Brunswick Landing Microgrid Development

Slides:



Advertisements
Similar presentations
NAS Brunswick Story Steve Levesque, Executive Director, MRRA September 26, 2013.
Advertisements

EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
How Technology will make Renewable Energy Competitive 10/17/2013
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Microgrid – A Smart Grid Alternative Service Delivery Model? Thomas.
Energy Financing for Municipalities Andrew Brydges Director, Institutional Programs Clean Energy Finance and Investment Authority (CEFIA) April 2014.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
On August 22, 2005 the Federal Base Realignment and Closure (BRAC) Commission voted to close Naval Air Station Brunswick (NASB) NASB is a 3,200 acre property.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Building Maine’s Clean Tech Corridor.  Background  Concept and Vision  Role in Maine’s Clean Tech Corridor  Summary.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
WHY DO I WANT A MICROGRID FOR MY COMMUNITY, CAMPUS, OR TRANSIT SYSTEM? GPAEE GLOBALCON Luncheon March 18, 2015.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 “To BRAC or Not to BRAC” What happens if there is not a BRAC? ADC.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
American Electric Power (AEP) Virtual Power Plant Simulator (VPPS) Tom Jones, Manger – Corporate Technology Development American Electric Power Grid-InterOp.
Creating Energy-Efficient Data Centers
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Renewable Energy in New Jersey’s Clean Energy Program Scott Hunter Renewable Energy Program Administrator, Office of Clean Energy in the New Jersey Board.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Power Magazine Visuals © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. June 28, 2012.
. Wind Energy and Economic Development The Texas Industry Cluster Initiative Advanced Technologies & Manufacturing Aerospace & Defense Biotechnology &
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
BNL’s Grid and M icro-Grid Efforts and Capabilities Patrick Looney Chairman, Sustainable Energy Technology Long Island Solar BNL.
Federal Energy Management Program Key Provisions of Current Legislation Renewable Working Group September 10, 2002 Nancy Carlisle NREL.
MAY | 12 | 2010 Cape Cod Comprehensive Economic Development Strategy (CEDS)
December 2008 Sandia Advanced Microgrid R&D Program Advanced Microgrids – Supporting Use of Renewable, Distributed, and Smart Grid Technologies for Assured.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
Andrew Gonzales, Public Information Officer Kit Carson Electric Cooperative, Inc. KIT CARSON ELECTRIC COOPERATIVE, INC.
Smart Grid Schneider Electric Javier Orellana
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
More Than Smart – A Distribution System Vision © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Dave Geier – VP Electric.
Page 1© 2010 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 China’s Strong Smart Grid – An Area China Will Excel Presented at Harvard China.
Integrated Resource Planning with Market Engagement Symposium on Energy in the 21 st Century Dennis Elsenbeck April 8, 2016.
BGE Smart Grid Initiative Stakeholder Meeting September 17, 2009 Wayne Harbaugh, Vice President, Pricing and Regulatory Services.
Renewable Distributed Generation and Public Water Supply Utilities CWWA/CTAWWA Fall Conference Paul R. Michaud, Esq. October 20, 2015.
Clean Power Purchasing Meeting April 24, H OW S UPPLY D E - CARBONIZATION F ITS I N City Deep Decarbonization Goals Electricity and Combustion Emissions.
JEA’s Initiatives and Capital Improvements Program
Progress Briefing - Energy Initiative
Sustainable Future – Trends and Reality
Irvine Ranch Water District Distributed Energy Storage Case Study
VEHICLE ENERGY SYSTEMS
Distributed Energy Strategy - Solar PV
Phase 3 Solar Feasibility Study Findings and Recommendations
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Microgrids and Energy Storage for Smart City Planning
The Transition to a High DER Future
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 North America Microgrid Market.
Kosrae State Energy Action Plan Update
Smart Grid Wyatt Kroemer.
Opportunities in the Changing Energy System
Energy, Finance, Partnerships: Transforming Clean Business
Irvine Smart Grid Demonstration Distribution Volt / Var Control
Smart Grid Projects NSTAR
Reforming the Energy Vision in New York State
2500 R Midtown Sacramento Municipal Utility District
ENCLAVE POWER COMPANY LIMITED
Montecito Community Microgrid
City Council April 30, 2018 Item 13
The Green Communities Act: WMECO perspective
Metropolitan Mayors Caucus Illinois Energy Bills
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Tennessee Valley Authority – Energy Initiatives and Challenges
Solar Energy Commercialization
Meeting the challenge: Electrification and Climate Change
Puerto Rico Electric System Challenges Ahead
Brunswick Landing Microgrid Development
Opportunities for Local Energy
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
Presentation transcript:

Brunswick Landing Microgrid Development September 6, 2017

Microgrid Development Brunswick Landing Microgrid Development Background The Concept Brunswick Renewable Energy Center and Microgrid The Reality Electrical Distribution System – Existing Conditions Services provided by MRRA “Volume” of operations Distributed Generation Deployment The Way Ahead

(former NAS Brunswick) Brunswick Landing NAS Brunswick was 3,200 acre military enclave within Town of Brunswick Closed as part of FY 2005 Federal Base Realignment and Closure (BRAC) Navy ceased operations in May 2011 Navy transferred utility systems to MRRA on 30 September 2011 Midcoast Regional Redevelopment Authority (MRRA) public municipal corporation created by State of Maine (5 MRSA §13083-G) to manage transition to civilian uses, redeveloping base properties and attracting new, high quality jobs Brunswick Landing (former NAS Brunswick)

Brunswick Landing Background Brunswick Landing envisioned to be a science and technology park in a campus setting with: Centers of excellence in advanced technologies Regional Executive Airport Business-focused educational facilities Renewable Energy development Opportunities for high quality job creation in: Aviation and Aerospace Energy Composite Technologies Information Technology Biotechnology and Biomed Education

Brunswick Renewable Energy Center Brunswick Landing Brunswick Renewable Energy Center MRRA’s Reuse Master Plan for Brunswick Landing calls for: Developing a Renewable Energy Center Focusing on clean tech industries The creation of a Renewable Energy Center will: Help establish and grow a new clean tech cluster around renewable energy Combine energy technology business operations with on-site, alternatively-fueled energy production Allow new technologies to be developed, manufactured, and deployed on our smart microgrid (“live” environment) for test and evaluation

Microgrid Development Brunswick Landing Microgrid Development Key to Renewable Energy Center is development of: on-site, alternatively-fueled, Distributed Generation (DG) dynamic, “smart” microgrid that allows deployment of new technologies as they evolve As upgrades are made to the existing distribution system “smart” technology will be incorporated as appropriate MRRA is exploring strategic partnerships to assist with microgrid implementation

Microgrid Development Brunswick Landing Microgrid Development Business Attraction and Business Retention Reliable and resilient power supply Lower cost “green” energy generated on-site Ability to manage demand charges and capacity charges Smart grid technology development and deployment in a “live” environment

Brunswick Renewable Energy Center Brunswick Landing Brunswick Renewable Energy Center Feasibility Assessment funded by grants from EDA, MTI, and EPA and completed in 2013 determined: Existing utility infrastructure will support a Renewable Energy Center (with some upgrades) NREL identified viable renewable energy generation technologies An analysis of existing electrical distribution systemby Power Systems Engineering completed in May 2014 found: Facilities are “generally … in good condition” Excess capacity available on system Excellent voltage levels even during peak conditions

Electrical Distribution System Brunswick Landing Electrical Distribution System MRRA is presently operating the electrical distribution system as an “unregulated grid” (like a mobile home park) Point of Common Coupling (PCC) 34.5kV distribution circuit on Route 24 (Gurnet Road) One master meter for all of Brunswick Landing Fed from Cooks Corner Substation Internal Distribution From PCC, comes aboard at 34.5kV overhead to MRRA’s main distribution center (4 pole mounted reclosers) Serves everything east of the runways and Building 231 Primary distribution voltage is 34.5kV (with some 4.16kV) on 4 internal distribution circuits (mostly overhead)

Electrical Distribution System Brunswick Landing Electrical Distribution System System consists of: Over 15 miles of overhead conductors Over 200 utility poles 4 pole-mounted Siemens SDR reclosers with controls 80 pad-mounted transformers ranging between 34.5 kV and 1500 kV and 50 pole-mounted transformers Over 275 fuse cutouts 4 manual Gang Operated Air Break Switches (GOAB) 3 manual pad-mounted oil switches 104 “smart” meters No Network Operations Center or SCADA system No Microgrid Controller or Distribution Automation

Electrical Distribution System Brunswick Landing Electrical Distribution System

Electrical Distribution System Brunswick Landing Electrical Distribution System Services Provided Power Purchase Electricity Delivery including: metering billing Maintenance, Repair, and Operation including: Vegetation management Wildlife deterrence Outage recovery Capital Improvements Service Extensions/Upgrades Integration of Distributed Energy Resources (DERs)

Electrical Distribution System Brunswick Landing Electrical Distribution System Current Operations Delivering electricity to over 125 customers/buildings MRRA including: data center medical device manufacturer senior living facility memory care facility college campus including a dormitory 163 single family housing units general aviation airport Average total monthly consumption is over 1,400,000 kWh with a peak demand in September 2016 of 3.5MW

Electrical Distribution System Brunswick Landing Electrical Distribution System

Electrical Distribution System Brunswick Landing Electrical Distribution System Electricity Purchase 100% of the electricity delivered to Brunswick Landing is generated by “green” sources About 80% is Green-E certified and purchased from Constellation NewEnergy (wind-generated) at a fixed price per kWh plus capacity charge About 20% is purchased under a PPA with Village Green Ventures from their one megawatt anaerobic digester generator MRRA is an EPA Green Power Partner Delivery Service Delivery from CMP is under LGS-P-TOU rate tariff

Electrical Distribution System Brunswick Landing Electrical Distribution System

Distributed Generation Deployment Brunswick Landing Distributed Generation Deployment 1 MW anaerobic digester currently operating at south end of parking apron 1.5MW dc solar PV project under development at north end of the airfield Currently operating under Level III Interconnection Agreement

Village Green Ventures Brunswick Landing Distributed Generation Deployment Village Green Ventures 1MW Anaerobic Digester Village Green Maine owns and operates the 1 MW anaerobic digester MRRA purchases 100% of generated electricity under PPA Facility went operational in April 2016 Plant receives waste from municipal and commercial sources including wastewater treatment sludge, septage, and some other organic wastes System not yet at full capacity Currently provides about 20% of campus requirement

Distributed Generation Deployment Brunswick Landing Distributed Generation Deployment Project currently in development ReVision Energy will own and operate the 1.5 MW dc PV array MRRA will purchase 100% of generated electricity under PPA Facility expected to go operational in December 2017 Estimated output over 1.9 million kWh per year

Microgrid Development Brunswick Landing Microgrid Development Partnership with Introspective Systems Phase II/III Small Business Innovation Research grant : “Fractal Graph Framework for an Evolving Grid Architecture”. Will develop model of electrical distribution system at Brunswick Landing utilizing Fractal Grid Architecture First step in developing a “smart” microgrid at Brunswick Landing that will: be fully autonomous control system with self-balancing load and generation allow seamless integration of new distributed energy resources lower costs and increase alternative energy utilization provide “plug and play” infrastructure giving companies at Brunswick Landing a research and demonstration platform for new energy-related technologies

Brunswick Landing Summary The vision of the Brunswick Renewable Energy Center is becoming a reality Our studies have concluded the Renewable Energy Center concept is viable and development of a smart microgrid is achievable Brunswick Renewable Energy Center has already begun attracting clean technology businesses with the potential to create new and sustainable “green” jobs: Village Green Ventures – 1 MW Anaerobic Digester ReVision Energy – 1.5 MW dc PV Solar project Introspective Systems Future development will likely require creation of strategic partnerships Long way to go, but we are on the way!