DOE Review of the LCLS Project 7-9 February 2006

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

Configuration Management
More CMM Part Two : Details.
EQUIPMENT VALIDATION.
1 Continuing Evolution of U.S. Nuclear Quality Assurance Principles, Practices and Requirements PART II - A Tutorial August 2005 This document.
1 MANUFACTURING AND PRODUCTION OF BIOLOGICAL PRODUCTS (ERT 455) HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEM Munira Mohamed Nazari School.
Overview Lesson 10,11 - Software Quality Assurance
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
Systems Engineering Management
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Release & Deployment ITIL Version 3
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
Introduction to ISO New and modified requirements.
Introduction to Software Quality Assurance (SQA)
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Software Quality Assurance Activities
From Research Prototype to Production
NIST Special Publication Revision 1
QUALITY ASSURANCE TRAINING DOE O 414.1C AND 10 CFR 830, SUBPART A
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Changes to the Therapeutic Goods Act and its implications Prepared by: Anna Frazer Prosthetist Hunter Prosthetics & Orthotics Service 10 th November 2006.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
Purchasing Forum – May The integration of the activities, plans, attitudes, policies, and efforts of the people of an organization working together.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
I. Preliminary Design Review 1. Product specification 2. Project scope 3. Technical approach/solution to the Design Problem 4. Working Schedule (Gantt.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Camera PDR/CD1 Planning 19 September 2008
Accelerator Readiness Review October 31, 2006
Configuration Management
OH&S Plant Obligations make
Project Management W. J. Foyt
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
Software Configuration Management
Quality Management chapter 27.
Software and Systems Integration
Configuration Management
TechStambha PMP Certification Training
Software Requirements
Flooding Walkdown Guidance
Food Production Systems
Software and System Delivery
Level 1 Level 1 – Initial: The software process is characterized as ad hoc and occasionally even chaotic. Few processes are defined, and success depends.
Level - 3 Process Areas (CMMI-DEV)
2K CB FDR Overview:  Agenda, Charge, Review Process
Air Carrier Continuing Analysis and Surveillance System (CASS)
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Engineering Processes
The Hazard Analysis Critical Control Point
Lockheed Martin Canada’s SMB Mentoring Program
The Hazard Analysis Critical Control Point
HHS Child Welfare National IT Managers' Meeting
ESSI CHANGE AND nonconformity control SYSTEM
PSS verification and validation
Configuration Management
LCLS Personnel Protection System and Beam Containment System
DOE Review of the LCLS Project October 2006
Presentation transcript:

DOE Review of the LCLS Project 7-9 February 2006 Quality Assurance Darren S. Marsh Stanford Linear Accelerator Center

Quality Assurance Activities Major Areas of Quality Assurance Quality Program Management and Support Planning Design Reviews Risk Management Procurement and Subcontractor Control Manufacturing, Inspection and Test Control Problem Identification and Corrective Action Assessment

Quality Assurance Program LCLS QA Program will be conducted in accordance with LCLS Quality Implementation Plan Lessons learned from other programs will be utilized The implementation relies upon the controlled application of plans, procedures, and requirements Objectives Design it to specifications the first time Build it correctly the first time Procure quality compliant components & services Test it completely the first time

LCLS Total Management System DOE Orders/Guides SLAC ISMS/EMS LCLS PMP, PEP, QIP, ES&HP LCLS Procedures/Plans Lessons Learned Best Practices Objectives/Goals Ensure requirements & expectations are met Provide confidence in achieved results Comply with applicable regulations & requirements

Integration of LCLS ISM and QA Core functions and principles of both programs substantially overlap, with no principles in opposition ISM and QA programs are together part of the total LCLS management system and processes for getting work done with safety, quality, and efficiency

ANL & LLNL Quality Assurance From LCLS QIP Quality standards at ANL/LLNL/SLAC are comparable

Technical Specifications

Technical Baseline – Design Definition Requirements Summary

Requirement Documents Tracking Requirement documents status reviewed at LCLS CCB Meetings Applicable requirements document updated based on CCB action or requirement change

Design Review Program Design reviews are essential to good engineering practice and will be used as a quality assurance metric to ensure the successful construction of the LCLS. ESD 1.1-324 establishes guidelines for design reviews conducted by the LCLS Subsystems. It describes the material to be covered, the documentation requirement and the process for closure of all action items. Reviews based upon the appropriate selection from the following reviews: System Concept Review (SCR) Preliminary Design Review (PDR) Final Design Review (FDR) Readiness Review (RR)

Technical Design Reviews

LCLS Risk Management Continuous risk management performed in accordance with the LCLS Risk Management Plan Project execution risk involves the ability to deliver the desired product meeting requirements, on time and within cost. To quantify risk, we look at the likelihood and consequence of an event Risk Management will include: What can go wrong? How likely is it to go wrong? What would be the consequences if something does go wrong? What can we do to prevent things from going wrong, or as least reduce the probability or severity of the consequences? How soon do we need to act? EXPECT THE UNEXPECTED SO THAT THAT UNEXPECTED BECOMES EXPECTED

LCLS Risk Registry Risk Registry (RR) monitors list of known risks to be managed until retired 56 total risks identified - 32 Technical - 18 Programmatic - 6 Retired Managed and updated monthly

Procurement & Subcontractor Control PMD 1.1-013 establishes processes to ensure that suppliers provide items and services that meet requirements Procured items and services must perform as specified and meet requirements Suppliers are evaluated and selected based on specified criteria Acceptance of procure items and services in accordance with specified methodology Advance Procurement Plan key for critical procurements

Manufacturing, Inspection and Test Control Manufacturing, Assembly and Installation Activities Work processes are planned and controlled Activities are performed in accordance with prescribed instructions, procedures and drawings Items are designed and changes controlled using sound engineering practices, analyses and configuration management Inspection and Test Items are inspected and tested to verify conformance to specified requirements

Problem Identification & Corrective Action LCLS QA Report identifies major systems and components that do not meet established requirements Conditions adverse to quality are identified, controlled and corrected to prevent recurrence, and reviewed for lessons learned QA Reports (2 total) from 2005 installation activities Sector 20-17 Waveguide Penetration Vacuum Leaks Injector RF Waveguide contamination

Management Assessment Management processes assessed to identify and correct problems that may hinder the project from achieving its objectives Assessments conducted to evaluate work performance and to promote improvement October 2005 Installation Feedback and Improvement Meeting

Summary Quality Assurance processes are in place to plan, perform, assess, and improve work Based on the development and maintenance of the integrated LCLS Total Management System Performance oriented Minimizes environment, safety, and health risks and impacts while maximizing reliability and performance Need to ensure QA Requirements are understood by all LCLS personnel