5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Advertisements

LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Tue 9/8 – Wed 10/8 Stable beams # :18 RQT12.R7B1 trip. End of STABLE BEAMS # ~86 pb -1 in ~19 hours 20:30 No beam from PSB (RF problem in ring.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Wed 27/7 – Thu 28/7 09:00 LHC Controls problems
Machine Coordinators: G. Arduini, J. Wenninger
LHC progress Week 30 summary 30th July 2012
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
Week 32 Started with luminosity production…
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
LHC Morning Meeting - G. Arduini
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thursday 24th January - morning
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Summary of Week 16 G. Arduini, J. Wenninger
Coordination by E. B. Holzer & J. Wenninger Production
Friday 31st August & night
Thursday 10th May - morning
LHC Status Sun Morning 20-Mai
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Sunday morning Recovering from 400 kV disturbance.
Chromaticity can make a difference…
Finally.... We had to wait a long time.... We had many problems....
Friday Morning 7:30 injection for fill 2908
Summary Thursday h21: Stable beams fill #1303.
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Summary week 18 Intensity ramp up & production
Saturday 3rd November - morning
Scrubbing progress - 08/12/2012
Thursday – Morning Energy matching at injection with H CODs
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Thursday 22 September 2011.
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Thursday
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Thursday 20th July - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Wednesday 26 October 2011.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday 14:30 Fill 2011 dumped.
Saturday 26 November 2011.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Mon 8/8 – Tue 9/8 Stable beams #2009
Tuesday
Presentation transcript:

Coordination: Eva Barbara Holzer, Mike Lamont A typical LHC week Coordination: Eva Barbara Holzer, Mike Lamont

Sunday morning 07:40 Fill 2007 dumped – PIC PLC R1 UJ16 Lost matching section R1 Markus Zerlauth: memory corruption, remote reset possible Stable beams: 17h12m ~80 pb-1 delivered in Atlas/CMS Reset, pre-cycle and go, but no… PS RF low-level problems tuning of the 40MHZ cavity in the PS and then a RF low level problem - here be the dark wizards and black arts; dark wizards on holidays 17:45 Injecting physic beams 8-8-2011 LHC status

Sunday evening 19:11 Stable beams #2008 ppb: 1.25e11 initial lumi ~2.1e33 lifetimes > 25 hours no apparent blow-up 19:38:54 Beams dumped – quench looped open – RQ4.R5, RQ10.R5, and RD2.R5 It is not clear for the time being whether this was beam related (losses affecting QPS) or it was an EM disturbance.. UFO buster caught a small event in correspondence of the beam dump, which points to the first alternative – investigations ongoing. 8-8-2011 LHC status

Last night The VAC valves in IP5-R closed due to a vac spike at around 23:10. Valves closed at 19:38. This is clearly related to the beam dump. Pressure was increasing since ~18h. We checked: a similar increase occurred also during injection and ramp of the previous fill. The piquet reported also that he see temperature increase in region of D2-Q4. BIC history: the VAC interlock occurred 2.6 s after the beam dump. So the vac spike is not the direct source SPS B2 kicker problems 02:48 Stable beams – fill 2009 1.71e14 Peak luminosity 2.1e33 1.24e11 ppb 8-8-2011 LHC status

Week 31: main timeouts Monday 1st to 23:30 - cryogenics recovery Thursday afternoon Access in shadow of POPS deployment PIC, BLM, QPS, Cryogenics, MKI point 2, Patrol lost – PM56… Thursday evening Booster – slow kicker problem BPM in LSS6, spurious interlocks from BLS in LSS2 Injection oscillations, re-steering B2 Sunday PS RF 3 2 4 1 LHC status

Last week: fills above 450 GeV Start Fill Mode Stable [h] Int. L (pb-1) Dump cause Mon 1 1997 STABLE 2h46m 17.0 Cryo PLC point 1 (SEU?) Tue 2 1998 6h54m 37.3 RF 1999 11h21m 57.2 Electrical network glitch (FMCM) Wed 3 2000 21h32m 90.6 OP dump Thu 4 2001 2h49m 18.4 PIC PLC point 5 Fri 5 2005 22m 2.0 PIC PLC point 1 2006 25h59m 100.4 Sat 6 2007 17h12m 81.5 PIC PLC R1 Sun 7 2008 27m 3.3 D2.R5 quench loop Mon 8 2009 … 30+ Bunch intensity gently pushed up to ~1.25e11 Average emittance ~2.0 microns 2-8-2011 LHC status

2006: Luminosity lifetime 8-8-2011 LHC status

2006 BCT 8-8-2011 LHC status

Beam size (from Atlas lumi region) ~growth rate 64.4 hours growth rate ~84.4 hours 8-8-2011 LHC status

Beam lifetime >25 hours improving to ≈50 hours during the fill

One batch blow-up with 1.25e11 8-8-2011 LHC status

Vacuum on stepping up to 1.25e11 ppb fill 2007 7-8-2011 LHC status

Next fill - start 2008 8-8-2011 LHC status

Losses on TCTVB.4R8 We have found that the losses at the TCTVB.4R8 are actually correlated with the losses at the TCP of IP3 - good correlation with the vacuum signal VGPB.656.5R3.R.PR 7-8-2011 LHC status

Misc Tunes increased by 1e-3 both beams, both planes Bunch length SPS BQM frustrating injection Cryogenics: automatic reset of PLCs point 1 deployed Insulation Vacuum One of the 3 turbo pumps pumping the known helium leak in sector 3-4 (subsector A27L4.M) had failed on Sunday ~13:15. Monday: turbo pump replaced and vacuum pressure returned to the level prior to the failure. MKI interventions (Mike Barnes) Ferrite installed on input triggers (G1, G2A and G2B triggers) to the thyratron trigger unit, of: Trigger Main 3, Trigger Dump 3, Trigger Main 4, Trigger Dump 4 Note: following above some further runt trigger outputs were seen on MS3 G1 up until 13:00hrs. Returning after lunch, no more runt triggers occurred...... Replaced the crate for G1 trigger units of M3, D3, M4 & D4 8-8-2011 LHC status

Incoming Loss maps SPS magnet change Test of squeeze to beta* = 1 m Test of determinsistic satellite generation PM56 to sort out defintively 8-8-2011 LHC status

8-8-2011 LHC status

8-8-2011 LHC status

W31: records (c/o Atlas & CMS) 8-8-2011 LHC status