Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova,

Slides:



Advertisements
Similar presentations
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Advertisements

Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
L1Calo Operations Summary
Wednesday 3rd October - morning
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Wed 27/7 – Thu 28/7 09:00 LHC Controls problems
Luminosity lifetime – fill 2932
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
L1Calo Operations Summary
Saturday 30th June - Sunday: Rocky !
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
Tuesday 22nd January - morning
Run coordination Summary
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Thursday morning 09:30 Dump of pPb fill.
Summary of Week 16 G. Arduini, J. Wenninger
Bernhard Holzer, Joerg Wenninger
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Chromaticity can make a difference…
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Sunday
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 10/5 Cryo recovery until 18:30
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Friday 25 bunch fill dumped just before (BLM in 5)
Saturday 3rd November - morning
Run coordination Summary
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Friday morning 08:00 Stable beams with 840b.
Thursday
Saturday 2nd October BLM threshold follow-up - Bernd Dehning and Joerg Wenninger Following MPP approval, Bernd Dehning has increased the BLM thresholds.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Thursday 20th July - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Saturday 6th October 05:38 STABLE BEAMS # :06 OP dump
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Tuesday
Friday 1st October : Van der Meer scans
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova, RM report 15 August Weekend Summary Friday Saturday Sunday

Weekend summary: Friday Beam recovery LHC not available yet in the morning PS problem (fixed at noon) LHC implementing protections for the faulty dipole ATLAS calibrations CTP sw tests (very quick), not done the longer test announced in the morning; CSC test: From now on, CSC will NOT give "LatenctMismatch" error, and will just set the latency correctly without any expert intervention. CTP + L1 topo test Afternoon standalone long tests for several subdetectors: Tile, CSC, TGC, MDT (testing recovery of the chambers in standalone) ATLAS data taking LHC planning a first full round with 3b only  Defining keys as STANDBY [~19] a first injection but beam dumped  21:35 New access needed to fix beam dump system at point6 [00:38] Stable beam for 3bunches Fill 5194, just few minutes [05:51] Stable beam for 2722b Fill 5196  just few minutes

Fill 5194 – Run 306247 – Single_3b_2_2_2_with_nc_probes [00:00] Switch to standby keys for 3b. However L1_RD0_UNPAIRED_ISO went up to ~2 kHz since prescale of ~65000 got set to 1 when moving to 3b standby keys  activate FFTV protection for IBL and cause 100% IBL busy. [00:20] Need a TTC reset of IBL was issued. [00:39] Stable beam 3 bunches 7’ with stable beam [00:43] Beam dump Fill 5196 – Run 306252 - 25ns_2172b_2160_1855_1948_96bpi_24inj 05:51 stable beams 05:55 beam dump due to electrical perturbation

Weekend summary: Saturday Physics 08:30 Stable beam for 2722b Fill 5197 16:43 Stable beam for 2722b Fill 5198

Fill 5197 – Run 306269 Peak lumi: 1.06 x 1034cm-2s-1 Lumi Ready Rec: 159 pb-1 Stable: 5h 15m 2172b_2160_1855_1948_96bpi_24inj Fill 5197 – Run 306269 [08:34] Pixel: noticed by chance during ADJUST that the PPC of ROD_L1_S10 was stuck. Tried to recover before declaration of stable beams Ready for physics delayed by ~3’. PPC status should be checked routinely until an automatic monitoring can be established. [08:38] Stable beam Enabled several additional L1Topo items. The L1 rates all seem fine and the stream rate is around 40 Hz. Trigger shifter noticed that some Predictions need to be updated. L1_3J50 looks wrong to be followed up. [13:52] Beam lost due to BLM UFO Some busy by RPC, TGC, Pixel, SCT

Fill 5198 – Run 306278 Peak lumi: 1.08 x 1034cm-2s-1 Lumi Ready Rec: 392 pb-1 Stable: 16h 23m 2172b_2160_1855_1948_96bpi_24inj Fill 5198 – Run 306278 16:35 noticed in adjust some delay (1-2’) between the ATLAS pref lumi and the ‘same’ information in page1. It is correct in ATLAS toLHC tab [16:43] Stable beam 21:45 LAR EMEC HV TRIP - recovered 01:12 power cycle of Tile Module LBC44 DQ In histogram "Eta-phi of tracks with no IBL hit but hit is expected, ratio to total tracks" in OHP, there are some hits expected (but without IBL hit) around (eta,phi)=(-2.5 , -1.5). MDT got 50% busy on and off around 07:42 for 5 minutes. The offending channel was BC-0 and it was fixed by itself at 07:48. [09:02] Beam dumped Some busy by IBL, SCT, MDT

Weekend summary: Sunday Data Taking Changed EMECA HV Module as 4 channels do not work LHC raising to 2220b

Fill 5199 – Run 306310 Peak lumi: 1.04x1034cm-2s-1 Lumi Ready Rec: pb-1 Stable: 25ns_2220b_2208_1940_2036_96bpi_24inj Fill 5199 – Run 306310 25ns_2220b_2208_1940_2036_96bpi_24inj [13:01] Stable beam [] Beam lost