Director of Water Engineering

Slides:



Advertisements
Similar presentations
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Advertisements

City of Oshkosh Water System. Public Works Utility Division Water Filtration Plant Water Distribution System Wastewater Collection System Pumping Stations.
Charlie Lake Sewer Collection System & Lagoon Upgrades Thursday June 20 th, 2013.
MARCH 20, 2013MARCH 20, HIGHLIGHTS OF 2013 CAPITAL BUDGET Roads, Sewers, Transportation, Parks and Recreation, Other.
MARCH 2015MARCH HIGHLIGHTS OF 2015 CAPITAL BUDGET Roads, Sewers, Transportation, Parks, Miscellaneous, Special Projects.
Garden City Urban Renewal Agency  Independent public body serving the city of Garden City  Established by the City Council in 1995  Currently has one.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
1 Chatham-Kent Windsor Heavy Construction Association Capital Works Budget Presentation Wednesday, March 20, 2013 Current tender opportunities can be reviewed.
The City of North Bend Sanitary Sewer System
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
CE 3372 Water Systems Design
Learning with Purpose CAP Steering Committee Energy Project ID Two Important Initiatives 4/28/2014.
2016 BUDGET OVERVIEW SANGER, TEXAS. BUDGET PHYLOSOPHY Conservative revenue estimates based on history. Expenditures based on history and anticipated cost.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
Water System Planning Study
The Corporation of the Town of Amherstburg Public Works Department March 21, CAPITAL BUDGET.
Facilities Maintenance Department LtCol Todd A. Kerzie Facilities Maintenance Officer (760) 725 – 3807 Mr. Jeff Hunt Maintenance Control Director Marine.
City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City of Palo Alto Finance Committee May 19, 2009 Public Works Department- Enterprise Funds.
Town of Tecumseh 2012 Capital Works Projects. Road Projects ProjectBudget Road Paving Projects……………………..$850,000 – Asphalting – tar & chip – crack sealing.
The Corporation of the Town of Amherstburg Public Works Department 2013 CAPITAL BUDGET Presented to: The Heavy Construction Association March 20, 2013.
Windsor Utilities Commission Capital Plan Spencer Johnston Enwin, Water Engineering 2.
Presented by Barry S. LaRoy, P.E. Director of Water and Wastewater Utilities March 31, 2014 Monroe City Hall 1.
Windsor Utilities Commission Capital Plan
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,
C learbrook W aterworks D istrict 2564 Clearbrook Road, Abbotsford.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Proposed Retail Rate Change Effective January 1, 2008.
CE 3372 Water Systems Design Lecture 005: Engineering Drawings.
DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
What are they and how are they calculated? May 2015.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
City Council March 6, Capital Outlay Priorities Infrastructure  Reconstruction of Bell St. from Concho River to Old Ballinger Hwy  Reconstruction.
Zero Net Energy (ZNE) Facilities Design Presentation to California State Lottery Commission November 20, 2014 Director’s Report 7c.
Approval of FY-2016 Capital Budget and the 10-Year Capital Plan February 11, 2015.
Windsor Utilities Commission Capital Plan 2016 Presented by Spencer Johnston.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
CSA 7 – Boulder Creek. YOUR SANITATION FACILITY Facility Includes the Following Five Pump Stations –Total of 10 pumps 16,553 feet of collection lines.
Grey Owl Municipal Water feasibility study
Asset Degradation Modelling at Townsville Water
ACEC Presentation September 22, 2016
Water Filtration Plant Improvements Project Summary
WATER – WASTEWATER TREATMENT EXPERIENCE
PUBLIC WORKS 2017 PRELIMINARY BUDGET
MSD Project Clear Overview and FY2017 Construction Capital Improvement and Replacement Program - Preliminary March, 2016 Rich Unverferth Director of.
JEA’s Initiatives and Capital Improvements Program
Wakefield’s Financial Picture Finance Committee
Water and Wastewater Rates
UTILITIES MANAGEMENT.
Environmental Services
RUSSELL - ROSSBURN WATER SUPPLY
Community Services Infrastructure Development
ACEC Presentation September 22, 2016
Water Department has Six Divisions
FEE INCREASES Public Work Shop June 2, 2018.
WATER DEPARTMENT BUDGET WORKSHOP
Commission Workshop 3 Budget Presentation
City of Spruce Grove Capital Region Partners Presentation 2019
Capital Improvement Plan April 9, 2018 Status Update
Dollars and Cents: Ways to Save and be More Resourceful
Presentation transcript:

Windsor Utilities Commission Capital Plan 2018 Presented by Norbert Poggio

Director of Water Engineering Norbert Poggio, P.Eng Director of Water Engineering

CAPITAL BREAKOUT 2018 2018 Capital Breakout New Reservoir Project   New Reservoir Project $5,088,000 Watermain Projects $16,206,000 Metering Projects $2,592,000 Water Treatment Facilities $2,023,000 Transmission and Distribution Projects $571,000 Engineering Projects $28,000 Vehicles $339,000 Water Capital Subtotal $26,847,000 District Energy Projects $50,000 Total WUC Capital $26,897,000

WUC CAPITAL SPEND

SYSTEM RENEWAL PROGRAM PROPOSED 2018 WATERMAIN SYSTEM RENEWAL PROGRAM GRAND TOTAL $16.206 Million 2018 WATERMAIN RENEWAL PROGRAM TOTAL SEWER / ROAD PROJECTS $ 2.764 Million TOTAL ROAD OPERATIONS PROJECTS $ 4.665 Million TOTAL WUC PRIORITY PROJECTS $ 8.777 Million TOTAL MAJOR ROAD PROJECTS $ 0.0 Million

WINDSOR UTILITIES COMMISSION WT/DEW/DISTRIBUTION/METERING Water Treatment - $2.023M Intake screens, intake macerator, flow meters, heat pump , chlorine header, ozone generator, high lift pump rehab, replace chemical systems, LL pump vacuum system, asbestos remediation. District Energy Windsor - $50K Replace heat exchangers and control valves (aging ETS equipment) Valve replacement Water Distribution - $571K Maintenance of hydrants, valves and services Water Metering – $2.309M Continuing to replace/install water meters Water Engineering - $28K Miscellaneous software and equipment upgrades / repairs.

WINDSOR UTILITIES COMMISSION NEW RESERVOIR 2018 - $5,088,000

WINDSOR UTILITIES COMMISSION SCHEDULE - NEW RESERVOIR Winter 2017/Spring 2018 Continued construction. Summer 2018 Commissioning of New Reservoir Winter 2019 Rehabilitation of Existing Reservoir

Questions??