:00 am in Philadelphia. A plane is scheduled to leave Philadelphia.
Locally Administered Federal-Aid Project Initiation Workshop Project Scoping John Condon & Mike Barry November 14,
Changes are Occurring Evolutionary or Disruptive? Pat Kiley Kiley Advisors LLC March 26, 2015.
Overview of Building Information Modeling What does it mean for Civil Engineering?
Operation & Maintenance Construction & Logistics 4D/5D Construction Fabrication Documentation Analysis Detail Design Conceptual Design Programming Renovation.

© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part I.
JOB ORDER CONTRACTING (JOC) Things to Consider When Making the Choice to Utilize JOC Services.
New Jersey Turnpike Authority November 19, 2009 New Jersey Turnpike Interchange 6 to 9 Widening Program Presented by Lisa M. Kenney, P.E. 1.
The Fatality Experience in the United States The Chemical Processing Industry.
Character Costumes What do the clothes say about these people?
Virtual Building Solutions Better Buildings. Better Built. BIM Marketing.
Conflict Resolution January Health Info prepared by Public Health January 2016.
Home Repair and Building Contract We undertake New House Construction and Various Repairing works of your Dream Home. New House building Contract House.
CBC activity - collaborative contracts Estimation of possible savings by the end of Energy £320 million Fleet £110 million Office solutions.
NATSPEC BIM Activities ICIS Congress 15 March 2016 Auckland, New Zealand.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
Buildability™ for Your Homes Your Logo Here. Problem: Framing mistakes hurt your bottom line. So do “red tags”, delays, waste, and roof, floor or wall.
AAE 3521 AAE 352 Lecture 08 Matrix methods - Part 1 Matrix methods for structural analysis Reading Chapter 4.1 through 4.5.
1Archer Mechanical. Archer Mechanical is dedicated to providing solutions that save you both time and money. Specializing in sustainable mechanical and.
Human features are those things created by man.
advices for advancing the productivity of the construction industry:
Old Dominion Electric Cooperative Meter Estimation Project
Area of a Triangle These two triangles are identical.
Legal requirements and contractual duties
What does it mean when a drawing is not to scale?
Load Balancing: List Scheduling
BACK SOLUTION:
Academy Paper.
2012 סיכום מפגש 2 שלב המשכי תהליך חזוני-אסטרטגי של המועצה העליונה של הפיזיותרפיה בישראל.
An Overview of the Payment Process
Troy School District Bond Program – Series 1 Construction Update
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
Truckload Booking Application
آشنایی با توربین انبساطی و کاربرد آن‌ در نیروگاه‌های تولید برق
PCC Update 08/26/09 Planning Phase
التدريب الرياضى إعداد الدكتور طارق صلاح.
How to Prepare an Insoluble Salt (precipitate) by Precipitation
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
שלבי יסוד ומאפיינים של תהליך ייצור ביוטכנולוגי
Breakout Session Summary Construction
Coppin State University
DBIA Manual of Practice

Compound Area Compound area is where a shape can be made up of other shapes. The area of a compound shape can be found by calculating the area of the shapes.
Systems of Inequalities
Load Balancing: List Scheduling
On-Site Facilities for Pre-production deployment
Online Pogo Game Customer Service
Pogo Game Customer Care Helpline Number

Call Pogo Contact Phone Number and Enjoy Pogo Game
Presentation transcript:

The Academy of Electrical Contracting Paper Presented by Fellow Franklin P. Holleran (‘15)

Philadelphia Skyline

Construction Mismanagement!

CM Pre Construction Schedule

Construction in Philadelphia https://media.phillyvoice.com/media/images/NEWphillybydrone-comcast-technolog.0d1df232.fill-735x490.jpg

The Contract

The Conflict

The Solution – Accurate Schedule

The Solution Man Power Loading

The Solution – BIM

The Solution Pre Fabrication

The Solution – Supervision

The Solution – Accountability

The Solution – Working Together