BI/Vacuum Mechanical design

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Requirements Structure and Status for NCFE
Large Colimator Study EAR2 Christina Weiss, CERN.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Report from Task Force on Beam Instrumentation Stephen Molloy.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Beam Wire Scanner for PS/SPS/PSB Mechanical 3D Model Review (for BE/RF-ABP Impedance meeting 02.Nov.2015) Dmitry Gudkov Mechanical Engineer BE/BI-ML.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
ESS wire scanner Benjamin Cheymol
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Mitigation Devices External Interface ICS Nick Levchenko Lund Date:
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
ESS Front End diagnostic
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
Status of Primavera (P6) Accelerator Plan & an Introduction to the Accelerator Installation Plan Luisella Lari Head planner for Accelerator & Senior Scientist.
European Spallation Source Diagnostics Challenges Lali Tchelidze AD retreat, Lund, Sweden,
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
Chris Gavanas 31/08/2016 Summer Student Report.
Instrumentation for Accelerators Technologies for the HL-LHC
Updated with comments 22 may 2017 Updated again 29 June 2017
6th BINP-GSI-FAIR workshop
MECHANICAL ENGINEERING OF ACCELERATOR COMPONENTS
Proton Source and LEBT Luigi Celona & Lorenzo Neri
LINAC4 LEBT beam size and emittance diagnostics
Tom Shea Front End Meeting Catania
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Magnetic gap calculation
LINAC4 commissioning plans etc.
Andreas Jansson, Lali Tchelidze
Preliminary Study – Radiation induced activity in a SB Target
Considerations on Beam Diagnostics Physics
ESS Project Status Roland Garoby – Technical Director August 2018.
Status of Control Services ICS WP10 (accelerator integration work package) Tuesday 20th November
Ciprian Plostinar Workshop on Testing and Commissioning
ISRC and LEBT Vacuum System Design
THE STATE OF BEAM DIAGNOSTICS
LCLS Undulator System Status and Schedule
MEBT FC, WS, SC and EMU Status
MPS commissioning at ESS
PSS Verification and validation
Tom Shea, Andreas Jansson, Cyrille Thomas
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
DTL Faraday Cups Mechanical Design
Tasks, Responsibilities Expectations and Needs
APTM and GRID interface requirement PBIP and PBW
LCLS Undulator System Status and Schedule
European Spallation Source ERIC
Cables, Racks, and the rest
APTM and GRID Beamline Elements
High Level Readiness Reviews
Accelerator Installation Schedule
Target Safety System Interfaces
East Hall under construction
Overview of the TARGET Monolith Rough Vacuum
Procedure for MEBT installation in the accelerator tunnel at ESS
22-SAR MEBT Vacuum test Aitor Zugazaga Zamudio, 27 March 2019.
General Overview of WP 12 ESS Vacuum System
Project Support Meeting January 9, 2019
Presentation transcript:

BI/Vacuum Mechanical design Presenter name Presenters title www.europeanspallationsource.se 7 August, 2019

Mechanical Design (future/current) Beam instrumentation LEBT NPM DTL Faraday cups Spoke beam stops Medium beta beam stops Tuning dump instrumentation (imaging/aperture monitors) PBIP instrumentation (grid, aperture monitor) NSW instrumentation (aperture monitor) Stub integration LWU Patch panels MPS retrofitting BLM supports Vacuum WP12 Lattice/Catia skeleton Neutron guide inflatable seals Coating chamber (ceramic seals, etc) QA, metrology NSS vacuum infrastructure Target vacuum infrastructure Dump/NSW to PBW

Support A PLM/Engineering: Simulation group: There must be a system/database in the future which allows programmatic (RESTFUL) access to data or else it will not be adopted by other groups This will benefit ESS in the long run Simulation group: In the immediate to near-term future there is a strong need for simulation expertise/CPU cycles! Have already organized a workshop with Jonathan and Emil for Fluka training There are numerous insertable devices and areas in the tunnel which strongly need attention in order to mitigate damage and dosage calculation Devices include Faraday cups, beam stops, scrapers, aperture monitors, imaging systems Mechanical design: There is an immediate need for at least 50-100% of a designer’s time for the next few months/year, for work related to vacuum and beam instrumentation

Support B/EPL Skeleton Dmitri (fast wire scanner engineer): We will have a mechanical engineer in house in the beam instrumentation group for 1 month soon, he is from CERN and knows how to do Catia macro programming If there is anyone who has needs or questions from someone who has a deeper understanding of Catia macros, or has an existing macro that needs to be modified, it may be a good opportunity. EPL Lattice/Skeleton There are currently two ECOs waiting to be approved by Mamad Catia skeleton insertion points for the HEBT/DogLeg/Tuning beam dump/A2T areas Catia skeleton optical/BPM points

Tommy recent work (one example) FLUKA ANSYS 𝐴𝑒 −𝐵𝑥 +𝐶 python

Thanks! :-)