Undulator Alignment Plan

Slides:



Advertisements
Similar presentations
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Advertisements

Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
LCLS LCLS-II Survey & Alignment
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
Robert Ruland MMF Bench/CMM Procurement Plan October 14, 2004 MMF Review 1 MMF Bench / CMM Procurement Plan Robert Ruland Procurement.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Alignment Strategy for Light Source Facilities LCLS Case Catherine LeCocq SLAC 03/31/08.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon,
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
Jan 2016 Solar Lunar Data.
on behalf of the CLIC active pre-alignment team
Workshop on Tau-Charm at High Luminosity
Magnetic Measurements For The LCLS Undulator System
LCLS Undulator Fiducialization
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
Average Monthly Temperature and Rainfall
Undulator System Installation
LTU/Undulator Installation Status
Meeting of the LCLS Facilities Advisory Committee
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Text for section 1 1 Text for section 2 2 Text for section 3 3
LCLS Undulator System Status and Schedule
Text for section 1 1 Text for section 2 2 Text for section 3 3
LCLS-II Cryoplant Controls Workshop.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Shutdown Planning & Installation Schedule
Text for section 1 1 Text for section 2 2 Text for section 3 3
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LTU/Undulator Installation Status
Text for section 1 1 Text for section 2 2 Text for section 3 3
LCLS Undulator System Status and Schedule
Text for section 1 1 Text for section 2 2 Text for section 3 3
Installation Status & Operational Readiness Process
Undulator Integration Test Status
Undulator Assembly and Installation Planning
LCLS e- Beams System Overview
Physics Requirements for Conventional Facilities
Alignment Diagnostic System Status
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Globus-M2 will be constructed by the end of 2015
DOE Status Meeting of the LCLS Project
LCLS Undulator Magnetic Measurements
TEL031 ODL Analytics Main Activities
Presentation transcript:

Undulator Alignment Plan LCLS Project Lehman Review February 7 - 9, 2006 Catherine LeCocq SLAC Alignment Engineering Group

Planned Alignment Activities Global Alignment Monitoring Systems Magnet Measurements Facility Undulator Hall Tunnel Alignment

Agenda relative to Metrology Internal LCLS Undulator Alignment and Motion Review http://ssrl.slac.stanford.edu/lcls/undulator/meetings/2005-10-20_intl_align_review/ SLAC, October 20 & 21, 2005 Committee Virgil Bocean (FNAL) Gordon Bowden (SLAC) Steve Marks (LBNL) Will Oren, Chair (JLAB) Agenda relative to Metrology Component fiducialization Two-tier alignment Monitoring systems Published report http://www-ssrl.slac.stanford.edu/lcls/undulator/meetings/2005-10-20_intl_align_review/lcls_alignment_summary_report-final.pdf

Girder Alignment Sequence: Items to work on: Fiducialization of all components Assembly on girder and pre-alignment: Combination MMF & other on-site locations Final alignment on girder: In MMF with CMM & local set-ups Items to work on: Handling Storage

UN36_00060 = CMM Procurement Leitz Reference Model 45129 CMM manufactured by Brown & Sharpe in Wetzlar (Germany) is on order. It should be shipped after in-situ special tuning currently scheduled for the week of March 6th. It is then expected to arrive at SLAC end of April. CMM weight capacity is 3000 kg. CMM measuring range is 0.9 x 1.5 x 4.5 meters. CMM resolution is 0.1 microns or 0.000004 inches. CMM spatial accuracy is a formula based on the length L (in mm): Original: 2.0 microns + L/350 Special calibration for undulator segment: 1.5 microns + L/500.

Tolerance for Girder Alignment Component Alignment on Girder RMS Value Quadrupole in both horizontal directions 125 µm Quadrupole in vertical direction 60 µm BFW in both horizontal directions 100 µm BFW in vertical direction 55 µm

Production Measurements MMF Schedule Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Tuned March 6 Shipped March 20 @ SLAC April 24 Commissioned May 15 CMM June 1 Completed April 15 BENCH MMF Ready To Measure July 28, 2006 MMF Const Done (Feb 17) MMF BO (Mar 6) 1st Article @ SLAC (Jun 2) May 1 Ready to Measure July 28 Production Measurements August 29, 2006

Tunnel Alignment Sequence: Items to work on: Establish survey network in empty UH. Mark bolt-hole floor positions for pedestals. Align pedestals. Survey girder components. Final alignment & integration of monitoring systems. Items to work on: Finalize penetrations & other access. Analyze mechanical requirements for cam movers. Make a local controller for cam movers. Allow schedule for repeated surveys due to tunnel movements.

Undulator Hall Tunnel Location FEH Service Bldg FEH X-Ray Tunnel CLOC NEH FEE Beam Dump Undulator Hall BTH BSY LINAC

(with removable spherical target) Survey Monuments Extract from ESD 1.4-113 Undulator Tunnel Survey Monument Positions B. Fuss wall monuments (with removable spherical target) floor monument 6’ 1‘ stay-clear

Undulator Hall Network 1600 1650 1700 1750 1800 1850 1900 1950 2000 2050 2100 2150 2200 2250 UH Tunnel Start STA 1672.09 ft 509.653 m SLOPE UH Tunnel West Side Thermal Barrier STA 2237.33 ft 681.939 m Undulator Hall Tunnel BTH Beam Dump 24” Vertical Penetration (approx. position) sD = 30 μm sh = 30 μm / D sv =50 μm /D sdh = 50 μm sz = 22 μm sx = 47 μm sy =46 μm

Tolerance for Tunnel Alignment Girder Alignment in Tunnel RMS Value Quadrupole Deviation from Straight Line 100 µm Quadrupole in longitudinal direction 500 µm Undulator Segment Yaw 240 µrad Undulator Segment Pitch 80 µrad Undulator Segment Roll 1000 µrad

Undulator Hall Schedule BO of UH in May 2007 Installation and survey of network: May through June 2007 Mark pedestal bolt locations and align pedestals: June through August 2007 Girders installed and aligned: September 2007 to June 2008 Final alignment and mapping complete by July 18, 2008

Current Preparation MMF Set-Up HLS and WPM Evaluation Network Construction monuments Tunnel penetrations Assembly and Installation Support Integration of monitoring systems Evaluation and testing of portable CMM arm Pedestal design

GPS Baseline Network

LCLS Construction Network LCLSR002 LCLSR001 LCLS001 SLAC NGS23 LCLS003 LCLS004 BMSA LCLS002 http://www-group.slac.stanford.edu/met/Align/GPS/GPS_Main.html

Documentation Overall Plan Coordinate Systems Monumentation PRD 1.1-003 – Conventional Alignment System Requirements Coordinate Systems SLAC-TN-05-021 - LCLS Undulator Coordinate System NAD83-SPCS-CA Lambert Zone 3, see AEG web page: http://www-group.slac.stanford.edu/met/Align/LCLS/LCLS.html ESD 1.9-106 - Height Systems for LCLS Construction Monumentation ESD 1.9-107 - LCLS Alignment Construction Requirements ESD 1.4-113 - Undulator Tunnel Survey Monument Positions Specialized Alignment Systems ESD 1.4-105 – Hydrostatic Leveling System Specifications