P55 – AIR 5493 Rewrite Team Members

Slides:



Advertisements
Similar presentations
Americas Aerospace Quality Group AAQG Project Management Project #54 AIR5359 Update Team Reported by: Vince May Date of Report:
Advertisements

Company Confidential Registration Management Committee (RMC) 1 Other Party Management Team (OPMT) Resolutions Stanley Faust Spirit AeroSystems Other Party.
Registration Management Committee (RMC) Other Party (OP) Assessor AS Workshop January 24, 2008 – Mesa, Arizona AAQG RMC 101 Registration Management.
Company Confidential 1 Americas Sector Report Colin Clarke Bombardier Aerospace 16 April 2010.
Company Confidential 1 Registration Management Committee (RMC) Report Boston, Massachusetts July 21, 2011 Vince May RMC Chair.
Prepared by: Tim Lee – Chair IAQG OPMT The Boeing Company October 10, 2013 International Aerospace Quality Group (IAQG) Other Party Management Team (OPMT)
AS9104/3 AUDITOR REQUIREMENTS - WHAT HAS CHANGED?
1 IAQG Other Party Management Team (OPMT) - Report to the IAQG General Assembly Montreal Canada – October 7 th, 2005 Michael C. Roberts IAQG OPMT Vice.
Company Confidential RMC Report July 20, Other Party Management (OPMT) Team General Council Report Tim Lee July 20, 2010.
Company Confidential Registration Management Committee (RMC) OP Assessor Process: Office and Witness Oversight San Diego, CA January 17, 2013 Melvin L.
Company Confidential Registration Management Committee (RMC) Summer Meeting Preparing for the Second Ballot Atlanta, GA July 20, 2010 Michael.
RMC Auditor Review Sub-team Report Sept 13, 2011 Long Beach, CA.
Company Confidential Registration Management Committee (RMC) AS9104/3 Update San Diego, CA 19 January 2011 Shanya Salamaca RABQSA International.
Other Party Management Team (OPMT) Status Briefing Americas Aerospace Quality Group (AAQG) Registration Management Committee (RMC) Tim Lee – Chair The.
Company Confidential 1 Registration Management Committee Communication Sub-team Report (Redondo Beach, California) Melvin L. Jeppson Systems Integration.
AAQG Project Report Out Each Team Leader / Project Champion:Each Team Leader / Project Champion: –Use the Project Plate as part of their project folder.
RMC Auditor Sub-team Report January 31, 2006 Orlando, Florida.
1 SAE AIR5359A Requirements for Registration of Quality Systems to AS9100 Nik Sutton Boeing IDS This briefing contains non technical data reviewed by Export.
Report September 17/18, 2013 Seattle, WA.
9104/1 Rewrite Team Report / Review to the AAQG-RMC 11 March 2009 Michael C Roberts Boeing, Technical Fellow.
31-May-16 chart 1 International Aerospace Quality Group Registrar Management Schemes SEPTEMBER 2002 Barb O'Dell.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
Americas Aerospace Quality Group AAQG Project #56 Harmonized Oversight Process AS91XX.
Other Party Management Team (OPMT) Status Briefing Americas Aerospace Quality Group (AAQG) Registration Management Committee (RMC) Tim Lee – Chair The.
Company Confidential Registration Management Committee (RMC) RABQSA Report Salt Lake City, UT 14 September 2010 Shanya Salamaca RABQSA International.
AAQG Project # 56 Harmonized Process/Standard Oversight / Surveillance Prepared by: Tim Lee The Boeing Company The Boeing Company June 7, 2005 June 7,
Company Confidential 1 AS9104/2A Oversight Standard Revision Report Tim Lee Project Chair September 11, 2012.
Issues RMC Meeting September 14, 2005 Sao Jose dos Campos Mike Roberts.
Company Confidential AAQG RMC Meeting April 6, Other Party Management (OPMT) Team AAQG RMC Report Tim Lee, The Boeing Company OPMT Chair April 6,
RMC Auditor Sub-team Report Sep 12, 2006 Mystic, CT.
1 IAQG Oversight Team Report (Other Party Management Team) (Abridged Version - mcr) Amsterdam – April 27 th, 2005 Julio Perez Caballero IAQG OPMT Chair.
Registration Management Committee (RMC) Other Party (OP) Assessor Workshop January 16, 2009 – Orlando, Florida AAQG RMC 101 Industry Controlled Other Party.
1 IAQG OPMT Workshop International Aerospace Quality Group Other Party Management Team Workshop Session #1 Melbourne, Australia April 18, 2007 Hosted by:
Company Confidential /2 Oversight Revision Report San Diego, CA 19 Jan 2011 Tim Lee Project Chair.
Company Confidential IAQG Workshop October 21, IAQG Workshop 9100 Certification Scheme Certification status – Changes implemented Tim Lee The Boeing.
Registration Management Committee (RMC) OP Assessor Workshop January 24, 2008 – Mesa, Arizona AAQG RMC Operating Procedures.
AS Report July 20, 2011 Boston, MA. Team Members  Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division  Shanya Salamaca  Rick Downs,
Registration Management Committee (RMC) January 22-24, 2008 Mesa, AZ AAQG RMC Documentation Sub Team Report AAQG Registration Management Committee Meeting.
Registration Management Committee (RMC) Auditor Training and Workshop Minneapolis, MN July 30-31, 2009 Americas Aerospace Quality Group AAQG Registration.
Report on AS/EN/SJAC 91xy Requirements for Aerospace Auditor Competency and Training January 30 & 31, 2006 February 1, 2006 Orlando, Florida.
Tim Lee The Boeing Company January 20, 2010
Other Party Management (OPMT) Team Strategy Working Group (SWG) Report
Auditor Review Team Report
Registrar Management Committee (RMC)
Oasis Data Mining January 22, 2008 Presented by: Patrice Bleau
AAQG Registrar Management Committee (RMC) SAE AS9104/AIR5359 OVERSIGHT RMC Procedure 102 REV 5 Changes 15-Sep-18.
Americas Aerospace Quality Group AAQG Project Management
George W. Bush AAQG RMC Workshop “Other Party Assessor Training”
WELCOME! Americas Aerospace Quality Group AAQG
RMC Auditor Sub-team Report January 22, 2008 Phoeniz, AZ
Americas Aerospace Quality Group AAQG Project Management
IAQG Other Party Management Team (OPMT) AAQG RMC Report
RMC Auditor Review Sub-team Report January 20, 2010 Redondo Beach, CA
RMC Auditor Review Sub-team Report January 17, 2012 San Diego, CA
Aerospace Auditor Workshop
WELCOME! Americas Aerospace Quality Group AAQG
RMC Auditor Review Sub-team Report Sep 14, 2010 Salt Lake City, UT
ICOP – Industry Controlled Other Party
Shanya Salamaca September 15, 2010
Mike Roberts Boeing Fort Worth Spring Meeting 6 April 2011
RMC Sub-team Report September 13-14, 2005 Sao Jose de Campos, Brazil
Tim Lee – Chair The Boeing Company July 13, 2012
9104/2 Oversight Revision Report
AAQG RMC Surveillance Team Report
September 2005 Registration Management Committee (RMC) Meeting
AAQG RMC Auditor Sub Team Report June 7-9, 2005 Savannah, Georgia
IAAR Report Reg Blake – Primary Representative
Tim Lee The Boeing Company Chair IAQG OPMT October 22, 2010
RMC Auditor Review Sub-team Report
Report to RMC AIR 5493 Rewrite /08 Savannah, Georgia
Presentation transcript:

Report to AAQG and RMC Project 55 AIR 5493 Rewrite 2005-09-13/14 San Jose dos Campos Brazil

P55 – AIR 5493 Rewrite Team Members Mike Roberts (Champion) Boeing (RMC Chair) Colin Clarke (Leader) Bombardier (Montreal CA) Hollie Last SCC (Ottawa CA) Carl Blazik IAAR Rep (SAI-CRS) (Maumee, OH) Shanya Salamaca RABQSA (Milwaukee Wisc.)

Issues to resolve EAQG concern with differentiation between AIEA and AEA APAQG request to include internal audits (should the document be limited to 3rd party audits?) Move oversight requirements to Lee document? Move CRB Competency requirements to another document and which one? Agreement on the term “Auditor Authentication” Include Aviation, Space and Defence or use AQMS? Where to put the 9003 auditor requirements (are they still needed?)

Tasks Develop America’s position for unresolved issues Sept 15, 2005 Not complete (AAQG-RMC) Provide final comments on drafts September 26, 2005 Meet with IAQG writing team to finalize documents October 3/4, 2005 (RMC writing team and IAQG writing team) Final approval by IAQG Fall 2005