S.T.E.P.S. Bridget Avery, John Bushman, Jeremiah Eyster,

Slides:



Advertisements
Similar presentations
Segment 2: Meetings with the Intern Schedule Topics 1.
Advertisements

Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Are you ready?. Welcome to Perception and Cognition JEOPARDY !
MSD-I Project Review Modular Motion Tracking Sensors 1.
P09451 Mid-Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.
Senior Project Database: Design and Usability Evaluation Stephanie Cheng Rachelle Hom Ronald Mg Hoang Bao CSC 484 – Winter 2005.
MSD-II Project Review Modular Motion Tracking Sensors 1.
System Development Life Cycle (SDLC)
Low Cost Fundus Camera P15590 December 11th, 2014
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
OJT 2. 50% Coding Defense  Dec (schedule to be posted soon)  Start of user’s manual.
7 th Continual Improvement & Innovation Symposium 2015 CASE STUDY COMPETITION: INNOVATION TEMPLATE [ Name of the Organization ] [ Innovation Title ]
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Applying “Engineering Processes” to solve problems Learning to apply project management systems Tools to manage time and resources Accessing information.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Learning by Experience A Project in the Design Phase 2:15 – 3:00 Performed by: A Cast of Many.
CSE 436—Software Development Models Ron K. Cytron 10 October 2005.
MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard.
Innovation Storyboard
Meghe Group of Institutions Department for Technology Enhanced Learning 1.
I. Preliminary Design Review 1. Product specification 2. Project scope 3. Technical approach/solution to the Design Problem 4. Working Schedule (Gantt.
Test Plan SP1: Time To Train User Plan: Gather a group of people and teach them individually how to use the system. Document how long it takes each.
 Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding electrical components dependent on varying mechanical.
Topic:- At the end we will be able to explain:- Why it is called Meta Model ?? Spiral Model Its Advantages & Disadvantages… Phases of Spiral Model...
Engineering Design Process: Overview Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright 2012.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
© 2017 by McGraw-Hill Education. This proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
Risk Assessments: Guidelines for Completing
SA Capstone Requirements and Design Week 10 SYST Winter 2016
ANSWER SHEET LISTENING (PartⅠ~ Ⅳ) READING (PartⅤ ~ Ⅶ) NO
Until The Coming of the Lord
Have your project out and ready for collection!
System Development Life Cycle (SDLC)
Prototype Model Lecture-4.
System Development Life Cycle (SDLC)
Unified Process (UP).
P17082 Biomechanical Elbow Model Detailed Design
بسم الله الرحمن الرحيم قَالُوا سُبْحَانَكَ لا عِلْمَ لَنَا إلاَّ مَا عَلَّمْتَنَا إنَّكَ أَنتَ العَلِيمُ الحَكِيمُ صدق الله العظيم ( البقرة 32 )
CPMGT 300 STUDY Lessons in Excellence--cpmgt300study.com.
CPMGT 300 STUDY Education for Service--cpmgt300study.com.
Multidisciplinary Capstone Design:
What do you need to know about XP?
Usability Research: Lessons Learned For Digital Assessment Delivery Cathy Wendler Educational Testing Service June 21, 2013.
HEMODYNAMIC SIMULATOR II P09026
P17082 Biomechanical Elbow Model Build and Test Review
Innovation Storyboard
System Development Life Cycle
Tigerbot VI Final Detailed Design Review
P07021: Instrument to Detect Thromboemboli
CIS 210 Systems Analysis and Development
Innovation Storyboard
Engineering Design Process
Tub Lift Rev. 2 Dom Group
SENIOR DESIGN PROJECT P08455
Systems Development Life Cycle
Multidisciplinary Capstone Design:
System Development Life Cycle (SDLC)
P08424 Residential Energy Savings
Parkinson Disease Psychosis
Project Readiness Review P10029 – Air Muscle Artificial Limb
Final Assignment Review and Discussion
It’s Time for a Break!!!.
Public Engagement Risk
Performance Measure Recommendations
Building a Better World One Idea at a Time
SENIOR DESIGN PROJECT P08455
Mechanical Bioreactor
SPEAKING ACTIVITIES (PAGE 50-54)
Detailed Design Review (Phase 4)
Presentation transcript:

S.T.E.P.S. Bridget Avery, John Bushman, Jeremiah Eyster, Stand-Up Technological Enhancements for Parkinson’s and Scoliosis Bridget Avery, John Bushman, Jeremiah Eyster, Alexa Farner, Tom Gerstein, Nathaniel Luther

Preliminary Design Review Overview Current Design and CAD Model Review of Engineering Requirements Feasibility Analysis for Meeting Engineering Requirements Test Rig Risk Assessment Test Plan and Risk Mitigation Moving Forward Bridget

Current Design Tom

Current Design Tom

CAD Model Isometric View Back View Side View Tom

Engineering Requirements John

Feasibility Analysis Results: Bridget

Structural Bill of Materials Alexa

Current Bill of Materials Alexa

Test Rig In order to collect initial user feedback we have created a test rig. We are currently in the process of acquiring approval to collect user feedback. Due to the time it takes to receive approval and due to winter break starting soon we do not expect to be collecting user feedback until we get back from break. Bridget

Risk Assessment Nate

Test Plan and Risk Mitigation Bridget

Test Plan and Risk Mitigation (Continued) Bridget

Moving Forward We are currently in the process of acquiring approval to perform tests using our test rig. We do not believe that we will be able to use this rig to collect any user feedback until January/February 2018 due to the time it takes to receive approval. We are finalizing our initial design. The CAD model for this design will be ready later this week. We plan on performing our own internal tests on our test rig so that we are able to collect some feedback on them. We then plan on building our initial prototype; after the prototype is complete we plan on looking at what flaws if any are present and how we can improve upon this model later in MSD II. John

Questions Thank you for listening to our preliminary design review presentation. At this time we can answer any questions that you may have.