Church Road Community Meeting

Slides:



Advertisements
Similar presentations
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Advertisements

City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Santa Maria River Bridges Widening. Project Location.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
Site Pictures for IFB# 09-08/21/14 Concrete Services for Greenville County.
Functional Classification Maranda Obray, Transportation Planner Idaho Transportation Department.
The Roads Ahead Leroy D. Alloway, Director Community Development.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Community Development Department Construction Phase.
Welcome March 20th 2009 Roads 101 GCMPC Presentation By Derek Bradshaw.
Outline  Board Direction  Tasks Completed  Recommendation.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
PEACHTREE HILLS ROAD WAIVER REQUEST  2.34 ± acres  Currently zoned R-1a  Proposes to create 2nd lot (Mesa Village Tracts No. 2, Replat No. 1)  Applicant.
Transportation System Comments Santolina Level ‘A’ Master Plan.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Pioneer Road Relocation and Reconstruction Project
Norman CTP Subcommittee Meeting #3 - Needs and Projects March 25, 2013
Thoroughfare Plan Update
Nixon Road Corridor Study: Findings & Options
32 Transportation Midway City 2016 General Plan
Four Winds Condominium Association August 2, 2017
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Central Polk Parkway PD&E Study
Project Status & Right-of-Way Acquisition
Project Management Team Meeting #3
MASTER THOROUGHFARE PLAN AND STREET DEVELOPMENT STANDARDS
YMPO RTP Technical Advisory Committee Meeting
Molly Kline, Project Manager
District 3 Complete Streets Projects
Bike and Transit Connections
DICKINSON AVENUE RECONSTRUCTION
Request #2 Request #1 Segment built by LCPS.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
The Oakton Condominium Association September 12, 2017
Showroom 2- Frontage view
Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO October 19, 2017.
CR184 (Quintette Road) Bridge #480045
Pavement Markings Lesson 2 Understanding Pavement Markings 1 1.
Early Voting Starts Oct. 20 | Election Day Nov
CH 42 & TH 13 Construction Update
Using CMFs in Planning for Virginia’s Project Funding Prioritization
Traffic Study Presented by Keith Wenners, pe, ptoe
I-295/Malcolm X Avenue Interchange Improvement Project
Traffic Safety.
Geometric Design: General Concept CE331 Transportation Engineering.
Comprehensive Transportation Plan
Heart of Florida Loop East Section
2040 Regional Transportation Plan Sparks Citizens Advisory Board
1700 South Widening and Reconstruction Project
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
City of Spruce Grove Capital Region Partners Presentation 2019
Dakota County Board Of Commissioners August 6, 2019
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
November Bond Election
Buckner Road Interchange at I-65 Public Meeting
Presentation transcript:

Church Road Community Meeting June 26, 2019

Longer-term Church Road Improvements Roadway is currently classified as Minor Arterial on VDOT Functional Classification Major Collector on County’s Major Thoroughfare Plan Current Planned ultimate roadway section calls for a 4-lane divided with an 80-foot right-of-way Variable existing right-of-way (47 feet – 80 feet +) No current programmed or funded project to improve

Longer-term Church Road Improvement Option 1: Church Road Widening Widen to a three-lane section w/ one travel lane in each direction plus a center left-tun lane Would include sidewalks or multi-use trail Requires 70 feet of right-of-way Would impact approximately 85 parcels Projected cost of $30.4 million

Longer-term Church Road Improvement Option 2: Cox Road Extension Still Included on County’s Major Thoroughfare Plan Was put on-hold following public involvement in mid-2000’s Project would connect Cox Road to Church Road just south of Morgan Run Road Would widen Church Road to just east of Guyana Drive No current cost estimate and not programmed

Church Road Traffic Counts Year East of Lauderdale Drive Growth Rate South of Three Chopt Road 2000 5306 N/A 11400 2001 5311 0% 11341 -1% 2002 5006 -6% 12353 9% 2003 5000 11737 -5% 2004 5724 14% 11419 -3% 2005 5895 3% 11579 1% 2006 5782 -2% 11466 2007 5659 12002 5% 2008 5777 2% 12213 2009 6697 16% 11946 2010 5721 -15% 10590 -11% 2011 5621 10317 2012 7077 26% 10714 4% 2013 6528 -8% 11069 2014 7002 7% 10815 2015 6648 13016 20% 2016 7825 18% 12390 2017 7584 11271 -9% 2018 8228 12396 2019 8523 12% 12150 8%   2000-2009 Average Growth Rate 2010-2019 Average Growth Rate 6% Total Average Growth Rate

Contact Information: Steve Yob Director of Public Works yob@henrico.us 501-4390   Todd Eure Assistant Director or Public Works eur@henrico.us 501-4617