HL7 PCWG: Care Plan, CCS and Health Concern Updates

Slides:



Advertisements
Similar presentations
Integrating the Healthcare Enterprise IHE Overview Keith W. Boone Interoperability Architect, GE Healthcare Co-chair, IHE Patient Care Coordination PC.
Advertisements

Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.
© 2013 Health Level Seven ® International. All Rights Reserved. HL7 and Health Level Seven are registered trademarks of Health Level Seven International.
Care Plan (CP) Meeting - Minutes November 14, EDT Laura Heermann Langford Stephen Chu
Care Plan (CP) Meeting - Minutes December 12, EDT Laura Heermann Langford Stephen Chu
HL7 Implementation Guide for CDA Release 2: Consolidated CDA Templates for Clinical Notes, Release 2 – US Realm HL7 Balloting Process August 12, 2013.
Longitudinal Coordination of Care Thursday, February 20, 2014 Care Plan Discussion with HL7 Patient Care WG.
Clinical Oncology Patient Transfer Summary Ballot Development Spring Ballot Clinical Oncology Treatment Plan and Summary, Release 1 Ballot for May 2013.
© 2012 Health Level Seven ® International. All Rights Reserved. HL7 and Health Level Seven are registered trademarks of Health Level Seven International.
LCC -Proposal for Next Steps August 28, Discussion Points Recap of Whitepaper Recommendations Critical milestones and activities driving LCC activities.
Larry Wolf, chair Marc Probst, co-chair Certification / Adoption Workgroup March 19, 2014.
DRAFT Agenda Care Plan (CP) Meeting Thursday, September 13, EDT Laura Heermann Langford Stephen Chu
Longitudinal Coordination of Care Thursday, February 20, 2014 Care Plan Discussion with HL7 Patient Care WG.
Longitudinal Coordination of Care (LCC) Workgroup (WG) HL7 Tiger Team Patient Care WG Care Plan DAM July 31,
© 2013 Health Level Seven ® International. All Rights Reserved. HL7 and Health Level Seven are registered trademarks of Health Level Seven International.
Care Plan (CP) Meeting - Agenda November 28, EDT Laura Heermann Langford Stephen Chu
Care Plan (CP) Meeting - Agenda January 02, EDT Laura Heermann Langford Stephen Chu
Longitudinal Coordination of Care (LCC) Workgroup (WG) HL7 Tiger Team Service Oriented Architecture (SOA) Care Coordination Services (CCS) May 1, 2013.
© 2012 Health Level Seven ® International. All Rights Reserved. HL7 and Health Level Seven are registered trademarks of Health Level Seven International.
Care Plan (CP) Meeting - Agenda October 31, EDT Laura Heermann Langford Stephen Chu
Pediatric Data Standards SIG Meeting San Diego, CA January 8-9, 2007.
HL7 Coordination of Care Services Project April 14 th, 2014.
© 2012 Health Level Seven ® International. All Rights Reserved. HL7 and Health Level Seven are registered trademarks of Health Level Seven International.
Care Plan (CP) Meeting - Minutes November 28, EDT Laura Heermann Langford Stephen Chu
Longitudinal Coordination of Care (LCC) Workgroup (WG) LTPAC SWG Meeting March 11,
Care Plan (CP) Meeting - Minutes October 3, EDT Laura Heermann Langford Stephen Chu
Longitudinal Coordination of Care All Hands SWG Monday, January 6, 2013 HL7 C-CDA Ballot Reconciliation.
© 2013 Health Level Seven ® International. All Rights Reserved. HL7 and Health Level Seven are registered trademarks of Health Level Seven International.
Structured Data Capture (SDC)
HL7 Pharmacy Report Paris, FR - May 2015
Clinical Interoperability Council Working Group (CIC)
PHER Process and documents
Overview of Request for Comments ONC 2017 Interoperability Standards Advisory ONC looking for comments on any last revisions, additions, or recommendations.
HL7 Care Plan Domain Analysis Model
Dynamic Care Team Management
Presented by Emma Jones, Tedford Johnson
QIO Nursing Home Introduction
TGaf San Francisco Closing Report
HL7 WGM Madrid May 2017 Care Plan Standards Update
Emergency Care Work Group
Patient Care Workgroup Care Plan Topic
HL7 WGM Madrid May 2017 Care Plan Standards Update
Structured Data Capture (SDC)
HL7 Patient Care Work Group
Allergy and Intolerances Project
Stephen Chu, PCWG co-chair Russ Leftwich, PCWG co-chair
PCWG updates: Care Plan DAM CCS
LHS – Care Team Value Sets
IEEE TGmb Sept 2010 Agenda Date: Authors:
PCWG – May 2015 WGM Updates Morning Sessions.
Knowledge artifact Specification Status & recommendations
PCWG updates: Part 1 Allergy/Intolerance Care Plan DAM CCS
IEEE TGaf Waikoloa Closing Report
Patient Care WG Allergy and Intolerances Project
Stephen Chu, PCWG co-chair Russ Leftwich, PCWG co-chair
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
TGaf San Antonio Closing Report
Specification on float equipment
Patient Care Work Group
January 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2015] Date.
Patient Care Elaine Ayres, Stephen Chu, Jean Duteau, Laura Heerman Langford, Russ Leftwich, Michael Tan Paris WGM 2015 Monday.
Roger Marks (Huawei) capable 13 March 2019
March 2018 Project: IEEE P MD
IEEE TGaf Palm Springs Closing Report
Roger Marks (Huawei) capable 12 March 2019
HL7 Immunization Project
Patient Care Elaine Ayres, Stephen Chu,
Patient Care WG Allergy and Intolerances Project
TGaf San Antonio Closing Report
Presentation transcript:

HL7 PCWG: Care Plan, CCS and Health Concern Updates Updates for EHRWS January 2014 WGM San Antonio Stephen Chu, MD, PhD, co-chair PCWG Laura Heerman Langford, RN, PhD, co-chair PCWG Michael Tan, co-chair PCWG Enrique Menses, PCWG and SOA

PCWG Projects: Care Plan Progress as at January 2014 Domain Analysis model: first informative ballot in September 2013 Ballot reconciliation in progress Negative major: Three types of plan (care plan, plan of care, treatment plan) Significant debates/variation in stakeholder opinions and no consensus Decision: to remove references to the different types of plan in DAM 7/6/2019

Care Plan Model: design decision Preserve the concepts of Dynamic and static plan Ensure the “plan” structure of logical model capable of supporting implementation of different types of plan by different stakeholders Support for "composition" and/or "association" between different types of plans in the model need to be addressed Storyboards to be adjusted to reflect the changes Types of Plan discussions: http://wiki.hl7.org/index.php?title=Types_of_Plan_-_Differentiation_and_Definitions 7/6/2019

Care Plan Ballot reconciliation to continue post San Antonio WGM http://wiki.hl7.org/index.php?title=Care_Plan_Project_2012 Ballot reconciliation to continue post San Antonio WGM Fortnightly conference call to commence 5 February 2014 at 4:00pm (1.5 hours) till week ending 9 March 2014 then call time change to 5:00pm start Participation and contributions welcome Plan: update Care Plan DAM package for May 2014 ballot submission 01/01/2011

Care Plan: collaborations Collaboration with CQI since Sept 2013 WGM Identity/develop a set of domain specific quality measures relevant to care plan implementation Examples – implementation in care plans: Measure for falls Measure for urinary incontinence Medication orders Follow-up care arrangements, etc Follow-up collaboration: Map CQI use cases to Care Plan DAM 01/01/2011

PCWG & SOA: CCS Project CCS: care coordination services functional model and technical profile to support the development and implementation of care plan of different levels of complexity First balloted in May 2013 Comment resolution now completed Begin dynamic/behavior models development in response to ballot comments 7/6/2019

PCWG & SOA: CCS Project 7/6/2019

PCWG & SOA: CCS Project 7/6/2019

PCWG & SOA: CCS Project http://wiki.hl7.org/index.php?title=Coordination_of_Care_Models NOTE: the CCS models are still evolving 7/6/2019

PCWG & SOA: CCS Project Dynamic/behavior modeling will continue after San Antonio WGM Plan to complete revision of CCS functional model and profile package for DSTU ballot by or before May 2014 Weekly conference call: Tuesday 5:00pm US Eastern Participation and contributions welcome 7/6/2019

PCWG Health Concerns Concern topic developed by PCWG in 2007 http://wiki.hl7.org/index.php?title=Health_Concern Concern topic developed by PCWG in 2007 Published in 2009 as DSTU Discussions on HL7 listserv in early 2013 on how to use “concern” model in CDA showed considerable confusion 11 01/01/2011 01/01/2011

PCWG Health Concerns PCWG decided to revisit “Health Concern” topic during September 2013 WGM Objectives: Clarify health concern and related topics Condition vs Concern Health concern vs Problem concern Health concen vs Health concern tracker Develop domain analysis model complete with storyboards and use cases Review, harmonise/revise Concern DSTU contents Join the Health concerns project Fortnightly conference calls: Thursday 4:00pm 01/01/2011

PCWG Active Projects PCWG welcome your participation and contributions Lots of fun PCWG is a gold star WG