Harmonisation Activity Progress report

Slides:



Advertisements
Similar presentations
The European Eutrophication Activity and the UWWT and Nitrate Directives Ana Cristina Cardoso.
Advertisements

1 FUTURE STESEG WORK - CURRENT AND NEW PROJECTS - FUTURE STESEG WORK - CURRENT AND NEW PROJECTS - SHORT-TERM ECONOMIC STATISTICS EXPERT GROUP (STESEG)
International Standards and Regional Regulations.
ECOSTAT WG2A meeting 7-8 October 2004 Eutrophication Activity Status report Presented by Ana Cristina Cardoso.
WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
Progress report of the Working Group on the Value and Benefits of SAIs (WGVBS) 5 th meeting of the INTOSAI KSC Steering Committee 16 September 2013.
European Commission - DG Environment Unit D.2: Water & Marine 1 Need for continuous exchanges on chemical monitoring issues, in the light of the on-going.
STD/PASS/TAGS – Trade and Globalisation Statistics STD/SES/TAGS – Trade and Globalisation Statistics Item 18a Progress and Planned Revision Timetable for.
WG2A meeting 7-8 October 2004 Working Group 2A ECOSTAT Agenda item 9b Discussion on final Intercalibation register.
Updating the intercalibration process guidance Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Task on Harmonisation of Freshwater Biological Methods
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
IC network selection process
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Improving assessment of GES Draft conclusions and Way forward
Review of Decision 2010/477/EU and MSFD Annex III
Draft Commission Decision on Intercalibration
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
Review of Decision 2010/477/EU and MSFD Annex III
Chemical Monitoring Activity (CMA)
Working Group 2A ECOSTAT Intercalibration process - state of play Wouter van de Bund & Anna-Stiina Heiskanen Joint Research Centre Institute for Environment.
Task on harmonization WFD Annex V 1.3.6
Harmonisation Activity Progress report
Author: DG Environment Presented by Ana Cristina Cardoso
Common Implementation Strategy for the
Chemical Monitoring Activity (CMA) ( )
Update on progress since last WG meeting (13-14 June 2002)
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Jørgen Friis, ETSI VP SES
Working Group A Ecological Status - ECOSTAT State of play in the intercalibration exercise Water Directors Meeting, November 2005.
on a protocol for Intercalibration of Surface Water
Draft Mandate and Proposed Approach for the Drafting Group on
Agenda Item 10: Feedback on dangerous substances workshop and Implementation Guidance WG-E(1)-07/04/INERIS - Implementation guidance.
Hans Dufourmont Eurostat Unit E4 – Structural Funds
WG GES: Decision review progress
WFD – CIS Working group A ECOSTAT
Water Directors’ Meeting Working Group D (Reporting) activities
Introduction Prep-SCG meeting 13 Sept 2013.
Strategic Coordination Group
WG A Ecological Status Progress report April-October 2009
Water Directors meeting Mondorf-les-bains, June 2005
Harmonisation and standardisation – Status and way forward
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT 2013 – 2015 Tasks and Deliverables
Water Directors meeting Warsaw, 8-9 December 2011
Action points Who When WG GES 31 March March 2017
Working Group 2A ECOSTAT Guidance for the intercalibration process Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
WG A ECOSTAT Intercalibration guidance : Annexes III, V, VI
WFD CIS 4th Intercalibration Workshop
Hans Dufourmont Eurostat Unit E4 – Structural Funds
Eutrophication activity
Scene setter European Commission DG Environment
Standardisation/Harmonisation
Activity on Eutrophication
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
Common Implementation Strategy for the
WG A Ecological Status Progress report April-October 2010
Common Implementation Strategy for the
EU Water Framework Directive
WFD CIS WG ECOSTAT meeting on 8-9 October 2007 Objectives What do we need to achieve during this meeting?
WG A ECOSTAT Draft Mandate
Review of Decision 2010/477/EU and MSFD Annex III
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Intercalibration round 2: finalisation and open technical issues – RIVERS ECOSTAT October 2012.
EU Water Framework Directive
EU Water Framework Directive
Presentation transcript:

Harmonisation Activity Progress report Ana Cristina Cardoso

ECOSTAT 3-4 July 2006 Proposed way forward: To prepare a ‘Proposal version 2.0’ in light of comments received on version 1.0 and including new CEN working items To launch a 2nd Consultation phase in 31 July among ECOSTAT members Comments on version 2.0 to Harmonisation Steering Group on the 8 September Updated version 2.1 presented to the WFD Committee in 25 October

What was achieved All comments received on version 1.0 were considered and if appropriate included in a version 2.0 Fail to launch the 2nd consultation phase Modified the consultation plan

Revision of Standard methods in Annex V Draft list of standard methods to include in the Commission Decision for adaptation of section 1.3.6 of Annex V of the WFD Comments are of difficult interpretation for deciding the relevance of methods for the WFD It was decided to further consult ECOSTAT on this list of methods The current ‘Proposal version 2.0’ is intended to support experts in the consultation of the list methods

List of methods for consultation It will be distributed by email Monday, 16 October We want a yes/no response If no a short justification

Identification of future standardisation items Propose to hold a Workshop in Autumn 2007 with coast, lake and river expert networks Information on CEN new working items, GIGs and other relevant methods will be distributed before the workshop Result should be clear identification standardisation needs The results from the workshop will constitute the input to CEN

Thank you!