Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Week 13: R. Assmann, J. Wenninger
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Day :00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed.
Saturday 24 March 2012.
Wire, flat beams and beam-beam MDs in 2017
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Status of LHC Operations
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
Mike Lamont, Jorg Wenninger
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Yesterday morning Held 1647 for a while – SPS kicker problem
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
MD Planning Fri – Sat (1. – 2.7.)
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Wednesday h18: 228b fill lost just before start of ramp.
Thursday Morning/Afternoon
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Another Immortal Fill…. OP dump after 13.7 hours to prepare for 90 m optics setting-up

Another Immortal Fill…. ~1/2 nominal intensity and ¼ of the nominal stored energy

Stats

Fill 1901 – 1380 bunches – R. Giachino Why lower luminosity? Fill 1901 – 1380 bunches – R. Giachino Activity in the H-plane (both beams) when the damper gain is reduced before starting the ramp  need to revisit when back from technical stop

Fill 1900 – 1236 bunches – R. Giachino Why lower luminosity? Fill 1900 – 1236 bunches – R. Giachino Already visible with 1236 bunches

Fill 1883 – 1092 bunches – R. Giachino Why lower luminosity? Fill 1883 – 1092 bunches – R. Giachino …and a tiny bit with 1092. This could explain why the increase in luminosity was marginal.

Why lower luminosity? Some differences in the emittance of the PSB rings (ring 4 has larger emittance)  could also be the effect of mis-steering at PS injection

Tue 28/6- Wed 29/6 16:00-19:20 Ramp down - Access for BI. Loading of 90 m optics hyper-cycle. Cleaning of the water cooling filters for cryo in point 2 in the shadow 19:20 start injection for 90 m optics

90 m optics setting-up (H. Burkhardt et al.) Feed-forward of simulated tune errors during the squeeze (S. Redaelli)

90 m optics setting-up (H. Burkhardt et al.)

90 m optics setting-up (H. Burkhardt et al.) IP5 lumi scan IP1 lumi scan

90 m optics setting-up (H. Burkhardt et al.) The beam tests were performed with one fat pilot of ~2.0e10p per beam to have collisions in IP1 and 5 and one pilot. The unsqueeze went well without any significant loss. Feed-forward of tune corrections (from simulations and measurements) was applied and worked well. Compared to the initial commissioning test, this time we ramped the collimators in IP3, 6 and 7 to the nominal ramp settings. TCT are set at coarse protection settings. ADT and longitudinal blow-up were not active during the ramp (to be followed up for higher intensities). Orbit corrections were performed at 30m and coupling corrections at 60m. Both were incorporated into the unsqueeze functions for the next commissioning test. We also used dynamic changes of the OFB reference orbit. The analysis of the response requires some off-line analysis. At 90m, we tested all the knobs for parallel separation and for lumi scans in IP1/5. They worked as expected.

90 m optics setting-up (H. Burkhardt et al.) The next step was optics measurements and corrections. It turned out that the AC dipole required for the precise optics measurements was not available and would require an access to get it working. The detailed global optics measurements could not be done. Local beta* measurements using k-modulation were done instead in IP1 and IP5. We then applied the global optics corrections determined in the first 90m MD and redid the local beta measurements with k-modulation. At 3:10, we collapsed the separation bumps and started to look for collisions. The counting rates were very low and required a combination of manual trims and optimization scans to center collisions. Both ALFA and TOTEM moved the vertical roman pots to 10 sigma and recorded some collisions in the last 30 minutes of the study.

Draft MD Planning Wed – Thu (29. – 30.6.) Day Time MD MP Wed 04:00 Ramp down, cycle 06:00 No beam: ATS optics checks w/o beam 08:00 Ramp down, cycle. 10:00 450 GeV: Injection 25ns – different SPS parameters, first look, transverse damper first look (no detailed setup for 25ns) B 16:00 450 GeV: RF setup for high bunch intensity A 22:00 450 GeV: 450 GeV  3.5 TeV: Beam instrumentation – high bunch intensity, … B/C Thu 450 GeV: Head-on beam-beam limit – up to 3e11p per bunch, coherent modes. BI parasitically. 450 GeV: Injecting nominal emittances, MKI & UFO’s – 50ns, blow-up in SPS, SPS scraping and losses, injection into LHC, nominal emittance. 07/06/2011 MD Planning 2011/12, MD#2

Experimental magnets ATLAS and CMS ramping down this morning ALICE and LHCb: we switch them off this morning

Draft MD Planning Fri – Sat (1. – 2.7.) Day Time MD MP Fri 01:00 Switch back to operational injection settings. Verification. 03:00 450 GeV  3.5 TeV: RF – longitudinal beam stability. B 16:00 Ramp down, cycle. 18:00 450 GeV  3.5 TeV: Long-range beam-beam limit – lifetime, emittance versus beam-beam separation. Collimation with changing crossing angle. C Sat 02:00 04:00 450 GeV: Non-linear dynamics – Dynamic aperture, non-linear chromaticity and frequency map. A 12:00 If needed: Precycle. 14:00 3.5 TeV: Collimation – combined cleaning, faster setup. 22:00 07/06/2011 MD Planning 2011/12, MD#2

Draft MD Planning Sun – Mon (3. – 4.7.) Day Time MD MP Sun 00:00 3.5 TeV: ATS – correction & pre-squeeze. A 08:00 Ramp down, cycle. 10:00 450 GeV: Beam distribution in LHC – scraping, halo, tails, BLM limits, … (high intensity) B 14:00 450 GeV: Quench margin at injection – observation with special QPS instrumentation, losses from TCLIB collimator, TCDQ checks in parallel C 22:00 450 GeV: R2E – slow controlled losses (1e13p on Q14.R2.B1). Mon 06:00 Technical Stop Needs from experiments: 30.6., 08:00 to 16:00 – Luminometers on in ATLAS and CMS 01.7., 18:00 to 02:00 – Luminometers on in ATLAS and CMS 07/06/2011 MD Planning 2011/12, MD#2