INDOT UTILITIES AND RAILROAD DIVISION

Slides:



Advertisements
Similar presentations
FHWA Construction Updates David D. Platz, PE, PTOE Construction and Contract Administration Engineer US DOT - FHWA Wisconsin Division, Madison, WI FHWA.
Advertisements

MnDOT Metro District State Aid Construction Thursday February 19 th, 2015.
65 th Annual NDACE Convention Bryon Fuchs, P.E. NDDOT-Local Government.
Buy America Montana Department of Transportation Pat Ernst & Anson Moffett Construction Engineering Services Materials.
INDICATORS 11 AND 13 Bureau of Indian Education Division of Performance and Accountability WebEx October 18, 2011 DESK AUDIT.
ENVIRONMENTAL COMMITMENT COMPLIANCE. Mark Schrader – FHWA –Law and Process Review Findings Bill Bicknell – USFWS –Field Review Examples Sheri Lares -
General Services Division / Project Administration FINAL INSPECTION AND ACCEPTANCE “It ain’t over till it’s over.” (Yogi Berra)
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
North Dakota Association of County Engineers 2015 Annual Conference January 22, 2015 FHWA Update.
Car Service Rules – 1 thru 6 ACACSO Spring Meeting May, 2008 Chicago, IL.
Single Point of Contact (SPOC) MTC Workshop PRESENTED BY: Sylvia Fung District 4 Local Assistance September 2014.
Overview of the Federal Aid Process for Transportation Projects.
LPA – Utility Coordination Natalie Parks StructurePoint November 20, 2013.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
1 1 Roles and Responsibilities in the CDBG Program For Grant Administrators.
L OCAL A GENCY P ROGRAM : O VERVIEW 1. P RESENTATION O VERVIEW Program Overview Local Agency Certification Process Responsible Charge Program Operations.
CUI Statistical: Collaborative Efforts of Federal Statistical Agencies Eve Powell-Griner National Center for Health Statistics.
Louisiana Safe Routes to School Program Department of Transportation and Development Louisiana Safe Routes to School Program The Application.
Electronic Form Solution: RAF/2013/00020 Compulsory Briefing Session 23 July 2013 The Road Accident Fund.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
The American Recovery and Reinvestment Act of 2009 (ARRA) Federal Highway Administration Wisconsin Division January, 2010 Jason P. Spilak, PE, ARRA Engineer.
Effective Management and Compliance 1 ANA GRANTEE MEETING  FEBRUARY 5, 2015.
Federal Highway Administration Emergency Relief (ER) Program Brian Hogge Field Operations Team Leader July 2013.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
May 12-13, 2015 Orange Beach, AL.. Carry-over Requests Notice to Proceed Utilities on ATRIP Projects.
1 CDBG Roles and Responsibilities For Local Officials.
Procurement Division Procurement Reform Recommendation #19  “DGS shall authorize individual signature authority for contracting and procurement officials.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
Training Module 7. What You’ll Learn In This Module In what areas may Conservation Districts enter into a contractual agreement with Michigan Department.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Dick Wiechman, EPA region 7 Nebraska Project Officer Tribal Pesticide Program Manager.
WYDOT CLEARING UTILITIES Keri Bohlmann, P.E. Utilities & DSS Supervisor.
Uniform Grant Guidance Roundtable Discussion: October 5, 2015 Procurement 1.
Federal Lands Highway Commitment to Excellence Environmental Concerns with Estimating TEA/TUG Conference Portland, Maine October 2006 Jack Van Dop Eastern.
LPA Program Federal-aid Issues for Local Agencies Mike Morrow – December 10, 2010.
Sponsored Project Administration Fall 2012 CERTIFICATION PROGRAM Sponsored Project Lifecycle Introduction Overview Creating a Project Budget Compliance.
The Right Things to Know about Right- of-Way April 8, 2016 Tammy M. Keeley Realty Officer FHWA – AL Divisi on.
March 2013 CPO Training Jan Hall, Contracts Manager.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
EQUIPMENT CONTRACT RUS FORM 395
R/W LAP PROJECTS Presented by Ron Crew.
Section 508 Survived Year One, on to Year Two
2017 ACEA Annual Conference
FHWA Funding, Monitoring & Reporting
Financial Oversight of the Federal-aid Program Financial Integrity Review and Evaluation (FIRE) Program Mark Newland, Financial Manager FHWA Indiana.
Step 3: Legally Binding agreements and contracts
Electronic Form Solution: RAF/2013/00020 Compulsory Briefing Session
Understanding a Federal Audit
Traffic Control Plan Development Course
Acceptance Process for Manufactured Products by Certification:
Department of Community Development
Right of Way Process INTRODUCTION of subject and presenter.
Contract Management.
Buy America Good morning All:
National Environmental Policy Act of 1969
National Environmental Policy Act of 1969
Management Verifications & Sampling Methods
Utility Considerations on Transportation Projects
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
Presentation Title Goes Here
Agreements & Cost Estimates
Management Verifications & Sampling Methods
Driving Indiana’s Economic Growth
Buy America and Utility Work
First Steps to Project Management Tribal Track
The National Environmental Policy Act (NEPA)
Right of Way Certification
Steps to a Successful Solicitation and Contract: Food Service Management Companies for School Business Officials Bridget Ziniti, M.Ed. MA Department of.
Agreements & Cost Estimates
Presentation transcript:

INDOT UTILITIES AND RAILROAD DIVISION BUY AMERICA FOR UTILITY WORK

BUY AMERICA REGULATIONS Federal Codes 23 U.S. Code 313 https://www.fhwa.dot.gov/map21/docs/title23usc.pdf 23CFR 635.410 https://www.ecfr.gov/cgi-bin/text-idx?rgn=div5;node=49%3A7.1.2.1.18#se49.7.661_16 49 US Code 5323j https://www.gpo.gov/fdsys/pkg/USCODE-2011-title49/pdf/USCODE-2011-title49-subtitleIII-chap53-sec5323.pdf

WHAT IS BUY AMERICA? Buy America comprises the requirements to utility work accomplished as part of a Federal-aid highway program(FAHP) funded project as defined by the National Environmental Protection Act (NEPA).

BUY AMERICA

BUY AMERICA—WHAT IS COVERED Iron, steel or manufactured items Permanent structures Recycled steel is NOT covered

BUY AMERICA –CERTIFICATION OF COMPLIANCE The certification can be found in the UTA library template.

BUY AMERICA—CERTIFICATION REQUIREMENTS The certification form is Per 23CFR 635.410. The certification form of compliance/non-compliance form is required if Iron, steel or manufactured products are being procured.

BUY AMERICA UTILITY COORDINATOR’S RESPONSIBILITIES Evaluate material on a case by case to determine if Buy America applies. Ensure that Certification of Compliance is completed by manufacturer, signed by utility and manufacturer and delivered appropriately. Although the italicized language is in all Utility agreements, the Utility Coordinator must still follow the Buy America Certification requirements as well. The Utility agrees that all steel and cast iron materials and products to be used under this agreement will be produced and manufactured in the United States of America pursuant to the requirements of Indiana Code 5-16-8-1, et al, and 23 CFR 635.410.

BUY AMERICA CERTIFICATION OF COMPLIANCE The Certification document can be found in the UTA template library Utility Oversite Coordinator is responsible for turning the completed and signed form in to the Project Manager to ensure it is properly given to Project Engineer

BUY AMERICA CERTIFICATION PROCESS CHECKS AND BALANCES Mark the appropriate box on the Utility Agreement Routing form if Buy America Applies The Administrator will confirm that the certification has been turned in to the PM Copies of the Buy America Certificates should be uploaded by the Utility Oversight/Coordinator to the UTA for document retention

BUY AMERICA ADDITIONAL RESOURCES Construction Memorandum 17.04 FHWA Buy America Issues to Consider for Utility