Dark Current Experiment Preliminary Design Review

Slides:



Advertisements
Similar presentations
16 January 2003STScI TIPS1 JWST's Near-Infrared Detectors: Ultra-Low Background Operation and Testing Bernie Rauscher, Don Figer, Mike Regan, Sito Balleza,
Advertisements

Discussion of CalWebb contents M. Robberto (facilitator)
Astronomical Detectors
European Southern Observatory
JWST Radiation Environment 1March 13, 2003 Reference pixels and readout modes: What we have learned thus far Don Figer, Bernie Rauscher, Mike Regan March.
CCDs. CCDs—the good (+)  Linear response  photometry is “simple” +High efficiency, compared to other detectors +Sensitive to many wavelengths +2-D arrays.
RIT Course Number Lecture Noise
Detectors for the JWST Near Infrared Spectrograph (NIRSpec) B.J. Rauscher 1, P. Strada 2, M.W. Regan 3, D.F. Figer 3, P. Jakobsen 2, S.H. Moseley 1, T.
1 Ultra low background characterization of Rockwell Scientific MBE HgCdTe arrays Donald N. B. Hall, University of Hawaii, Institute for Astronomy, Honolulu,
14 January 2003Special LASP Seminar at GSFC1 JWST's Near-Infrared Detectors: Ultra-Low Background Operation and Testing Bernard J. Rauscher Space Telescope.
1D or 2D array of photosensors can record optical images projected onto it by lens system. Individual photosensor in an imaging array is called pixel.
AST3 detector properties
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
Super-hot pixels, hot pixels and DSNU on Hawaii-2RG detector
Understanding Persistence: A 3D Trap Map of an H2RG Imaging Sensor
CCD Detectors CCD=“charge coupled device” Readout method:
NIRCam DHAS and Array Characterization
Digital Imaging. Digital image - definition Image = “a two-dimensional function, f(x,y), where x and y are spatial coordinates, and the amplitude of f.
Recent Performance Improvements, Calibration Techniques and Mitigation Strategies for Large-format HgCdTe Arrays G. Finger, R. Dorn, S. Eschbaumer, D.
Observational Astrophysics I
SNAP Collaboration meeting / Paris 10/20071 SPECTROMETER DETECTORS From science requirements to data storage.
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
Glow Experiment Outline Brandon Hanold. Outline 1.Glow Description 2.Experiment Design 3.Acquisition Loop Variables and Keywords 4.Reduction Results 5.Reduction.
-1-CERN (11/24/2010)P. Valerio Noise performances of MAPS and Hybrid Detector technology Pierpaolo Valerio.
February 21, 2002TIPS meeting1 "Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." TIPS.
CCD Image Processing: Issues & Solutions. CCDs: noise sources dark current –signal from unexposed CCD read noise –uncertainty in counting electrons in.
What is thermal noise? Thermal noise in the resistance of the signal source is the fundamental limit on achievable signal sensitivity is unavoidable, and.
Performance of 1600-pixel MPPC for the GLD Calorimeter Readout Jan. 30(Tue.) Korea-Japan Joint Shinshu Univ. Takashi Maeda ( Univ. of Tsukuba)
Astronomical Observational Techniques and Instrumentation
BNL-SLAC-Annecy TeleConference
Starter: y = x + 1 B) y = x – 1.
Electronics & Communication Engineering
NIRSpec Time Series Observations
Gayle K. Martin November 14, 2016
Charge collection studies with irradiated CMOS detectors
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
NAC flat fielding and intensity calibration
Charge Transfer Efficiency of Charge Coupled Device
Detectors of JWST Near IR Instruments
Bernard J. Rauscher Space Telescope Science Institute
Integration and alignment of ATLAS SCT
Photodetectors.
PIN DIODE.
of APS (Full Depleted FDAPS, MAPS and Hybrid Technology HPD)
VIRTIS Operations at Lutetia
ESAC 2017 JWST Workshop JWST User Documentation Hands on experience
Chapter 6 Noise.
Charge Coupled Device Advantages
Automatic Picking of First Arrivals
Ali Ercan & Ulrich Barnhoefer
ScECAL+AHCAL+TCMT Combined Beam FNAL
Preliminary Design Review
Persistence Experiment Preliminary Design Review
The response function of semiconductor pixel detectors for highly ionizing particles Jan Jakubek, P. Soukup Institute of Experimental and Applied Physics,
Statistical Methods For Engineers
Preliminary Design Review
Detector Parameters Marco Sirianni - ESA.
SCIENTIFIC CMOS PIXELS
Detective Quantum Efficiency Preliminary Design Review
Announcements HR Diagram lab will be extended for one week. I’ll talk about it today. Homework: Chapter 9 # 1, 2 & 3 Next week is a Dark Sky Night. If.
Turning photons into bits in the cold
Testbeam analysis on module #1
Persistence Experiment Preliminary Design Review
Beam Test Results for the CMS Forward Pixel Detector
TEST FOR RANDOMNESS: THE RUNS TEST
Load forecasting Prepared by N.CHATHRU.
Physics Requirements for Conventional Facilities
The MPPC Study for the GLD Calorimeter Readout
HL-LHC power converter requirements Thermal settling drift
TEMPO Instrument Update
Presentation transcript:

Dark Current Experiment Preliminary Design Review 25 September 2001 Bernie Rauscher SPACE TELESCOPE SCIENCE INSTITUTE

Goals of the Review Demonstrate that we know how to measure dark current Choose preferred experiment setups Choose items to purchase Generate actions 5 July 2019

Definition of Dark Current Dark current is the signal that accumulates linearly in the absence of any light source Important contributors to dark current include Charge diffusion, Thermal generation-recombination (GR) of charges within the semiconductor, & Small leakage currents Strictly speaking, dark current does not include effects such as amplifier glow and multiplexer glow. Nevertheless, these effects have much the same effect as dark current and therefore require good characterization. 5 July 2019

The importance of Reference Pixels Experience by G. Finger, D. Hall, and others has shown that reference pixels are necessary for measuring dark current at ultra-low background levels Reference pixels shall be used in a manner TBD to suppress correlated noise and drifts to a level well below the rms noise in each frame. The next two slides illustrate the importance of reference pixels. 5 July 2019

Darkcurrent Measurement using open In bump bonds Triangles: measured integration ramp Diamonds: dead pixels Open In bump bonds are used to monitor drifts Squares: drift corrected integration ramp darkcurrent at 28.5 K: 0.017 e/s/pixel This slide courtesy of Gert Finger, ESO 5 July 2019

Darkcurrent Measurement using open In bump bonds Triangles: measured integration ramp Open In bump bonds are used to monitor drifts Squares: drift corrected integration ramp darkcurrent at 25 K: 0.004 e/s/pixel 5 July 2019

NGST Requirements from NGST Doc. 641 NGST does not have a dark current requirement. Rather, total rms noise including contributions from read noise and dark current in a 1000 seconds exposure should satisfy the aforementioned requirements. 5 July 2019

Dark Current Experiment Requirements It shall be possible to measure the dark current of a detector meeting the NGST Project’s requirements to 10% accuracy. Assume 1/√2 of total = 2.5 e- in a 1000 s exposure is shot noise on dark current idark = 3.12510-3 e-/s/pixel This implies a requirement on light-tightness of the detector head enclosure =3.12510-4 e-/s/pixel 5 July 2019

Dark Current Experiment Requirements There are implied requirements on per sample read noise The procedure (described later) will be to take samples at ~15 minute intervals for several (~4) hours and to fit a line. For this experiment, the per-sample rms noise requirement is =4.9 e- Reference pixel corrections shall be made so that drifts are negligible compared to rms noise Least Square Line Fitting 5 July 2019

Proposed Experiment Procedure Blank off detector If detector has been warm or exposed to light in past 24 hours, drain depletion regions by allowing enough time (TBD) for trapped charge to randomly bleed out of traps (24 hours?). Stabilize detector bias and temperature Obtain bias/dark MULTIACCUM ramp exposure as follows 5 July 2019

Summary of Requirements 5 July 2019

Proposed Experiment Variations The following would be decided early on and frozen Length of ramp Number of samples (TBD) at each point on ramp Select 1 pixel and do not clock (Cannot use reference pixels when doing this) The following would be done for each detector Temperature: 3 levels covering NGST range Bias levels: 2 levels covering NGST requirement =6104 e- and goal =2105 e- for well capacity Sample spacing along ramp: 2 spacings ~7.5 min and ~15 min to allow separating intrinsic dark current from glow Combinations: 12 combinations per detector -> Approx. 1 week per SCA. Dewar is big enough for 4 SCAs, could save time by testing 4 detectors at a time. 5 July 2019

Proposed Experiment Duration Dominant step in terms of schedule is length of ramp Time estimate: 6 days per SCA (excluding cooldown/warm up) Extended scope: Single pixel readout using custom hardware reference Use of off-chip pre-amp 5 July 2019

Proposed Experiment Designs Standard TFST hardware (dewar, Leach controller, etc.) Blank off “top” for detector enclosure Blank off “top” must include a light-tight vent to allow pumping. Alternatively, a slide can be closed once the system is fully under vacuum. 5 July 2019

Data Reduction/Analysis Procedure Data collected in passthrough mode Reference pixel correction (TBD) Fit slope on per-pixel basis 5 July 2019

Expected Performance (Accuracy) Requirements have been set to allow ~10% accuracy measuring NGST’s goal total noise May be limited by light leaks 5 July 2019

Schedule Dark current is a fundamental parameter that directly effects sensitivity. Should be one of the first “real” experiments done in lab. 5 July 2019

Costs (Shopping List) “Top” for detector head 5 July 2019

Risks System may not be light tight Bias may be insufficiently stable Potential for major reworks in detector head. Can mitigate this risk by using aluminized tape for critical joints if found to be necessary. Bias may be insufficiently stable Can mitigate this with simple custom voltage reference if found to be necessary. 5 July 2019

Actions 5 July 2019