Thursday 9.9 07.00 Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.

Slides:



Advertisements
Similar presentations
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
Advertisements

● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday 21 March 2012.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Summary Friday h38: Ramp down and pre-cycle.
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
Monday 11/07: Recovery Plenty of accesses.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Tuesday 22nd January - morning
Machine availability reaching well over 80%
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
LHC commissioning Week 38
Bernhard Holzer, Joerg Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Wed :40 Lost S78 - QPS controller.
Saturday 2/4/ :00-09:00 Problems with SPS:
Saturday 4.12 Beam in the SPS at 09:30 Beam in the LHC at 10:00
Week 35 – Technical Stop and Restart
Monday Morning – recovery from cryo.
Monday February 28th 8h00: Injection
Week 36 Machine coordinators R.Assmann, R.Bailey
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
(on behalf of the LHC team)
Sunday/Monday & :30 Stable beams. Fill #1851.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
Friday 25 bunch fill dumped just before (BLM in 5)
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Programme for Friday 9 July
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Monday :15 fill 3523 dumped by BPMs IP6
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Summary Tuesday h23: Machine closed. Precycle started.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Injection Studies: 50 ns ABT/BTP.
RAMP FOR COLLIMATOR SETUP
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Thursday 9.9 07.00 Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting up started Then problem with cryogenics in S78 (at 10.30) Temperature sensor on RQTL9.R7B1 – “not easy to fix” during JG Proposed to overcool the lead, mask the fault temperature sensor and rely on the voltage measurements from the QPS Pre-cycle for RQTL9.R7B1 finished OK QPS experts looked at the voltage data and gave us the OK to proceed with operation in these conditions Then problem of QPS on RB.A12 (at 14.30) could work at injection needed access later (done at 22.00) Decided to postpone B1 capture/energy matching until later 8:30 meeting

Thursday 9.9 13.00 Continuation commissioning of injection of bunch trains Started again onto TEDs while machine not available B1 12b in 3x 4b trains to end of TI2 - losses and trajectory look OK B2 12b in 3x 4b trains....trajectory still slightly different and losses reflect this Injected into LHC around 15.30 Centering transfer line collimators B2 Centering transfer line collimators B1 uncaptured beam losses seen minor hinderance No evidence of uncaptured beam B2 Finished around 20.30 Then tried running full coll sequence A few surprises ! (understood but …) Earlier collimator function work 8:30 meeting

***SUMMARY of INJECTION STUDIES*** Took 12 nominal bunches to the downstream TEDs in both TI2 and TI8, in 3x 4b trains. Looks fine from trajectory; losses also reasonable. Steering of TI8 to optimise injection oscillations. Used one corrector at the end of the line for a nice correction - defined a new golden reference orbit for TI8. Measured center of remaining 6 TCDIs Found changes of up to 0.5 sigma, looks like with good trajectory correction we can hope for this kind of stability. The following collimators were centered today (all downstream of the TEDs):                 adjustment [um] TCDIH.29465     +200 TCDIH.88121     -250 TCDIV.29234     -150 TCDIV.29509     0 TCDIV.88123     -240 TCDIV.87804     -255 Trimmed all new settings in and adjusted thresholds, drove all the settings and thresholds through the sequencer Tried to make one full filling sequence with the new settings - ran out of time. Ready to start the protection validation tests tomorrow. 8:30 meeting

Thursday 9.9 Golden orbit tidied up offline by Jorg 22.00 Access for QPS in point 2 Test ramp of collimator functions LHC ready around 00.30 but then problem in SPS 02.00 Beam injected Ramp with collimators (with movement interlocks masked) (!) Xing angles to 100/110/100/100 Squeeze 04.00 Beam lost at 3.5m - power convertor RCBYVS4.L1B1 tripped Access from 06.00 for power convertor in S81 07.00 Access finished. Restarting 8:30 meeting

Friday 10.9 M Continuation commissioning of injection of bunch trains A First look at beam-beam (if we get trains of 12 in) N IR aperture To fit in before we ramp nominal bunch (Saturday ?) Capture / energy matching RF longitudinal blowup. V reduction at injection. 8:30 meeting