Title : Alternative warm-up procedure WLTP rev1e by Japan

Slides:



Advertisements
Similar presentations
Explanation about three ways to obtain CD emissions in the present GTR and a proposal for the amendment E-Lab group WLTP-07-16e.
Advertisements

Current status of alternative warming up procedure Annex 4 § (OIL#19) WLTP-06-25e T. Yamaguchi, Japan
OIL#19 Alternative warm-up procedure (JAPAN proposal) 14th of January, 2015 WLTP rev1e.
Working Paper No. WLTP-09-07e 1 Agenda item 5: Progress report on Downscaling / Gearshifting (OIL #4-9) by H. Steven th WLTP IG meeting, 14.
Applicability of Driving Index
WLTP rev1e BMW, Christoph Lueginger WLTP Road Load Family
Status Report of the WLTP coasting Task Force Author: Thomas Vogel (chairman) WLTP IG, 9 th meeting, Geneva, Jan 2015 WLTP-09-15e.
WLTP-11-12e Christoph Lueginger (BMW), Céline Vallaude (UTAC), Folko Rohde (VW) on behalf of Annex 4 taskforce wind tunnel method road load.
Determination of System Equivalency – TaskForce Audi, EA-52, V4.0 WLTP-10-33e.
Default Road Load issue Initial Dutch proposal for a Update Progress report Annex 4 Open Issues: WLTP-07-07e 5. Default road load parameters (OIL.
WLTP-08-19e BMW, Christoph Lueginger WLTP Road Load Family
CoastdownVH&C Onboard Anemometry Ford Motor Company North America WLTP-11-14e.
Progress report of e-Lab sub-group (WLTP rev1e)
WLTP Phase 1B Main Open Issues Road and Dyno Load Presentation at WLTP IG Meeting Geneva Open Issues Road and Dyno Load- K. Kolesa Working paper.
WLTP OIL #6, annex 2, sections 3.2 and 3.3 Determination of engine speeds, calculation of available power.
Status report of WLTP Sub Group EV EVE 14. At WLTP IWG 10 Adopted open issues.
WLTP Annex 4 and 7, delta cd*A
1 WLTP Open Issue Phase 1B Issue: Number of testsOIL#27. Starting note for IWG Meeting#7 Geneva, WLTP rev1e.
Determination of System Equivalency – Starting note for WLTP IWG Meeting #8 in Pune, India Audi, EA-52, V2.0 WLTP-08-09e.
Renault statements and questions: Page Autor/Abt.: ACEA WLTP EV Group /Samarendra Tripathy 1] Phase specific calculation (appendix YYY of attached.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
WIND TUNNEL METHOD Christoph Lueginger (BMW), Céline Vallaude (UTAC), Folko Rohde (VW) on behalf of Annex 4 taskforce CHASSIS DYNO PRESCRIPTION.
WLTP Vehicle range and energy consumption EVE October 2014.
Status report and Discussion paper for Number of tests at WLTP Tokyo IWG in 2015 JAPAN WLTP-12-15e.
WLTP ANNEX 4 AND 7, DELTA CD*A BMW, Christoph Lueginger, Thomas Schütz ALTERNATIVE DETERMINATION METHODS WLTP-10-21e.
WLTP gtr Annex 9 Determination of Method Equivalency - Progress Report
Dual-axis dyno Taskforce Status Report WLTP-IWG meeting April 2016 Iddo Riemersma (T&E) Christoph Lueginger (BMW) WLTP-14-04e.
TF#4 – Mechanical Integrity Approved Japanese proposal for addition of vehicle mechanical protection structure into mechanical integrity requirement. EVS-11-17e.
(After the EPPR telephone conference on 11/May/2016)
Starting notes for Annex 4 Phase2a Issues
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-043
Improvement of Wind tunnel Measurement Process Status report
WLTP – supplemental test for correction to regional conditions
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-043
CO2 and pollutant emissions LDV
Regulation series WLTP-24-03e_Appendix 4
Drafting Subgroup Meeting Part of IWG #16, The Hague, October 2016
Improvement of Family definitions
Proposal for a mid vehicle concept
Input on wind tunnel criteria discussions
WLTP Annex 8: OVC-HEV:
WLTP-DTP-LabProcICE-229
Feed-back approach on RLD
Draft WLTP Phase 2 – carryover from 1b – Annex 4 Starting note on split runs in coast down testing WLTP-14-18e Within phase 1b, practically all tolerances.
Handling of wind tunnel + chassis dyno method for RLD
Comments on WLTP documentation
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 1/2/2019.
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 1/2/2019.
Submitted by the experts of OICA
01 General requirements Road load matrix family vehicle definition 02 Annex 4 Wind tunnel for road load matrix family 03 Annex 6 CO2 interpolation range.
test limits for correction coefficient determination
WLTP Validation2 for RLD ~ Validation test plan by Japan ~
Correlation Improvements
GTR 15 clarification on 3g family extension rule renault
Vehicle warm up and stabilisation – RLD and dyno
HDV CO2 certification CoP provisions
WLTP-24-03e_Appendix 3a Transposition of GTR15 (WLTP) and GTR19 (Evap) into UN Regulations Update from WLTP Transposition Task Force September.
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 February 5, 2015.
Full load curve proposal
ACEA Comments from ACEA welcomes the idea to develop a shortened range test procedure based on MCT However, ACEA does not support JP proposal.
COP procedure for Europe
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 6/10/2019.
Progress report of Sub Group EV (WLTP-12-19e) 1
8th all TF F2F Meetings EVS Washington DC
Problem with Rcda and suggestions for them
Status Report of New Issues TF –CFD* sub wg
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 8/20/2019.
Working Paper No. WLTP-05-10e
OIL# 52: End of PEV range criteria
UNECE WLTP COP task-Force Revision on testing Frequency
Presentation transcript:

Title : Alternative warm-up procedure WLTP-08-29-rev1e by Japan OIL# 19 Title : Alternative warm-up procedure  WLTP-08-29-rev1e by Japan Brief description EU manufacturer claimed that current WLTC based warm-up procedure takes too much time so alternative warming up method should be set. On the other hand, inappropriate alternative warm-up procedure may cause flexibility (i.e. transferring road load at low temperature vehicle condition etc.) . Hence the alternative procedure should be evaluated with a equivalency to the WLTC based warm-up cycle. Initial proposal The cycle and method of an alternative warm-up procedure should be based on each manufacture’s recommendation. The manufacturer shall show its equivalency to WLTC warm-up result to get approval by Responsible Authority in advance. When the manufacturer uses the alternative warm-up procedure, detail test condition should be reported. Vehicle representing the family defined in (3) shall be selected in the verification of equivalency and meet the criteria as below. The cycle energy demand of each applicable phases calculated according to paragraph 5 of Annex 7 of the dyno set road load value obtained by alternative warm-up procedure must be equal or higher than that of WLTC warm-up procedure. Alternative warm-up procedure family shall adopt the Road Load family.

Case 1:  Whole WLTC cycle -> Worse case Specific phase -> Better case -> Alternative is NOT allowed Case 2:  Whole WLTC cycle -> Worse case Specific phase -> Worse case -> Alternative is allowed Low /Mid phase are better case. All phases are worse case.