Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Fri – Sat - Sunday 30 Sept - 2 nd October Friday  06:00 Operator dump fill #2171, integrated lumi 75 pb-1.  90 m  * optics Optics ok, collisions at.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Wednesday
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Wednesday September 14th
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday fill with 1092 bunches (6 h stable beams)
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Fri 15th – Sun 16th June Friday Saturday Sunday Monday
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Coordination by E. B. Holzer & J. Wenninger Production
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Week 35 – Technical Stop and Restart
Monday Morning – recovery from cryo.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Thursday :00: Physics fill from the night shift
Finally.... We had to wait a long time.... We had many problems....
Tuesday 22 November 2011.
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 03/11 – The Plan Finish electron-cloud program:
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Saturday :42 stable beams fill 3541
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday 20 September 2011.
LHC Status Fro Morning 9-Sep
Thursday
Saturday 24 September 2011.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Thursday 20th July - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday morning / afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma – reduces losses in the line a bit but no miracles, effect of change to be studied in more detail 11:15 Injection 12:48 Stable beams fill #2157, initial L = 3.2e33 14:37 Beam dump, RF klystron vacuum, int lumi = 19 pb-1 Measured and adjusted the Orbit-FB's calibration factor for the B2 dispersion orbit suppression – indicates a positive effect 17:43 Stable beams fill #2158, initial L = 3.1e33 22:31 Beam dump, PC triplet R2, int lumi = 43 pb-1 23:45 Access PO for triplet – exchange a power module on RQX.R2 QPS-OK was found missing for RQTL11.R5B2 – needed power cycle 02:45 Injecting again – injection not very clean 05:09 Stable beams fill #2160, initial L = 3.0e33 07:04 Beam dump, 4 circuits tripped in sector 56, likely SEU, int. L = 19 pb-1 27/09/2011 LHC 8:30 meeting

QSP on RQX.R1 Similar event as Sep 10th, where the QPS signal of Inner Triplet.R1 saturates and heaters were fired: SEU? Cryo lost for this IT.R1 due to the quench heater firing, but recovered after about 1.5 hour The only signal from QPS is on the RCBXH3.R1, where the U_res increases and saturates at 250 mV; there is no PM from the main circuit Yesterday 10th September 27/09/2011 LHC 8:30 meeting

Fill #2157 Dumped by RF klystron 2 vacuum 2 interlock B2: reset and refill.... 27/09/2011 LHC 8:30 meeting

Tune Feed Back switching off during squeeze Tune-FB B2 seems to systematically switch 'off' during the middle of the Squeeze, possibly due to large coupling deviations. Test ramp with two bunches, step through squeeze for coupling corrections 27/09/2011 LHC 8:30 meeting

MKI “integrated lumi measurement” Injection kicker MKI magnet reaching 62.5 degrees 1 degree above injection threshold 27/09/2011 LHC 8:30 meeting

Vacuum – better but to be watched VGPB.123.4L2 - ALICE Better 1e-6 VGPB.183.1R5 - CMS Peak 1e-6 mbar on morning ramp 27/09/2011 LHC 8:30 meeting

07:04 Beam dump the U-res of ROF.A56B1 is suddenly going to saturation and the circuit trips; the other circuits tripped by coupling. problem with the MQ.21L4 (quench buffer in progress) Access required XPOC no BCT data – old problem which was thought to be solved…. 27/09/2011 LHC 8:30 meeting

Plan Produce lumi, except: Tuesday Access MQ.21L4 (quench buffer in progress) Switch powering configuration Change LHCb polarity Test ramp with two bunches: step through squeeze for coupling correction to solve tune feedback problem Test ramp for abort gap cleaning at 3.5 TeV with 36 bunches Friday 06:00 dump physics fill 90 m optics until Saturday morning 07:30 Saturday Am: VIP visit – machine access Close and search before noon 27/09/2011 LHC 8:30 meeting