CDM v Asset Lifecycle Health and Safety Management

Slides:



Advertisements
Similar presentations
Infrastructure Planning Commission Workshop 2b Working with the IPC: Guidance and issues for promoters.
Advertisements

Insert event title and date (go to VIEW>MASTER>SLIDE MASTER to edit) Queenslan d Audit Office CPA Public Sector Discussion Group Paul Christensen A/Director.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
[Title of meeting] [Name of sponsor] [Date] For guidance on working with PowerPoint and reformatting slides, click on Help, then Microsoft PowerPoint Help,
Announcement – Impending Amendment to the Child Care Act 1991 – Registration of Early Years Service Fiona McDonnell National Specialist, Early Years Services.
Modernising Pharmacy Regulation An inspector calls: A new regulatory model in pharmacy Mark Voce Head of Inspection, GPhC Date.
Rosemary Smyth Mental Health Commission 17/09/2013.
Revalidation – Management and leadership 11 November 2014.
Conducting the IT Audit
Service Equality Team July 2005 Action for Equality Briefing.
Software as a Medical Device (SaMD) Application of Quality Management System IMDRF/WG/N23 Proposed Document (PD1)R3.
LESSON 8 Booklet Sections: 12 & 13 Systems Analysis.
UK Wide Core Skills & Training Framework Findings of 2 nd Stage Consultation and Implications for Development of the Framework.
1 Understanding CQC registration Summer Introduction to CQC.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Low Emission Strategy for Oxford Building on successful Partnership working between Oxford City Council and Oxfordshire County Council following recent.
Non-Motorised User (NMU) Audits Overview presentation Hertfordshire Highways Cycling Scrutiny Panel 14 th & 16 th October 2009.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Safe roads, Reliable journeys, Informed travellers “how the HA is addressing the needs of safety in future maintenance and construction within the design.
ROAD INFRASTRUCTURE SAFETY MANAGEMENT DIRECTIVE (RISM) Harry Cullen SPM Road Safety, National Roads Authority, Ireland Chairman of CEDR Technical Group.
Care and Support White Paper. Overview The Care and Support White Paper was published alongside the draft Care and Support Bill and a progress report.
Overview Interim Advice Note 85/06 Minor Improvements to Existing National Roads Development of Approach / Issues Identified NRA TA 85/11 Guidance on.
Stephanie Norris Partner, Purcell ‘Getting Building Work Done’ HRBA/Purcell event 09 June 2016.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
On completion of the scenario, students will be able to: Learning Outcomes 1 Critically analyse and prioritise information security risks. 2 Systematically.
Premises Assurance Model
Road Safety, in the Context of DfT Funding
STEP Program 2016/2017 Regional Forum – May 2017
Welcome and House Keeping
Rami Okasha Executive Director of Strategy and Improvement
Embedding the golden threads that lead to quality care every time……
Future Rail and Road developments
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Solihull Review of Urgent Care Programme Approach And Governance 2013
Fiona McDonnell National Specialist, Early Years Services
2016 IPWEAvic Public Works Conference
FDA’s IDE Decisions and Communications
Introduction to JASPERS and reflections on Sustainable Roads Kristian DUUS, JASPERS Roads Division, Vienna Regional Office.
A47 / A12 Corridor Improvement schemes
Midlands Connect: A Pan Midlands Strategic Transport Partnership
The ePhyto Solution A Guide to implement the ePhyto System
KEYNOTE STAGE SPONSOR.
DG Environment, Unit D.2 Marine Environment and Water Industry
Future Investment in the Strategic Road Network
Presentation Title: View > Header & Footer
Strawman Best Practice IIA Change Forum June 2017
FRAMEWORK FOR BUSINESS ACTION ON WASH
The IAASB’s Future Strategy
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Change Assurance Dashboard
Marine Strategy Framework Directive (MSFD)
STEP Program 2016/2017 Regional Forum – May 2017
LEAN DECISION MAKING CHOOSING BY ADVANTAGES PhD Randi Christensen, Head of Lean, Value Management and Innovation, Lower Thames Crossing, COWI.
Highways England CDM Audit Process (1)
Highways England CDM Audit Process (1)
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Safeguarding Adults local procedures
Leading Practice Implementation Guide
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Leading Practice Implementation Guide
OECD good practices for setting up an RIA system Regional Capacity-Building Seminar on Regulatory Impact Assessment Istanbul, Turkey 20 November 2007.
Legal issues in WFD implementation WD meeting 16 June 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European Commission.
Scottish Government Responsible for environment & flooding issues
KEYNOTE STAGE SPONSOR.
7. EAFM cycle overview Essential EAFM Date • Place 1.
Overview of the recommendations on software updates
5.b3 Monitoring & Reporting 2019
Concept paper on the assessment of WFD River Basin Management Plans
Xoserve IX Refresh Customer Update 01/05/2019.
Presentation transcript:

CDM v Asset Lifecycle Health and Safety Management May 2019

Aim To develop a model, standard and associated procedures that describe the Highways England approach to the asset including the Strategic Road Network (SRN) design, construction, maintenance and operational management. The model, standard and associated procedures will create a consistent framework for Highways England project, scheme and operational management to follow. Where possible the work will consider, replace and amalgamate existing standards, procedures, documents and guidance. Any model and associated documents will also ensure that regulatory requirements are met including CDM 2015.

Challenges Although the legislative requirements with CDM 2015 may be the pre-dominant element within supply chain and project management there are other considerations to be given. Within Major Projects the Project Control Framework has both health and safety associated products and requirements to be met. There has to be continual and further alignment with the PCF and CDM Regulations. This will make more practical sense to those in Major Projects. Other existing documentation including Interim Advice Notes (105) must be considered and amalgamated into the standard and procedures where possible. Work is carried out on the ‘Asset’ or Strategic Road Network (SRN) which may not be applicable to the CDM Regulations such as non intrusive surveys and inspections Access to the network by statutory undertakers may not be CDM applicable work but consents and management of the proposed work requires action from operational management is required. Due to the variances in work and approach to CDM together with the requirements of PCF and Frameworks a traditional approach to a CDM Standard could result in several procedures for the two different directorates (Operations and Major Projects).

Solution, the ‘Lifecycle’ Model The model allows the user to access a project at any stage and understand what should be in place and what is required to be done. The model includes and incorporates the PCF and other assurances which will need to undertaken. Both Major Projects and Operations can use the procedure and also see a visual link between design, development, construction, operation and maintenance.

Asset Health and Safety Management Lifecycle Preliminary Design Development Phase (PCF Stage 3, 4 & 5) Asset Health and Safety Management Lifecycle Renewal and alteration Strategy and Prioritisation Option Identification Option Selection Pre-project (PCF Stage 0) Statutory procedures and powers Construction Preparation Construction Commission and handover Options Phase (PCF Stage 1 & 2) Construction Phase (PCF Stage 6 & 7) Maintenance Operations De-Commission and demolition Continual asset and operational management

Renewal and alteration The Asset Lifecycle The blue inner circle identifies the various stages of an asset life. From concept and feasibility through design, development, construction, handover, operation, maintenance, alteration to the eventual decommission or demolition. Each stage (click link on each will be inserted) will have a procedure which will outline the requirements within the CDM2015 Regulations, the PCF products and other assurance requirements that may already be in place or will support the new standard. The procedures will have a summary of ‘Actions to be taken’ and link to relevant forms. Preliminary Design Renewal and alteration Strategy and Prioritisation Option Identification Option Selection Statutory procedures and powers Construction Preparation Construction Commission and handover Maintenance Operations De-Commission and demolition

Preliminary Design Development Phase (PCF Stage 3, 4 & 5) Strategy and Prioritisation Option Identification Option Selection Pre-project (PCF Stage 0) Statutory procedures and powers Construction Preparation Construction Commission and handover Options Phase (PCF Stage 1 & 2) Construction Phase (PCF Stage 6 & 7) The Asset Lifecycle The yellow outer circle highlights and visually aligns the PCF to the lifecycle, essentially the concept, design and construction. Click links could be inserted to take the user to the relevant section of the PCF handbook. This section will pre-dominantly used by the Major Projects division. Using an example, the Northern Trans-Pennine (A66) Project. The project has just entered stage two of the PCF. The Project team could easily access the appropriate stage and quickly understand from the Action Summary what should be in place and what is required to be done during stage two.

Renewal and alteration The Asset Lifecycle The outer grey circle identifies the stages which will be pre-dominantly managed by ‘Operations’, focusing on the constructed asset. Some work will not be associated with the CDM regulations, this may include access by statutory bodies such as Network Rail who require access to the network (asset) to undertake non-intrusive surveys. Although CDM may not be applicable a procedure for consent and possible monitoring is. Maintenance will be invariably associated with CDM however the procedure would be more onerous in terms of requirements than Major Projects working at design stage. Renewal and alteration Maintenance Operations De-Commission and demolition Continual asset and operational management

The Asset Lifecycle The model is a draft, there are comments, feedback and further collaboration required. We may lose a stage or add a stage for example depending on how the procedures develop. The wording or titles may also alter again during development but essentially the lifecycle model will be able to adapt to those changes and changes in the future.

Delivery…… A decision on the Standard structure and approach requires agreement as soon as possible due to the critical nature of the topic. Timescales for first draft (Procedures) will be end of May 2019 with collaboration and feedback end of June 2019. Roll out July 2019. I am happy to speak to, present and generally discuss the approach to ensure we get agreement and movement at the earliest opportunity.