Always follow NORM protocol!

Slides:



Advertisements
Similar presentations
Always use mechanical handling aids when carrying out a heavy lift
Advertisements

Never place yourself in line of fire
Follow Management of Change for an activity which is not in permit
PDO Second Alert Date: Incident: LTI What happened?
Always use the right equipment for the task !!!!
No hands on elevator while delivering pipe
PDO Second Alert What happened? Your learning from this incident..
Never put your Hands in line of fire
PDO Second Alert What happened? Your learning from this incident..
Adequate tethered tools
PDO Second Alert Photo explaining what was done wrong
PDO Second Alert Always follow the PTW procedures
Always ensure straight lifting
PDO Second Alert Date: Incident title: HiPo MVI
Always report Near Misses
Do not stand in the LINE OF FIRE
PDO Second Alert Date: Incident title: HiPo Asset Damage
Tiredness and Speed Can Kill!
PDO Second Alert Date: Incident title: HiPo What happened?
Ensure that all Rig moves are carried out by competent personnel
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Date: Incident title: HiPo What happened?
Always slow down when negotiating roundabouts
PDO Second Alert Date: Incident title: MVI Rollover
Check equipment prior to start the job
PDO Second Alert Photo explaining what was done wrong
Confidential - Not to be shared outside of PDO/PDO contractors
Seek assistance of Banksman while reversing the vehicle
Always follow defensive driving techniques
Use only certified lifting equipment in good condition
Always intervene an unsafe act
Always get authorization before starting any job!
Always keep your equipment maintained
Confidential - Not to be shared outside of PDO/PDO contractors
Effective communication prevents incidents
Confidential - Not to be shared outside of PDO/PDO contractors
Always isolate equipment before beginning maintenance tasks
Always use fit for purpose lifting accessories
Keep clear of any rope under tension
Stay away from line of fire
Always use a banksman with reversing
PDO Second Alert What happened? Your learning from this incident..
Use a tool and protect your hands
Always ensure MOC is used when making changes to equipment setup
Always ensure protective guards are in place
Do not drive underneath overhead lines without permission.
Keep away from “Line of Fire”
Always verify isolation before starting any electrical job!
Confidential - Not to be shared outside of PDO/PDO contractors
Your safety should always be built on SOLID ground
Gas test before welding
Use clamps instead of bands to secure ESP cable on the tubing
Always be alert and operate drilling hoisting equipment at safe speed.
Vehicles to Keep Safe Distance at all times
Maintain communication between peers
Drive as per the road condition
Do Not Start Any journey without proper driving training.
Confidential - Not to be shared outside of PDO/PDO contractors
Always check your surroundings while working in the yard.
Driving rules are for saving lives – adhere to it always
If you feel tired, STOP and take rest
Carillion Alawi LLC, Incident Type LTI No, 16/12/18
Always assess your position and be away from “Line Of Fire”
Confidential - Not to be shared outside of PDO/PDO contractors
Confidential - Not to be shared outside of PDO/PDO contractors
Only overtake when safe to do so
Confidential - Not to be shared outside of PDO/PDO contractors
Beware of raised edges of walk ways.
Slow down and always drive to the conditions of the road.
Presentation transcript:

Always follow NORM protocol! PDO Second Alert Date: 09.10.2018 Incident title: HiPo (NORM) What happened? On 08 and 09 October 2018 a PTW Holder loosened a T- tank’s D-door of a NORM tank, drained oily liquid and got it transported by a third party vacuum tanker to PDO NORM yard. The incident was noted on 09 October and reported to PDO management. Your learning from this incident: Only PDO approved specialist contractor is allowed to handle and transport NORM. Contractor site management shall ensure that PTW Holders have enough time and correct resources to deal with NORM tanks. Ensure all dates and titles are input A short description should be provided without mentioning names of contractors or individuals. You should include, what happened, to who (by job title) and what injuries this resulted in. Nothing more! Four to five bullet points highlighting the main findings from the investigation. Remember the target audience is the front line staff so this should be written in simple terms in a way that everyone can understand. The strap line should be the main point you want to get across The images should be self explanatory, what went wrong (if you create a reconstruction please ensure you do not put people at risk) and below how it should be done. Always follow NORM protocol! Confidential - Not to be shared outside of PDO/PDO contractors

Confidential - Not to be shared outside of PDO/PDO contractors Management self audit Date: 09-10-2018 Incident title: HiPo (NORM) As a learning from this incident and ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure you use only PDO approved specialist contractor to handle and transport NORM? Do you conduct regular NORM awareness sessions for your workforce who are involved in activities where NORM are present? Do you ensure your site management know the scope of dealing with NORM and do not take the shortcuts to speed up a task? Do you ensure that relevant staff have clarity on how to handle Liquid and Solid sludge from Norm Classified source. * If the answer is NO to any of the above questions please ensure you take action to correct this finding. Ensure all dates and titles are input Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask others if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Imagine you have to audit other companies to see if they could have the same issues. These questions should start with: Do you ensure…………………? Confidential - Not to be shared outside of PDO/PDO contractors