Fluid samples from gas condensate wells are needed for two main reasons: To provide PVT data for developing a fluid model such as an EOS and/or black-oil.

Slides:



Advertisements
Similar presentations
MDT JOB PLANNING AND INTERPRETATION
Advertisements

Use of Steam Tables Saturated Vapor or Liquid
PVT Short Course for Cairo University SPE Student Chapter Ahmed Muaz Khalda Petroleum Company April 23, 2011.
Flow Behavior of Gas-Condensate Wells - the impact of composition
R ETROGRADE G AS -C ONDENSATE R ESERVOIRS. F ORMING DEW DROPS A gas condensate is a single-phase fluid at original reservoir conditions. It consists predominantly.
Introduction to Petroleum Production Engineering
Chapter 10 – Properties of Black Oils - Reservoir Fluid Studies
Petroleum Engineering Presented by : Mostafa Khojamli November
Partial Evaporation Example 1/31/2007. Shell and Tube Heat Exchanger.
Gas Condensate Reservoirs: Sampling, Characterization and Optimization SPE Distinguished Lecture Series F. Brent Thomas.
IADC Application Category Category A – Managed Pressure Drilling (MPD) Drilling with returns to surface using equivalent mud weight that is maintained.
Gas condensate properties. The classical categories of hydrocarbons  Gases  Gas condensates  Volatile oils  Black oils  Heavy oils  Oil sand oils.
Introduction to Water – Chapter 24. Pretest Water: 4 Primary Sections The Hydrologic Cycle (Water Cycle) The Hydrologic Cycle (Water Cycle) Glaciers.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 2432 Artificial Lift Green Book Chapter 1 Planning an Artificial Lift Program.
Fluid Sampling and Hydrates. Group Members:  Mohammad Afaq Akbar(23)  Nisar Ali(39)  Saif Ur Rehman(43)  Shahnawaz(46)  Uzair Ahmed Khan(49)
Day 4 – Part 1: Lumping and De-lumping
Day1 – Part2 PVT measurements Fluid sampling methods
RESERVOIR ENGINEERING
Drilling and Production
PNEUMATICS Chapter 4 Primary Air Treatment
NATURAL GAS LIQUIDS RECOVERY
Gas Condensate PVT – What’s Really Important and Why?
Saudi Aramco – Course in Advanced Fluid PVT Behavior
Quality Control Checks on Reservoir Fluid Samples
Oil-Based Mud Contamination in Gas-Condensate Samples
Gas Properties & PVT Tests
Solubility -the ability of one substance to dissolve in another
Tasks Collecting samples. Which PVT lab tests to use.
Equations of State for Gas Condensates
Understanding Hydrocarbon Fluid Properties and Behavior
QC checks on composition
Gas Condensate PVT A worked example to estimate
Gas Condensate Rate Equation
ICE 101 REFRIGERATION BASICS
Gas Condensate PVT A worked example to estimate
Gas Condensate Rate Equation
Accurate fluid samples are needed to define fluids in place, especially condensate volume. Separator samples should almost always be used for gas condensate.
Ground Water Revised 12/16/09.
Classification of Matter (1.6)
Gas Condensate PVT C7+ fraction in CVD Liquid saturation in CVD
CCE and CVD results The usual PVT measurements on gas condensates are
Gas Condensate Rate Equation ”Pseudopressure Integral”
Fluid Saturations Introduction
Gas Condensate Rate Equation ”Pseudopressure Integral”
Global Component Lumping for EOS Calculations
Pressure drawdown to a gas condensate well
Ground Water Revised 12/16/09.
Gas Condensate engineering  Dry Gas engineering except:
Gas Condensate engineering  Dry Gas engineering except:
Modeling Well Performance in Simulation
Gas Condensate Blockage
SPE Compositional Grading Theory and Practice
Warm-Up What is a solution? Very small particles Evenly distributed
CCE and CVD results The usual PVT measurements on gas condensates are
Use Quality-Controlled PVT data to set up an EoS model of the reservoir. Ensure that gas Z-factors and C7+ content of the gas are matched accurately.
Gas Condensate Blockage
Psychrometric Properties of Moist Air
Gas Condensate PVT C7+ fraction in CVD Liquid saturation in CVD
BOP FLUID FLUSHING SIMON McMANUS WM CANNING LTD.
Gas Condensate Blockage
Gas Condensate Reservoirs
Condensate blockage is the build-up of liquid around the wellbore, reducing the effective gas permeability and lowering well deliverability.  Condensate.
Liquid saturation in CVD
Use Quality-Controlled PVT data to set up an EoS model of the reservoir. Ensure that gas Z-factors and C7+ content of the gas are matched accurately.
Gas Condensate Rate Equation
Gas Condensate PVT A worked example to estimate
QC checks on composition
Quality Control Checks on Reservoir Fluid Samples
Liquid saturation in CVD
QC checks on composition
Presentation transcript:

Fluid samples from gas condensate wells are needed for two main reasons: To provide PVT data for developing a fluid model such as an EOS and/or black-oil tables (“reservoir representative” samples). To provide compositional data to define fluids in place, especially surface condensate volume (“in-situ reservoir representative” samples). Separator samples should almost always be the primary source of samples for gas condensate reservoirs. Openhole samples (such as MDT) can also be used without complication for wells drilled with water-based muds. Ideally, samples should be taken while the bottom hole flowing pressure (Pwf) is above the dew point, but this may not be possible in saturated and/or low-permeability reservoirs. It is still possible to obtain representative samples when (Pwf) is below the dew point. The flow rate should be only as high as needed to lift liquid in the tubing, and large rate changes before sampling should be avoided, particularly rate decreases. When the flow rate is reduced prior to sampling, the condensate bank ‘unloads’ and gives a sample where the OGR is too high.  For wells drills with oil-based mud (OBM), it is often possible to back-calculate the reservoir fluid composition by removing OBM components, but this is not straightforward and the contaminated sample may give very different results in PVT experiments. A series of consistency checks can be used as a Quality Control on reservoir fluid compositions before they are used to model reservoir performance.