AECS sled testing (NAMI’ testing centre)

Slides:



Advertisements
Similar presentations
Source: GSM Association, 2010 Mobile Networks. Source: GSM Association, Coverage and Capacity Mobile communications networks are designed for both.
Advertisements

Installation of. Congratulations for choose this GSM car alarm system for your car. Taking a few minutes to watch this Installation Guide and read the.
COM1: Characteristics and Components of the AN/PRC 77 Set JWT v1 /03.
GS3055-I GSM Universal Wireless Alarm Communicator
Current idea in IG AECS to demonstrate AECS functions after (R94,95) crash tests. -Situation is not the same for all OEM’s -Countermeasures listed above.
Proposals for homologation of AECD and Installation in vehicle DRAFT status
1 Business Development (Service). What is DTH How DTH works How DTH works Type of DTH Connections Type of DTH Connections Advantages of DTH Advantages.
1 Sutron Corporation Portable Visibility Unit (PVU)sutron.com Portable Visibility Unit (PVU) 1/13/14.
NCGS: Positioning NC today and for the future! North Carolina Geodetic Survey Maintenance of a CORS/RTN infrastructure.
Location of risk in the supply chain
German point of view Results of the national meeting of German experts Automatic Emergency Call Systems.
By J DAVID MANOHAR (08A31A0232). NECESSITY OF SUPERCONDUSTOR  Damage from short circuit is constant threat in power systems  All the power systems components.
GS3055-I GSM Universal Wireless Alarm Communicator
Progress report of GRSG informal group on Accident Emergency Call System (AECS) Transmitted by Chair of the AECS IWG Informal document GRSG
GS3055-I Installation Process
Draft progress report of GRSG informal group on Accident Emergency Call System (AECS) Transmitted by chair of IWG AECS Informal document GRSG-106-ХХ 106.
© 2007 Ideal Industries 1 of 12 Basics Clamp-on Ground Resistance Tester.
(社)日本自動車工業会・安全部会 1 1 (C) Copyright Japan Automobile Manufacturers Association, Inc., All rights reserved. Proposal for demonstrate procedure of AECS functional.
Progress report of GRSG informal group on Accident Emergency Call System (AECS) Transmitted by the Chair of AECS IWG Informal document GRSG
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
OTS / Lifeguard ® Install Tutorial © 2015 Cochran Consulting, Inc. Introduction System Overview Lifeguard D1 Connection Lifeguard Pickup Install Cochran.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
4.2.1.Position determination Proposed modifications AECS 12 nd. meeting Moscow, 9-11 February 2016.
4.2.1.Position determination Proposed modifications AECS 12 nd. meeting Moscow, 9-11 February 2016.
Non Paper regarding component approvals UNECE AECS.
Circuit Symbols I have used a range of electrical components to help to make a variety of circuits for different purposes. I can represent my circuit using.
Sniffer for Detecting Lost Mobiles
Kubus IP65 Exit sign luminaire. IP65 Higher degree of protection Indoor application shopping centers restaurants Outdoor application parking areas exhibitions.
OICA IWG AECSFEBRUARY 2016 AECS REGULATION POST-CRASH CHECK WITH HMI METHOD.
OICA IWG AECSAPRIL 2016 AECS REGULATION POST-CRASH CHECK WITH HMI TEST METHOD SUMMARY -ASIL determination – ISO Pre-requirements for HMI test method.
独立行政法人交通安全環境研究所 National Traffic Safety and Environment Laboratory Feasibility and Repeatability of the Sled Test in AECS-Annex 7 12 th AECS meeting
Equipment Definitions
AECS Accident Emergency Call System
Communication For Ground Team Leaders
平成30年6月 November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Technical requirements for 950MHz.
Functional Area 1: Overview
Living in a Network Centric World
Living in a Network Centric World
Demand on Roaming for WUR
Practical Guidelines for Using CRO
Leadership definitions
Oracle Solaris Zones Study Purpose Only
Chapter 31 Battery Systems.
Project Specification
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Practical Guidelines for Using CRO
RFID operating principle
LIFEPAK® 1000 Defibrillator Orientation Guide
Chapter 7 - Management.
Cochran Consulting, Inc.
Living in a Network Centric World
How Computers Work.
What is Social Studies? Key Definitions.
平成30年12月 November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Technical requirements for 950MHz.
Living in a Network Centric World
SL029/18 – FTNx Communications Failure
Living in a Network Centric World
Living in a Network Centric World
A. Talk louder into the microphone B. Let the transceiver cool off
Living in a Network Centric World
Living in a Network Centric World
Progress report of GRSG informal group
Cochran Consulting, Inc.
Living in a Network Centric World
Guide to Computer Forensics and Investigations Fourth Edition
​នាយកដ្ឋានធានាគុណភាពអប់រំ
OBD2CG OBD2 Phase 1 consolidated draft
LED Rubik’s Cube Team 54: Meghan LeMay & Michael Rupp TA: Bryce Smith.
Living in a Network Centric World
Presentation transcript:

AECS sled testing (NAMI’ testing centre) Sled testing conditions: the following components of AECS, necessary for MSD triggering and establishing two- way voice communication were tested: control module, communication module (including microphones and loudspeakers), network and GNSS antenna, GNSS receiver); AECS components were connected to the test fixture by the intended mountings provided for the purpose of attaching the AECS installation; AECS was connected with the main battery (AECS’ back-up power supply was disconnected).

AECS sled testing (NAMI’ testing centre) Sled testing results: MSD has been transmitted; two-way voice communication was established immediately after the test and after 60 minutes in call-back mode (5-60-5 test) there were no visible damages of the main battery and AECS components; peak decelerations were between 67g and 70 g; Annex 7 deceleration corridor was no achieved at the lower boundary (the higher level of deceleration can be provided but the test result could exceed the upper level) at the NAMI’ sled test equipment Proposal: to reduce the lower limit to 60 g. Acceleration/Deceleration (g) Time (ms) Peak deceleration: 67,7g