NEA GIG COORDINATION.

Slides:



Advertisements
Similar presentations
National typologies - reports Presented by Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
Advertisements

Water Bodies in Europe: Integrated Systems to assess Ecological Status and Recovery Funded under FP7, Theme 6: Environment (including Climate Change) Contract.
WG 2A ECOSTAT 7-8 July 2004 Task on Harmonisation of Freshwater Biological Methods Status Report AC Cardoso and A Solimini Harmonisation Task Team: JRC.
Lake Intercalibration Presented by Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
Water Bodies in Europe: Integrated Systems to assess Ecological Status and Recovery Funded under FP7, Theme 6: Environment (including Climate Change) Contract.
Working Group A ECOSTAT Intercalibration Progress Coast GIGs JRC, Ispra, Italy, March 2005 Dave Jowett, Environment Agency (England and Wales), Coast.
ECOSTAT 1-2 October 2008 Intercalibration – status of ongoing work – Coastal/Transitional Presented by Wouter van de Bund Joint Research Centre Institute.
Framework for the intercalibration process  Must be simple  Aiming to identify and resolve big inconsistencies with the normative definitions and big.
Intercalibration Option 3 results: what is acceptable and what is not ? Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
Updating the intercalibration process guidance Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
GIG plan updates GIG leads were requested to update their work plans
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
NE ATLANTIC GEOGRAPHICAL INTERCALIBRATION GROUP (NEA GIG)
Task on Harmonisation of Freshwater Biological Methods
ECOSTAT, Bristol Hotel, Brussels,
Intercalibration in transitional waters (TW) Phase 2: Milestone 4 Reports (M4R) Presented by Nikolaos Zampoukas Joint Research Centre Institute for Environment.
CW-TW Intercalibration results
CW-TW Intercalibration work progress
Working Group A ECOSTAT October 2006 Summary/Conclusions
Results of the Coastal and Transitional Waters Metadata Analysis
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Progress on Intercalibration COAST GIGs
NE ATLANTIC GIG Lisbon 24th-25th January 2013
River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Draft Commission Decision on Intercalibration
River GIGs: Checking and completing the Decision Annex Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT Summary progress report River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Central-Baltic Rivers GIG progress
Working Group 2A ECOSTAT Intercalibration process - state of play Wouter van de Bund & Anna-Stiina Heiskanen Joint Research Centre Institute for Environment.
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, October 2005 Progress in the intercalibration exercise.
Harmonisation Activity Progress report
Intercalibration Timetable
Common Implementation Strategy for the
NE Atlantic GIG ECOSTAT April 2013 Summary of NE ATLANTIC GIG Workshop held in Lisbon (24th-25th January 2013) The Next Phase.
Update on progress since last WG meeting (13-14 June 2002)
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Working Group A ECOSTAT Update on intercalibration Prepared by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
CW-TW IC Work progress Fuensanta Salas Herrero, CW-TW IC Coordinator
CIS workshop : assessment of the ecological status.
Activities of WG A Ecological Status
NEA GIG lead and coordination
WG A Ecological Status Progress report April-October 2009
Water Directors meeting Mondorf-les-bains, June 2005
EU Water Framework Directive
Harmonisation and standardisation – Status and way forward
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT, Stresa, Italy, October 2005
IC remaining gaps: overview and way forward
Water Directors meeting Spa, 2-3 December 2010
Working Group 2A ECOSTAT Guidance for the intercalibration process Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
River groups with extension
WG A ECOSTAT Intercalibration guidance : Annexes III, V, VI
Lake Intercalibration – IC Decision Annexes + what to do in future
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
Lake Intercalibration
Common Implementation Strategy for the
WG A Ecological Status Progress report April-October 2010
Common Implementation Strategy for the
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Intercalibration round 2: finalisation and open technical issues – RIVERS ECOSTAT October 2012.
WG A Ecological Status Intercalibration: Where do we go from here ?
NORTH EAST ATLANTIC GIG
WG A Ecological Status Progress report October 2010 – May 2011
MED-GIG: Mediterranean Coastal
Baltic Sea GIG Status Ecostat 23 April 2013
Why are we reviewing reference conditions in intercalibration?
Presentation transcript:

NEA GIG COORDINATION

ECOSTAT MEETING CONCLUSIONS Broad agreement on the main issues that need to be addressed The Member States involved are in principle willing to jointly fund a specific project to address this issue (except Spain)

ECOSTAT MEETING CONCLUSIONS Norwegian Institute of Marine Research (IMR) elaborated a proposal it did not include all the tasks needed for the successful finalisation of the IC for benthic invertebrate and phytoplankton groups; it exceeded the estimated budget which MS were willing to contribute (MS are willing to contribute max 10 000 euro) BUT...

STEPS FOLLOWED AFTER ECOSTAT MEETING JRC has elaborated the main general tasks, in accordance to the Guidance on the Intercalibration Process, to fill in the gaps found in the CW-TW Phytoplankton and Benthic results JRC has started to identify possible BQE leads CW Benthic Invertebrates: 2 months TW: Benthic Invertebrates: 3-5 months CW: Phytoplankton: 5 months TW Phytoplankton: 5 months JRC has estimated the neccesary time to complete IC in CW-TW phytoplankton and benthic invertebrates groups

STEPS FOLLOWED AFTER ECOSTAT MEETING JRC has sent to Norway this new proposal to complete the IC A very positive answer from Norway, specifying that although IMR will not be able to do this work, Norway experts are able to carry out the IC phytoplankton and benthic invertebrates tasks.

NEA GIG Intercalibration: WORK IN PROGRESS The current working proposal - MS transfer the money to Norway (to which Institution?) max 10.000 euros/MS; - Norway contracts the experts (NO experts or externals experts suggested by JRC) to lead and to complete the tasks; - JRC assumes the role of general NEA GIG coordinator