Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
Advertisements

Mariusz Sapinski BI/BL Acknowledgements: 1 Planning of quench tests - QTSWG Latest news concerning planning of quench tests Quench Test Strategy.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Mariusz Sapinski BI/BL Acknowledgements: 1 Planning of quench tests - LMC158 Draft planning of beam induced quench tests at the end of 2013 run LHC Machine.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Summary Friday h38: Ramp down and pre-cycle.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday 11/07: Recovery Plenty of accesses.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Monday 6th August & night
LHC Morning Meeting - G. Arduini
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday March 4th 08h32: Access for beam dump system.
Friday 14th December - morning
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Planning at 5 o’clock meeting Friday
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Wednesday 03/11 – The Plan Finish electron-cloud program:
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Friday 23rd March 08:00 Access
Programme for Saturday 10 July
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Friday 25 bunch fill dumped just before (BLM in 5)
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Programme for Friday 9 July
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Thursday
Saturday 24 September 2011.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
RAMP FOR COLLIMATOR SETUP
Another Immortal Fill….
Monday 10th December - morning
Monday 27th August & night
Wednesday 26 October 2011.
31/3/2010 Difficult day… but at the end stable beams.
Wednesday 6.10 Morning: Quench test at 450 GeV
Tuesday
Presentation transcript:

Friday 15th February - morning After a long investigation, having to cope with timing, naming and polarity issues, we are now sure that the Q6 really quenched this morning at 6h10. Arjan Verweij Access In all areas to change the HW limits on power converters. BLM thresholds in cell 12L6 changed for fast losses with ADT quench test. Scope “There was some misunderstanding for the access in Pt5 were the elevator of PM54 was put in maintenance during the access.” “Got a phone call from the people accessing Pt.4 because the evacuation alarm went off. TI informs us that the test of the alarms was planned for today. Unfortunately nobody contacted the CCC or checked if the machine was in access mode before starting the test.” 16-02-2013 LHC status

Friday 15th February - afternoon 11:55 when switching the magnets ON, we have several of them that tripped: EPC back in 13:30 during the precycle, 3 PC tripped: RPMBB.UA83.RQTD.A78B2 RPHGA.UA87.RQ10.R8B2 RPHGA.UA87.RQ10.R8B1 HW limits problems for the 3 power converters that tripped. 16:25 RQ10.L8 trip at injection with no beam in. PIC trigger due to contact problem after hardware limit changed in the last access 16-02-2013 LHC status

Friday 15th February - evening 18:45 beam in calibration of the ADT pickups with different intensities down to 2e8p. After that test of acquisitions and excitation at 450GeV until 20:00. 20:55 Start ramp 21:25 Octupoles to zero, chromaticity to ~2 Found very small losses in MQ12L6 at a trim value of 21.61mm. BPM reading was at 17.89mm. Retract bump by 2mm for scraping with collimators and vertical excitation. Excitation with ADT 400%, MKQ 100% intensity: 1.8e8… 16-02-2013 LHC status

excitation with 1.9e8. BLMs at 35% of dump threshold. 16-02-2013 LHC status

ADT 200% gain, 4e8p, BLMs at 28% of threshold. 16-02-2013 LHC status

QUENCH! With 8.2e8p (bunch 1092) and 200% ADT gain 23:445 QUENCH! With 8.2e8p (bunch 1092) and 200% ADT gain 16-02-2013 LHC status

Saturday 16th February – early morning 23:50 Cryogenics is recovering already. Small event in 12L6. we observe a propagation of the quench on both sides. 00:50 Cryo back impossible to recover QPS on MQ.12L6 The quench heaters are not charging and the Global protection is still active 03:30 The QPS piquet called back. An expert managed to do the power cycle remotely; access no longer needed. All machine is ON; we prepare for the precycle. 05:40 Beam 2: three batches of 8 bunches injected to the LHC (Injection Scheme Single_36b_4_16_16 -> injected 4 bunches+4 bunches, one injection of 4 bunches skipped; repeated twice). 16-02-2013 LHC status

Saturday 16th February – early morning 06:05 Flat top 3 corrector orbit bump in 12L6. found (very small) losses in 12L6 with 21.13mm nominal bump amplitude (-17.7mm absoulte BPM reading). Stable losses - excite 1st pilot bunch with more or less the same ADT gain as during the collimator QT but with 1/3 of ADT amplitude 16-02-2013 LHC status

15% of ADT excitation strength -> losses up to 2e-3 Gy/s 16-02-2013 LHC status

excite the same 8 bunches again with 15% of the ADT excitation strength -> QUENCH of 12L6 (QPS) 16-02-2013 LHC status

Saturday 16th February – early morning 08:08 Quench End Run 1 Ramp-down 16-02-2013 LHC status