4 shelf shoe rack assembly instructions

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Knock Down Fittings Product Design.
Assembly Instructions last updated October [NOTE: It is easier to assemble your Earthmaker on a non-skid surface. The Earthmaker can then be picked.
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
RockOn! Canister Integration RockOn! 2009.
1. Install Your BalJak™ into floor using driver and drill.
Pin Cushion Assignment HNC3CI Crowell Adapted from Fairy Face Designs.
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
© Copyright year ABB. All rights reserved /1/2015 Insert image here VR-3S Procedure for the Removal of the PCD from the Low Voltage Cabinet.
Typical Walk-in Closet with elfa® décor
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
Building a Computer Kate Chapin Capstone Project.
Origami Flower Instructions. 1. Arrange the origami paper on a flat surface, color side down, with one corner pointing at you.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Showing Demonstrations on the TV How to connect the camera to our TV set.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
HOW TO MAKE A KITE? BY : ADITYA SANJU SAGARJIT ARCHAN.
Air and Water Fountain Part 5. Daily Objective Air is matter and takes up space. Air pressure can move water.
This is what we want to draw Extrude Mirror Round Edges.
3x3 Cube Solution: *There are MANY ways to solve this cube!
Remove the seats from the car, there is no easy way to do this. Flip it up side down so it looks like [1] Both sides are done exactly the same, so.
Dance Pad Project By: David Dorsten. Understand  Electric Engineering Project = Dance Pad and Light Bulb Station  This activity will demonstrate the.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
The Little Ann Assembly Instruction By Laser Dollhouse Designs.
Empty Bowls Pinch Pots Gently tap piece of clay on table to make it round. Do not SMACK or SLAM clay onto table. Use wet fingers to smooth out any cracks.
How To Make The Castle Himeji. Step 1 Draw a a bid rectangle the size of 40 feet with the rectangle tool Step 2 in one of the sides of the rectangle draw.
+ Fractions. + Part of a whole + + Numerator How many pieces The number on the top of a fraction.
How to build a quick animal shelter. In Central Oregon, it’s getting more and more common that people are growing their own food and acquiring animals.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
HOW TO MAKE AN Spring 2012 Origami Balloon By: SondraVojvodich.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
30’ Wireless Mast – Self Install
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Installation Walkthrough Image Guide
Vertical Mill Basics Instructor:.
How to Cover Your Book.
Adding Stairs to Your House
Types of Wood Joints.
C B A Using Watercolour…
How to Guide for Making Wheelchair/walker bags
Kitchen Safety.
On the next blank page… Make a two-column chart
Hand-cranked Windmill Assembly Instructions
T400 Motor Replacement.
Kitchen Safety Be SAFE!!! © 2010 Just FACS.
Assembly instructions for M-K all bolt together hoppercone kit.
Solving the Rubik’s® 2x2 Cube
W201 3R hardboard Replacement Procedure.
Friday, September 5, 2014 Objective: Students will convert between units using a conversion factor. Warm-Up: Add the objective to your log and self evaluate.
Kitchen Safety Be SAFE!!! © 2010 Just FACS.
Kitchen Safety Be SAFE!!! © 2010 Just FACS.
HOW TO MAKE A FROEBEL STAR
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
1 1/8” 1 1/8” 1 1/8” 3/8 boarder 1 1/8” 1 1/8” 1 1/8”
Flip Turn Sequence Somersault: tuck knees to chest don’t use hands
Finishing.
Kitchen Safety Be SAFE!!! © 2010 Just FACS.
Flip Turn Sequence Somersault: tuck knees to chest don’t use hands
Kitchen Safety Be SAFE!!! © 2010 Just FACS.
Kitchen Safety Be SAFE!!!.
Kitchen Safety Be SAFE!!! © 2010 Just FACS.
Solving the Rubik’s® 2x2 Cube
Please Do Now Please Get: 1 piece of paper and a pair of scissors
Kitchen Safety Be SAFE!!! © 2010 Just FACS.
Presentation transcript:

4 shelf shoe rack assembly instructions 3 shelf uses same principals

You are starting with the top and working your way down to the bottom. So take the top and lay it upside down on a towel or a soft surface. Take the two pre assembled handles and from the top side pass them through the holes so the connectors protrude. Step 1

Add a coupling + 6” pipe to all 4 corners to lock the first shelf in Add a coupling + 6” pipe to all 4 corners to lock the first shelf in. Hand tighten for now and you can always use a wrench later if you want the couplings tighter . Then add a coupling + 1 ½” pipe to all 4 corners to hold the next shelf which is shelf #2 from the top when you flip it over. Step 2

Fit the second shelf between the 1 ½” pipes on all four corners Fit the second shelf between the 1 ½” pipes on all four corners. Don’t worry if you have to pull a bit on the pipe to match the holes. Once done lock the four corners in with four couplings, then repeat the previous step for the next two shelves in the exact same way. Step 3

Step 4 Follow instructions from step 3 for shelf #3

Step 5 Do the exact same thing as step 3 and 4 but now you are only adding the coupling to lock in the bottom shelf and then a 4” pipe on all four corners.

Step 6 Your almost done. Loosly put on the 4 flanges to the bottom of the 4” pipe for the feet. You are putting it on loosely as this is what will be used to level the piece to your particular floor as there is about ½” of play on all 4 corners 

Step 7 Flip it over and admire your work 